350 resultados para Political-Strategic Project
Resumo:
On the 13th February 2008 Prime Minister Kevin Rudd made an apology to Australia’s Indigenous Peoples on behalf of the Australian Parliament. The State Library of Queensland (SLQ) with assistance from Queensland University of Technology and Queensland’s Aboriginal and Torres Strait Islander communities, has captured responses to this historic event. ‘Responses to the 2008 Apology’ is a collection of digital stories created as part of this research initiative. Until recently, digital storytelling has not generally been treated as a necessary addition to the research collections of Australian libraries. However, libraries increasingly aim to promote new literacies and active audiences as they seek innovative ways to encourage life-long learning by their users, and digital storytelling is one methodology that can contribute to these goals. The State Library of Queensland is the only Australian State Library to have undertaken a major role in the collection of digital stories. They currently lead the way with their Queensland Stories digital storytelling program. This presentation will report findings and outcomes from this research project.
Resumo:
Information security policy defines the governance and implementation strategy for information security in alignment with the corporate risk policy objectives and strategies. Research has established that alignment between corporate concerns may be enhanced when strategies are developed concurrently using the same development process as an integrative relationship is established. Utilizing the corporate risk management framework for security policy management establishes such an integrative relationship between information security and corporate risk management objectives and strategies. There is however limitation in the current literature on presenting a definitive approach that fully integrates security policy management with the corporate risk management framework. This paper presents an approach that adopts a conventional corporate risk management framework for security policy development and management to achieve alignment with the corporate risk policy. A case example is examined to illustrate the alignment achieved in each process step with a security policy structure being consequently derived in the process. It is shown that information security policy management outcomes become both integral drivers and major elements of the corporate-level risk management considerations. Further study should involve assessing the impact of the use of the proposed framework in enhancing alignment as perceived in this paper.
Resumo:
This paper argues, somewhat along a Simmelian line, that political theory may produce practical and universal theories like those developed in theoretical physics. The reasoning behind this paper is to show that the theory of ‘basic democracy’ may be true by way of comparing it to Einstein’s Special Relativity – specifically concerning the parameters of symmetry, unification, simplicity, and utility. These parameters are what make a theory in physics as meeting them not only fits with current knowledge, but also produces paths towards testing (application). As the theory of ‘basic democracy’ may meet these same parameters, it could settle the debate concerning the definition of democracy. This will be argued firstly by discussing what the theory of ‘basic democracy’ is and why it differs from previous work; secondly by explaining the parameters chosen (as in why these and not others confirm or scuttle theories); and thirdly by comparing how Special Relativity and the theory of ‘basic democracy’ may match the parameters.
Resumo:
The use of appropriate financial incentives within construction projects can contribute to strong alignment of project stakeholder motivation with project goals. However, effective incentive system design can be a challenging task and takes skillful planning by client managers in the early stages of a project. In response to a lack of information currently available to construction clients in this area, this paper explores the features of a successful incentive system and identifies key learnings for client managers to consider when designing incentives. Our findings, based on data from a large Australian case study, suggest that key stakeholders place greater emphasis on the project management processes that support incentives than on the incentive itself. Further, contractors need adequate time and information to accurately estimate construction costs prior to their tender price submission to ensure cost-focused incentive goals remain achievable. Thus, client managers should be designing incentives as part of a supportive procurement strategy to maximize project stakeholder motivation and prevent goal misalignment.
Resumo:
Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.
Resumo:
Organisations owning and managing infrastructure asset are constantly striving to obtain the greatest lifetime value from their infrastructure assets. Many such organisations have adopted the concept of “asset management” with the aim of improving the performance of their infrastructure assets. This paper evaluates the adoption of asset management to improve performance in the context of organisations managing infrastructure assets. Relevant previous research studies on main barriers to the adoption of asset management are reviewed. Analysis of these findings, together with deductive reasoning, leads to the development of the proposed improvement strategies. Three issues were identified as barrier to the advancement of the concept of asset management. They are (1) lack of recognition, (2) fragmentation; and (3) growing complexity. To overcome these issues, this paper suggests that the organisations manage infrastructure assets must (1) adopt a more strategic approach in the management of infrastructure assets, (2) develop a framework of strategic infrastructure asset management processes, and (3) identify the core capabilities needed in the management of infrastructure assets. This paper presents the direction for further research to advance the concept of asset management in the management of infrastructure asset.
Resumo:
Purpose – The purpose of this paper is to examine the role of three strategies - organisational, business and information system – in post implementation of technological innovations. The findings reported in the paper are that improvements in operational performance can only be achieved by aligning technological innovation effectiveness with operational effectiveness. Design/methodology/approach – A combination of qualitative and quantitative methods was used to apply a two-stage methodological approach. Unstructured and semi structured interviews, based on the findings of the literature, were used to identify key factors used in the survey instrument design. Confirmatory factor analysis (CFA) was used to examine structural relationships between the set of observed variables and the set of continuous latent variables. Findings – Initial findings suggest that organisations looking for improvements in operational performance through adoption of technological innovations need to align with operational strategies of the firm. Impact of operational effectiveness and technological innovation effectiveness are related directly and significantly to improved operational performance. Perception of increase of operational effectiveness is positively and significantly correlated with improved operational performance. The findings suggest that technological innovation effectiveness is also positively correlated with improved operational performance. However, the study found that there is no direct influence of strategiesorganisational, business and information systems (IS) - on improvement of operational performance. Improved operational performance is the result of interactions between the implementation of strategies and related outcomes of both technological innovation and operational effectiveness. Practical implications – Some organisations are using technological innovations such as enterprise information systems to innovate through improvements in operational performance. However, they often focus strategically only on effectiveness of technological innovation or on operational effectiveness. Such a focus will be detrimental in the long-term of the enterprise. This research demonstrated that it is not possible to achieve maximum returns through technological innovations as dimensions of operational effectiveness need to be aligned with technological innovations to improve their operational performance. Originality/value – No single technological innovation implementation can deliver a sustained competitive advantage; rather, an advantage is obtained through the capacity of an organisation to exploit technological innovations’ functionality on a continuous basis. To achieve sustainable results, technology strategy must be aligned with organisational and operational strategies. This research proposes the key performance objectives and dimensions that organisations should focus to achieve a strategic alignment. Research limitations/implications – The principal limitation of this study is that the findings are based on investigation of small sample size. There is a need to explore the appropriateness of influence of scale prior to generalizing the results of this study.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.
Resumo:
There is a need for educational frameworks for computer ethics education. This discussion paper presents an approach to developing students’ moral sensitivity, an awareness of morally relevant issues, in project-based learning (PjBL). The proposed approach is based on a study of IT professionals’ levels of awareness of ethics. These levels are labelled My world, The corporate world, A shared world, The client’s world and The wider world. We give recommendations for how instructors may stimulate students’ thinking with the levels and how the levels may be taken into account in managing a project course and in an IS department. Limitations of the recommendations are assessed and issues for discussion are raised.
Resumo:
Background and Aim: To investigate participation in a second round of colorectal cancer screening using a fecal occult blood test (FOBT) in an Australian rural community, and to assess the demographic characteristics and individual perspectives associated with repeat screening. ---------- Methods: Potential participants from round 1 (50–74 years of age) were sent an intervention package and asked to return a completed FOBT (n = 3406). Doctors of participants testing positive referred to colonoscopy as appropriate. Following screening, 119 participants completed qualitative telephone interviews. Multivariable logistic regression models evaluated the association between round-2 participation and other variables.---------- Results: Round-2 participation was 34.7%; the strongest predictor was participation in round 1. Repeat participants were more likely to be female; inconsistent screeners were more likely to be younger (aged 50–59 years). The proportion of positive FOBT was 12.7%, that of colonoscopy compliance was 98.6%, and the positive predictive value for cancer or adenoma of advanced pathology was 23.9%. Reasons for participation included testing as a precautionary measure or having family history/friends with colorectal cancer; reasons for non-participation included apathy or doctors’ advice against screening.---------- Conclusion: Participation was relatively low and consistent across rounds. Unless suitable strategies are identified to overcome behavioral trends and/or to screen out ineligible participants, little change in overall participation rates can be expected across rounds.
Resumo:
As a result of the managerial reforms adopted by government agencies since the 1980s, the stakeholder approach has become more widely accepted as a strategic management tool. However it remains a difficult and demanding task for agencies to determine who their stakeholders are and to optimise interactions with them. This paper examines how government agencies identify, classify and engage with stakeholders who have competing demands, differing access to resources and the ability to exert political pressure. To do this, the stakeholder approaches of nine agencies at three levels of government in Queensland were studied. This resulted in the development of a Stakeholder Classification Model for Public Agencies which could be used to create more focused and relevant stakeholder interventions.
Resumo:
Establishing the core principals of “entrepreneurial management” within an organization describes a certain strategic choice that affects a company in six dimensions, according to Stevenson (1983). Our aim is to empirically measure entrepreneurial management (it’s existence and degree) and to link this measured strategic choice (for or against) entrepreneurial management with firm performance. Our argument here is that companies that follow core principals of entrepreneurial management should outperform other more administrative firms in certain measures of strategic performance. This paper builds on an empirical investigation published by Brown, Davidson & Wiklund (2001), who have developed and tested a reliable measurement instrument for Stevenson’s definition of “entrepreneurial management” (Stevenson 1983, Stevenson & Jarillo 1990). In the first part of our paper we aim to replicate and to some extent improve this study. In the second part we link the measured degree of “entrepreneurial management” with firm performance. To our knowledge, even so Stevenson’s definition of entrepreneurial management is commonly acknowledged and Brown et al. (2001) developed a reliable instrument to empirically capture this behavioral approach to management, the construct of entrepreneurial management never before has been linked to firm performance in an empirical study. Since most papers on corporate entrepreneurship and firm performance are based on Covin & Slevin’s (1991) or Miller’s (1983) concept of entrepreneurial orientation, we contribute to the literature on corporate entrepreneurship in a novel way, given the fact that the entrepreneurial management dimensions measured in our study can theoretically and empirically be clearly distinguished from the construct of entrepreneurial orientation as defined by Covin & Selvin (1991).
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
Resumo:
In sustainable development projects, as well as other types of projects, knowledge transfer is important for the organisations managing the project. Nevertheless, knowledge transfer among employees does not happen automatically and it has been found that the lack of social networks and the lack of trust among employees are the major barriers to effective knowledge transfer. Social network analysis has been recognised as a very important tool for improving knowledge transfer in the project environment. Transfer of knowledge is more effective where it depends heavily on social networks and informal dialogue. Based on the theory of social capital, social capital consists of two parts: conduits network and resource exchange network. This research studies the relationships among performance, the resource exchange network (such as the knowledge network) and the relationship network (such as strong ties network, energy network, and trust network) at the individual and project levels. The aim of this chapter is to present an approach to overcoming the lack of social networks and lack of trust to improve knowledge transfer within project-based organisations. This is to be done by identifying the optimum structure of relationship networks and knowledge networks within small and medium projects. The optimal structure of the relationship networks and knowledge networks is measured using two dimensions: intra-project and inter-project. This chapter also outlines an extensive literature review in the areas of social capital, knowledge management and project management, and presents the conceptual model of the research approach.