352 resultados para Infrastructure and Construction Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Decision Support System (DSS) has played a significant role in construction project management. This has been proven that a lot of DSS systems have been implemented throughout the whole construction project life cycle. However, most research only concentrated in model development and left few fundamental aspects in Information System development. As a result, the output of researches are complicated to be adopted by lay person particularly those whom come from a non-technical background. Hence, a DSS should hide the abstraction and complexity of DSS models by providing a more useful system which incorporated user oriented system. To demonstrate a desirable architecture of DSS particularly in public sector planning, we aim to propose a generic DSS framework for consultant selection. It will focus on the engagement of engineering consultant for irrigation and drainage infrastructure. The DSS framework comprise from operational decision to strategic decision level. The expected result of the research will provide a robust framework of DSS for consultant selection. In addition, the paper also discussed other issues that related to the existing DSS framework by integrating enabling technologies from computing. This paper is based on the preliminary case study conducted via literature review and archival documents at Department of Irrigation and Drainage (DID) Malaysia. The paper will directly affect to the enhancement of consultant pre-qualification assessment and selection tools. By the introduction of DSS in this area, the selection process will be more efficient in time, intuitively aided qualitative judgment, and transparent decision through aggregation of decision among stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, practitioners and researchers alike have turned their attention to knowledge management (KM) in order to increase organisational performance (OP). As a result, many different approaches and strategies have been investigated and suggested for how knowledge should be managed to make organisations more effective and efficient. However, most research has been undertaken in the for-profit sector, with only a few studies focusing on the benefits nonprofit organisations might gain by managing knowledge. This study broadly investigates the impact of knowledge management on the organisational performance of nonprofit organisations. Organisational performance can be evaluated through either financial or non-financial measurements. In order to evaluate knowledge management and organisational performance, non-financial measurements are argued to be more suitable given that knowledge is an intangible asset which often cannot be expressed through financial indicators. Non-financial measurement concepts of performance such as the balanced scorecard or the concept of Intellectual Capital (IC) are well accepted and used within the for-profit and nonprofit sectors to evaluate organisational performance. This study utilised the concept of IC as the method to evaluate KM and OP in the context of nonprofit organisations due to the close link between KM and IC: Indeed, KM is concerned with managing the KM processes of creating, storing, sharing and applying knowledge and the organisational KM infrastructure such as organisational culture or organisational structure to support these processes. On the other hand, IC measures the knowledge stocks in different ontological levels: at the individual level (human capital), at the group level (relational capital) and at the organisational level (structural capital). In other words, IC measures the value of the knowledge which has been managed through KM. As KM encompasses the different KM processes and the KM infrastructure facilitating these processes, previous research has investigated the relationship between KM infrastructure and KM processes. Organisational culture, organisational structure and the level of IT support have been identified as the main factors of the KM infrastructure influencing the KM processes of creating, storing, sharing and applying knowledge. Other research has focused on the link between KM and OP or organisational effectiveness. Based on existing literature, a theoretical model was developed to enable the investigation of the relation between KM (encompassing KM infrastructure and KM processes) and IC. The model assumes an association between KM infrastructure and KM processes, as well as an association between KM processes and the various levels of IC (human capital, structural capital and relational capital). As a result, five research questions (RQ) with respect to the various factors of the KM infrastructure as well as with respect to the relationship between KM infrastructure and IC were raised and included into the research model: RQ 1 Do nonprofit organisations which have a Hierarchy culture have a stronger IT support than nonprofit organisations which have an Adhocracy culture? RQ 2 Do nonprofit organisations which have a centralised organisational structure have a stronger IT support than nonprofit organisations which have decentralised organisational structure? RQ 3 Do nonprofit organisations which have a stronger IT support have a higher value of Human Capital than nonprofit organisations which have a less strong IT support? RQ 4 Do nonprofit organisations which have a stronger IT support have a higher value of Structural Capital than nonprofit organisations which have a less strong IT support? RQ 5 Do nonprofit organisations which have a stronger IT support have a higher value of Relational Capital than nonprofit organisations which have a less strong IT support? In order to investigate the research questions, measurements for IC were developed which were linked to the main KM processes. The final KM/IC model contained four items for evaluating human capital, five items for evaluating structural capital and four items for evaluating relational capital. The research questions were investigated through empirical research using a case study approach with the focus on two nonprofit organisations providing trade promotions services through local offices worldwide. Data for the investigation of the assumptions were collected via qualitative as well as quantitative research methods. The qualitative study included interviews with representatives of the two participating organisations as well as in-depth document research. The purpose of the qualitative study was to investigate the factors of the KM infrastructure (organisational culture, organisational structure, IT support) of the organisations and how these factors were related to each other. On the other hand, the quantitative study was carried out through an online-survey amongst staff of the various local offices. The purpose of the quantitative study was to investigate which impact the level of IT support, as the main instrument of the KM infrastructure, had on IC. Overall several key themes were found as a result of the study: • Knowledge Management and Intellectual Capital were complementary with each other, which should be expressed through measurements of IC based on KM processes. • The various factors of the KM infrastructure (organisational culture, organisational structure and level of IT support) are interdependent. • IT was a primary instrument through which the different KM processes (creating, storing, sharing and applying knowledge) were performed. • A high level of IT support was evident when participants reported higher level of IC (human capital, structural capital and relational capital). The study supported previous research in the field of KM and replicated the findings from other case studies in this area. The study also contributed to theory by placing the KM research within the nonprofit context and analysing the linkage between KM and IC. From the managerial perspective, the findings gave clear indications that would allow interested parties, such as nonprofit managers or consultants to understand more about the implications of KM on OP and to use this knowledge for implementing efficient and effective KM strategies within their organisations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Innovation Management (IM) in most knowledge based firms is used on an adhoc basis where senior managers use this term to leverage competitive edge without understanding its true meaning and how its robust application in organisation impacts organisational performance. There have been attempts in the manufacturing industry to harness the innovative potential of the business and apprehend its use as a point of difference to improve financial and non financial outcomes. However further work is required to innovatively extrapolate the lessons learnt to introduce incremental and/or radical innovation to knowledge based firms. An international structural engineering firm has been proactive in exploring and implementing this idea and has forged an alliance with the Queensland University of Technology to start the Innovation Management Program (IMP). The aim was to develop a permanent and sustainable program with which innovation can be woven through the fabric of the organisation. There was an intention to reinforce the firms’ vision and reinvigorate ideas and create new options that help in its realisation. This paper outlines the need for innovation in knowledge based firms and how this consulting engineering firm reacted to this exigency. The development of the Innovation Management Program, its different themes (and associated projects) and how they integrate to form a holistic model is also discussed. The model is designed around the need of providing professional qualification improvement opportunities for staff, setting-up organised, structured & easily accessible knowledge repositories to capture tacit and explicit knowledge and implement efficient project management strategies with a view to enhance client satisfaction. A Delphi type workshop is used to confirm the themes and projects. Some of the individual projects and their expected outcomes are also discussed. A questionnaire and interviews were used to collect data to select appropriate candidates responsible for leading these projects. Following an in-depth analysis of preliminary research results, some recommendations on the selection process will also be presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The valuation and property is an evolving industry and the participants within the industry are also changing. This change is due to improved technology and construction, global nature of business today, professional standards, legal and accounting issues and environmental matters. Throughout this change in the property industry, there has also been significant change in the structure and content of tertiary property courses in Australia. Over the past thirteen years each first year cohort commencing study in the property program at the University of Western Sydney have been surveyed in relation to their background, reasons for course selection and job expectations. This paper will review this annual survey and the profile of all first year students who commenced their studies in the Bachelor of Business (Property) degree [formerly Bachelor of Commerce (Property Economics) and Bachelor of Commerce (Land Economy)] for years commencing 1994 to 2006. The paper will also provide a detailed analysis of the type of student entering the property industry and their exposure to the valuation and property sectors prior to commencing their studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When complex projects go wrong they can go horribly wrong with severe financial consequences. We are undertaking research to develop leading performance indicators for complex projects, metrics to provide early warning of potential difficulties. The assessment of success of complex projects can be made by a range of stakeholders over different time scales, against different levels of project results: the project’s outputs at the end of the project; the project’s outcomes in the months following project completion; and the project’s impact in the years following completion. We aim to identify leading performance indicators, which may include both success criteria and success factors, and which can be measured by the project team during project delivery to forecast success as assessed by key stakeholders in the days, months and years following the project. The hope is the leading performance indicators will act as alarm bells to show if a project is diverting from plan so early corrective action can be taken. It may be that different combinations of the leading performance indicators will be appropriate depending on the nature of project complexity. In this paper we develop a new model of project success, whereby success is assessed by different stakeholders over different time frames against different levels of project results. We then relate this to measurements that can be taken during project delivery. A methodology is described to evaluate the early parts of this model. Its implications and limitations are described. This paper describes work in progress.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Achieving and sustaining competitive advantage is a major challenge for firms in today’s dynamic global marketplace. The notion of sustained competitive advantage has been investigated through a number of paradigms, from the resource based view of the firm to dynamic capabilities. This paper reports preliminary findings from research which investigates the characteristics of innovative firms that have demonstrated competitive advantage over time, targeting factors that contribute to the firm’s performance. Key factors to sustaining competitive advantage include working with demanding customers, team based organizational cultures, engaging in challenging projects to make new to the world products, and using projects to generate the necessity for learning by doing, learning by using and learning by interacting in new product and process development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Heart disease is attributed as the highest cause of death in the world. Although this could be alleviated by heart transplantation, there is a chronic shortage of donor hearts and so mechanical solutions are being considered. Currently, many Ventricular Assist Devices (VADs) are being developed worldwide in an effort to increase life expectancy and quality of life for end stage heart failure patients. Current pre-clinical testing methods for VADs involve laboratory testing using Mock Circulation Loops (MCLs), and in vivo testing in animal models. The research and development of highly accurate MCLs is vital to the continuous improvement of VAD performance. The first objective of this study was to develop and validate a mathematical model of a MCL. This model could then be used in the design and construction of a variable compliance chamber to improve the performance of an existing MCL as well as form the basis for a new miniaturised MCL. An extensive review of literature was carried out on MCLs and mathematical modelling of their function. A mathematical model of a MCL was then created in the MATLAB/SIMULINK environment. This model included variable features such as resistance, fluid inertia and volumes (resulting from the pipe lengths and diameters); compliance of Windkessel chambers, atria and ventricles; density of both fluid and compressed air applied to the system; gravitational effects on vertical columns of fluid; and accurately modelled actuators controlling the ventricle contraction. This model was then validated using the physical properties and pressure and flow traces produced from a previously developed MCL. A variable compliance chamber was designed to reproduce parameters determined by the mathematical model. The function of the variability was achieved by controlling the transmural pressure across a diaphragm to alter the compliance of the system. An initial prototype was tested in a previously developed MCL, and a variable level of arterial compliance was successfully produced; however, the complete range of compliance values required for accurate physiological representation was not able to be produced with this initial design. The mathematical model was then used to design a smaller physical mock circulation loop, with the tubing sizes adjusted to produce accurate pressure and flow traces whilst having an appropriate frequency response characteristic. The development of the mathematical model greatly assisted the general design of an in vitro cardiovascular device test rig, while the variable compliance chamber allowed simple and real-time manipulation of MCL compliance to allow accurate transition between a variety of physiological conditions. The newly developed MCL produced an accurate design of a mechanical representation of the human circulatory system for in vitro cardiovascular device testing and education purposes. The continued improvement of VAD test rigs is essential if VAD design is to improve, and hence improve quality of life and life expectancy for heart failure patients.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is known to be an important contributor towards the gross domestic product of many countries. Moreover, the health of the construction industry is positively correlated to the economic growth of a country and in many economies public sector clients account for a major share of construction works. Given this strength, it is important for public sector clients to initiate innovations aimed at the betterment of the industry. In this context, concern about sustainable development has been a major driver of some innovative initiatives in construction industries worldwide. Furthermore, the Government of Hong Kong regards both sustainability and community development as important criteria when planning and procuring construction projects. This paper is based on a case study of a public sector development project in Hong Kong, and presents the salient features of the procurement and contractual systems adopted in the project, which foster sustainability and community development. The reported interim findings are based on a preliminary document analysis that is part of an ongoing longitudinal case study into the project. The document analysis takes a three-pronged approach in terms of how the procurement and contractual systems foster economic, environmental and social sustainability, and sums up their impact on the community as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Successful project delivery of construction projects depends on many factors. With regard to the construction of a facility, selecting a competent contractor for the job is paramount. As such, various approaches have been advanced to facilitate tender award decisions. Essentially, this type of decision involves the prediction of a bidderÕs performance based on information available at the tender stage. A neural network based prediction model was developed and presented in this paper. Project data for the study were obtained from the Hong Kong Housing Department. Information from the tender reports was used as input variables and performance records of the successful bidder during construction were used as output variables. It was found that the networks for the prediction of performance scores for Works gave the highest hit rate. In addition, the two most sensitive input variables toward such prediction are ‘‘Difference between Estimate’’ and ‘‘Difference between the next closest bid’’. Both input variables are price related, thus suggesting the importance of tender sufficiency for the assurance of quality production.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Adjuvant use of nutritional and herbal medicines has potential to increase the efficacy of synthetic pharmaceuticals, and perhaps also decrease their side-effects by allowing lower doses to be prescribed. We evaluated current evidence for adjuvant use of nutritional and herbal medicines with antidepressants, mood stabilizers and benzodiazepines; and explored novel future areas of research. The paper also critiques current evidence for co-administration of St. John’s wort with synthetic antidepressants. We performed a systematic search of MEDLINE, CINAHL, PsycINFO, The Cochrane database, China National Knowledge Infrastructure and the Chinese Science Citation Database. Search results were supplemented by a review of reference lists and a forward search using the Web of Science. Where possible we calculated effect sizes. Encouraging evidence exists for the use of omega-3 fatty acids, SAMe, folic acid and l-tryptophan adjuvantly with antidepressants to enhance response and improve efficacy. Various nutrients also have emerging evidence as effective adjuncts with antipsychotics and mood stabilizers. While some evidence supports nutritional adjuvancy with various psychopharmacotherapies, adjuvant use of herbal therapies has not been sufficiently studied to warrant standard clinical application. This remains a promising area of research via robust, safety-conscious studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the challenges of transfer of training back to the workplace for programme and project managers who are being groomed for the leadership of large and complex projects. The paper draws on the experience of the development and delivery of Queensland University of Technology (QUT) education programs: an Executive Masters of Complex Project Management and a series of Continuing Professional Development (CPD) events for an Australian government agency, Defence Materiel Organisation (DMO). Drawing on notions of ‘far transfer’ (Laker 1990; Noe, 1986) and ‘transfer climate’ (Kozlowski & Salas, 1993; Yamnill & McLean, 2001), the paper describes the steps undertaken to achieve a design that ensures that programme and project leadership skills developed through these corporate education programs become successfully embedded back in the organisation. Further, the paper reports on a small qualitative study where the programme success was evaluated by the organisational sponsor, senior leaders and program participants. Nine interviews were conducted and analysed to identify the success of far transfer and transfer climate four months after the return of program participants from cohort 1 2008 to the workplace.