468 resultados para Concurrent networks
Resumo:
The flexible design of decoupling and matching networks for coupled antennas is introduced. The network includes three parts: circuits for impedance transformation, an element for odd-mode decoupling and conventional matching networks. It is found that all three parts are determined by one parameter of the ABCD matrix of the impedance transformation circuit. Thus a large variety of circuits with different element values can be used for decoupling which relaxes the practical design constraints.
Resumo:
For industrial wireless sensor networks, maintaining the routing path for a high packet delivery ratio is one of the key objectives in network operations. It is important to both provide the high data delivery rate at the sink node and guarantee a timely delivery of the data packet at the sink node. Most proactive routing protocols for sensor networks are based on simple periodic updates to distribute the routing information. A faulty link causes packet loss and retransmission at the source until periodic route update packets are issued and the link has been identified as broken. We propose a new proactive route maintenance process where periodic update is backed-up with a secondary layer of local updates repeating with shorter periods for timely discovery of broken links. Proposed route maintenance scheme improves reliability of the network by decreasing the packet loss due to delayed identification of broken links. We show by simulation that proposed mechanism behaves better than the existing popular routing protocols (AODV, AOMDV and DSDV) in terms of end-to-end delay, routing overhead, packet reception ratio.
Resumo:
Introduction The culture in many team sports involves consumption of large amounts of alcohol after training/competition. The effect of such a practice on recovery processes underlying protein turnover in human skeletal muscle are unknown. We determined the effect of alcohol intake on rates of myofibrillar protein synthesis (MPS) following strenuous exercise with carbohydrate (CHO) or protein ingestion. Methods In a randomized cross-over design, 8 physically active males completed three experimental trials comprising resistance exercise (8×5 reps leg extension, 80% 1 repetition maximum) followed by continuous (30 min, 63% peak power output (PPO)) and high intensity interval (10×30 s, 110% PPO) cycling. Immediately, and 4 h post-exercise, subjects consumed either 500 mL of whey protein (25 g; PRO), alcohol (1.5 g·kg body mass−1, 12±2 standard drinks) co-ingested with protein (ALC-PRO), or an energy-matched quantity of carbohydrate also with alcohol (25 g maltodextrin; ALC-CHO). Subjects also consumed a CHO meal (1.5 g CHO·kg body mass−1) 2 h post-exercise. Muscle biopsies were taken at rest, 2 and 8 h post-exercise. Results Blood alcohol concentration was elevated above baseline with ALC-CHO and ALC-PRO throughout recovery (P<0.05). Phosphorylation of mTORSer2448 2 h after exercise was higher with PRO compared to ALC-PRO and ALC-CHO (P<0.05), while p70S6K phosphorylation was higher 2 h post-exercise with ALC-PRO and PRO compared to ALC-CHO (P<0.05). Rates of MPS increased above rest for all conditions (~29–109%, P<0.05). However, compared to PRO, there was a hierarchical reduction in MPS with ALC-PRO (24%, P<0.05) and with ALC-CHO (37%, P<0.05). Conclusion We provide novel data demonstrating that alcohol consumption reduces rates of MPS following a bout of concurrent exercise, even when co-ingested with protein. We conclude that alcohol ingestion suppresses the anabolic response in skeletal muscle and may therefore impair recovery and adaptation to training and/or subsequent performance.
Resumo:
Electric Energy Storage (EES) is considered as one of the promising options for reducing the need for costly upgrades in distribution networks in Queensland (QLD). However, It is expected, the full potential for storage for distribution upgrade deferral cannot be fully realized due to high cost of EES. On the other hand, EES used for distribution deferral application can support a variety of complementary storage applications such as energy price arbitrage, time of use (TOU) energy cost reduction, wholesale electricity market ancillary services, and transmission upgrade deferral. Aggregation of benefits of these complementary storage applications would have the potential for increasing the amount of EES that may be financially attractive to defer distribution network augmentation in QLD. In this context, this paper analyzes distribution upgrade deferral, energy price arbitrage, TOU energy cost reduction, and integrated solar PV-storage benefits of EES devices in QLD.
Resumo:
Arid systems are markedly different from non-arid systems. This distinctiveness extends to arid-social networks, by which we mean social networks which are influenced by the suite of factors driving arid and semi-arid regions. Neither the process of how aridity interacts with social structure, nor what happens as a result of this interaction, is adequately understood. This paper postulates three relative characteristics which make arid-social networks distinct: that they are tightly bound, are hierarchical in structure and, hence, prone to power abuses, and contain a relatively higher proportion of weak links, making them reactive to crisis. These ideas were modified from workshop discussions during 2006. Although they are neither tested nor presented as strong beliefs, they are based on the anecdotal observations of arid-system scientists with many years of experience. This paper does not test the ideas, but rather examines them in the context of five arid-social network case studies with the aim of hypotheses building. Our cases are networks related to pastoralism, Aboriginal outstations, the ‘Far West Coast Aboriginal Enterprise Network’ and natural resources in both the Lake-Eyre basin and the Murray–Darling catchment. Our cases highlight that (1) social networks do not have clear boundaries, and that how participants perceive their network boundaries may differ from what network data imply, (2) although network structures are important determinants of system behaviour, the role of participants as individuals is still pivotal, (3) and while in certain arid cases weak links are engaged in crisis, the exact structure of all weak links in terms of how they place participants in relation to other communities is what matters.
Resumo:
The producer has for many years been a central agent in recording studio sessions; the validation of this role was, in many ways, related to the producer’s physical presence in the studio, to a greater or lesser extent. However, improvements in the speed of digital networks have allowed studio sessions to be produced long-distance, in real-time, through communication programs such as Skype or REDIS. How does this impact on the role of the producer, a “nexus between the creative inspiration of the artist, the technology of the recording studio, and the commercial aspirations of the record company” (Howlett 2012)? From observations of a studio recording session in Lisbon produced through Skype from New York, this article focuses on the role of the producer in these relatively new recording contexts involving long distance media networks. Methodology involved participant observation carried out in Estúdios Namouche in Lisbon (where the session took place), as part of doctoral research. This ethnographic approach also included a number of semi-directed ethnographic interviews of the different actors in this scenario—musicians, recording engineers, composers and producers. As a theoretical framework, the research of De Zutter and Sawyer on Distributed Creativity is used, as the recording studio sets an example of “a cognitive system where […] tasks are not accomplished by separate individuals, but rather through the interactions of those individuals” (DeZutter 2009:4). Therefore, creativity often emerges as a result of this interaction.
Resumo:
Single phase distributed energy resources (DERs) can cause voltage rise along distribution feeder and power imbalance among the phases. Usually transformer tap setting are used to mitigate voltage drop along feeders. However this can aggravate the voltage rise problem when DERs are connected. Moreover if the power generation in a phase is more than its load demand, the excess power in that phase will be fed back to the transmission network. In this paper, a unified power quality compensator (UPQC) has been utilized to alleviate the voltage quality excess power circulation problems. Through analysis and simulation results, the mode of operation of UPQC is highlighted. The proposals are validated through extensive digital computer simulation studies using PSCAD and MATLAB.
Resumo:
This paper presents an optimisation algorithm to maximize the loadability of single wire earth return (SWER) by minimizing the cost of batteries and regulators considering the voltage constraints and thermal limits. This algorithm, that finds the optimum location of batteries and regulators, uses hybrid discrete particle swarm optimization and mutation (DPSO + Mutation). The simulation results on realistic highly loaded SWER network show the effectiveness of using battery to improve the loadability of SWER network in a cost-effective way. In this case, while only 61% of peak load can be supplied without violating the constraints by existing network, the loadability of the network is increased to peak load by utilizing two battery sites which are located optimally. That is, in a SWER system like the studied one, each installed kVA of batteries, optimally located, supports a loadability increase as 2 kVA.
Resumo:
A novel intelligent online demand management system is discussed in this chapter for peak load management in low voltage residential distribution networks based on the smart grid concept. The discussed system also regulates the network voltage, balances the power in three phases and coordinates the energy storage within the network. This method uses low cost controllers, with two-way communication interfaces, installed in costumers’ premises and at distribution transformers to manage the peak load while maximizing customer satisfaction. A multi-objective decision making process is proposed to select the load(s) to be delayed or controlled. The efficacy of the proposed control system is verified by a MATLAB-based simulation which includes detailed modeling of residential loads and the network.
Resumo:
This paper presents an analytical method to analyze the effect of X to R ratio as well as impedance value of branches on observability of a network based on un-decoupled formulation of state estimation (SE) and null space of matrices. The results showed that the X to R ratio of branches had no effect on the observability of networks. In addition, it was shown that observability of some networks was affected by impedance values while some others were not affected. In addition, for branch observability analysis of radial network, a simple and quick method is developed. Illustrative examples of the network under transmission and distribution voltages demonstrate the effectiveness of the proposed methods.
Resumo:
To minimise the number of load sheddings in a microgrid (MG) during autonomous operation, islanded neighbour MGs can be interconnected if they are on a self-healing network and an extra generation capacity is available in the distributed energy resources (DER) of one of the MGs. In this way, the total load in the system of interconnected MGs can be shared by all the DERs within those MGs. However, for this purpose, carefully designed self-healing and supply restoration control algorithm, protection systems and communication infrastructure are required at the network and MG levels. In this study, first, a hierarchical control structure is discussed for interconnecting the neighbour autonomous MGs where the introduced primary control level is the main focus of this study. Through the developed primary control level, this study demonstrates how the parallel DERs in the system of multiple interconnected autonomous MGs can properly share the load of the system. This controller is designed such that the converter-interfaced DERs operate in a voltage-controlled mode following a decentralised power sharing algorithm based on droop control. DER converters are controlled based on a per-phase technique instead of a conventional direct-quadratic transformation technique. In addition, linear quadratic regulator-based state feedback controllers, which are more stable than conventional proportional integrator controllers, are utilised to prevent instability and weak dynamic performances of the DERs when autonomous MGs are interconnected. The efficacy of the primary control level of the DERs in the system of multiple interconnected autonomous MGs is validated through the PSCAD/EMTDC simulations considering detailed dynamic models of DERs and converters.
Resumo:
In this paper, a loss reduction planning in electric distribution networks is presented based on the successful experiences in distribution utilities of IRAN and some developed countries. The necessary technical and economical parameters of planning are calculated from related projects in IRAN. Cost, time, and benefits of every sub-program including seven loss reduction approaches are determined. Finally, the loss reduction program, the benefit per cost, and the return of investment in optimistic and pessimistic conditions are introduced.
Resumo:
Introduction Informal caring networks contribute significantly to end-of-life (EOL) care in the community. However, to ensure that these networks are sustainable, and unpaid carers are not exploited, primary carers need permission and practical assistance to gather networks together and negotiate the help they need. Our aim in this study was to develop an understanding of how formal and informal carers work together when care is being provided in a dying person's home. We were particularly interested in formal providers’ perceptions and knowledge of informal networks of care and in identifying barriers to the networks working together. Methods Qualitative methods, informed by an interpretive approach, were used. In February-July 2012, 10 focus groups were conducted in urban, regional, and rural Australia comprising 88 participants. Findings Our findings show that formal providers are aware, and supportive, of the vital role informal networks play in the care of the dying at home. A number of barriers to formal and informal networks working together more effectively were identified. In particular, we found that the Australian policy of health-promoting palliative is not substantially translating to practice. Conclusion Combinations of formal and informal caring networks are essential to support people and their primary carers. Formal service providers do little to establish, support, or maintain the informal networks although there is much goodwill and scope for them to do so. Further re-orientation towards a health-promoting palliative care and community capacity building approach is suggested.
Resumo:
Many emerging economies are dangling the patent system to stimulate bio-technological innovations with the ultimate premise that these will improve their economic and social growth. The patent system mandates full disclosure of the patented invention in exchange of a temporary exclusive patent right. Recently, however, patent offices have fallen short of complying with such a mandate, especially for genetic inventions. Most patent offices provide only static information about disclosed patent sequences and even some do not keep track of the sequence listing data in their own database. The successful partnership of QUT Library and Cambia exemplifies advocacy in Open Access, Open Innovation and User Participation. The library extends its services to various departments within the university, builds and encourages research networks to complement skills needed to make a contribution in the real world.
Resumo:
Installation of domestic rooftop photovoltaic cells (PVs) is increasing due to feed–in tariff and motivation driven by environmental concerns. Even though the increase in the PV installation is gradual, their locations and ratings are often random. Therefore, such single–phase bi–directional power flow caused by the residential customers can have adverse effect on the voltage imbalance of a three–phase distribution network. In this chapter, a voltage imbalance sensitivity analysis and stochastic evaluation are carried out based on the ratings and locations of single–phase grid–connected rooftop PVs in a residential low voltage distribution network. The stochastic evaluation, based on Monte Carlo method, predicts a failure index of non–standard voltage imbalance in the network in presence of PVs. Later, the application of series and parallel custom power devices are investigated to improve voltage imbalance problem in these feeders. In this regard, first, the effectiveness of these two custom power devices is demonstrated vis–à–vis the voltage imbalance reduction in feeders containing rooftop PVs. Their effectiveness is investigated from the installation location and rating points of view. Later, a Monte Carlo based stochastic analysis is utilized to investigate their efficacy for different uncertainties of load and PV rating and location in the network. This is followed by demonstrating the dynamic feasibility and stability issues of applying these devices in the network.