454 resultados para Case Management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

For fuel management and/or ecological reasons prescribed burnings are conducted each year across Australia. Smoke from prescribed burnings could be the major source of air pollution in urban environment during the period of intensive prescribed burning. To investigate the impact of prescribed burning on air quality and the characteristics of prescribed burning particles, field measurements were conducted during the end period of a prescribed burning event in September 2011, Brisbane, Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Higher ambient temperatures will increase heat stress on workers, leading to impacts upon their individual health and productivity. In particular, research has indicated that higher ambient temperatures can increase the prevalence of urolithiasis. This thesis examines the relationship between ambient heat exposure and urolithiasis among outdoor workers in a shipbuilding company in Guangzhou, China, and makes recommendations for minimising the possible impacts of high ambient temperatures on urolithiasis. A retrospective 1:4 matched case-control study was performed to investigate the association between ambient heat exposure and urolithiasis. Ambient heat exposure was characterised by total exposure time, type of work, department and length of service. The data were obtained from the affiliated hospital of the shipbuilding company under study for the period 2003 to 2010. A conditional logistic regression model was used to estimate the association between heat exposure and urolithiasis. This study found that the odds ratio (OR) of urolithiasis for total exposure time was 1.5 (95% confidence interval (CI): 1.2–1.8). Eight types of work in the shipbuilding company were investigated, including welder, assembler, production security and quality inspector, planing machine operator, spray painter, gas-cutting worker and indoor employee. Five out of eight types of work had significantly higher risks for urolithiasis, and four of the five mainly consisted of outdoors work with ORs of 4.4 (95% CI: 1.7–11.4) for spray painter, 3.8 (95% CI: 1.9–7.2) for welder, 2.7 (95% CI: 1.4–5.0) for production security and quality inspector, and 2.2 (95% CI: 1.1–4.3) for assembler, compared to the reference group (indoor employee). Workers with abnormal blood pressure (hypertension) were more likely to have urolithiasis with an OR of 1.6 (95% CI: 1.0–2.5) compared to those without hypertension. This study contributes to the understanding of the association between ambient heat exposure and urolithiasis among outdoor workers in China. In the context of global climate change, this is particularly important because rising temperatures are expected to increase the prevalence of urolithiasis among outdoor workers, putting greater pressure on productivity, occupational health management and health care systems. The results of this study have clear implications for public health policy and planning, as they indicate that more attention is required to protect outdoor workers from heat-related urolithiasis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Having a reliable understanding about the behaviours, problems, and performance of existing processes is important in enabling a targeted process improvement initiative. Recently, there has been an increase in the application of innovative process mining techniques to facilitate evidence-based understanding about organizations' business processes. Nevertheless, the application of these techniques in the domain of finance in Australia is, at best, scarce. This paper details a 6-month case study on the application of process mining in one of the largest insurance companies in Australia. In particular, the challenges encountered, the lessons learned, and the results obtained from this case study are detailed. Through this case study, we not only validated existing `lessons learned' from other similar case studies, but also added new insights that can be beneficial to other practitioners in applying process mining in their respective fields.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Much has been written about varieties of collaboration and the interplay between conflict and collaboration in industrial relations. This paper explores the preconditions, processes and outcomes associated with the collaborative strategies of an Australian retail trade union: the Shop, Distributive and Allied Employees' Association. The data were collected from an extensive series of interviews with officials and organisers within the union across all Australian states. We find that despite taking a servicing approach, and indeed never aggressively organising members, the union has managed to achieve a range of outcomes that exceed retail employment conditions in other countries. We argue that this is partly a result of the Australian legislative framework, which is inherently pluralist and supportive of collective bargaining. This environment, whereby unions are not forced to fight to represent members, can be conducive to collaborative employment relations, particularly in industries where the parties do not adopt an adversarialist stance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

After some years of remarkable growth, the scholarly field of Project Management (PM) research currently finds itself in a crucial stage of development. In this editorial, we make an analysis of submissions to PM's premier specialty journal, the International Journal of Project Management over the period 2007–2010, and argue that one of the most important ways in which PM research can further evolve is to pay more attention to the mundane, yet important, act of good reviewing — an activity that we believe has received relatively little attention in the PM community thus far. Let us begin by considering the crucial juncture that, as a scholarly discipline, PM is currently at. On the one hand, the PM research field is characterized by signs of major progress. For one, there has been a strong growth in terms of published output: recent years have seen the publication of three major edited volumes with a central focus on PM, published by top-tier publishers (Cattani et al., 2011, Kenis et al., 2009 and Morris et al., 2011); the PM/temporary organizations literature published in ISI ranked peer-reviewed articles is growing exponentially (Bakker, 2010); and besides some of the long-standing PM specialty journals, the field has recently seen the rise of a number of new journals, including the International Journal of Managing Projects in Business, the International Journal of Project Organisation and Management, and the Journal of Project, Program, and Portfolio Management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

First year Property Economics students enrolled in the Bachelor of Urban Development at QUT are required to undertake a number of compulsory subjects, alongside students undertaking studies in other disciplines. One such common unit is ‘Stewardship of Land’, an interdisciplinary unit that introduces students to the characteristics of land and land tenure with a focus on land use and property rights. It covers a range of issues including: native title, land contamination, heritage values, alternative uses, the property development process, impact of environmental and social factors, and the management of land, both urban and regional. Teaching such a diverse content to a diverse audience has in previous years proved difficult, from the perspectives of relevance, engagement and content overload. In 2011 a project was undertake to redevelop this unit to reflect ‘threshold concepts’, concepts that are “transformative, probably irreversible, integrative, often troublesome and probably bounded” (Meyer & Land, 2003) . This project involved the development of a new set of underlying concepts students should draw from the unit, application of these to the unit curriculum, and a survey of the student response to these changes. This paper reports on the threshold concepts developed for this unit, the changes this made to the unit curriculum, and a preliminary report on survey responses. Recommendations for other educators seeking to incorporate threshold concepts into their curricula are provided.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Empirical research in business process management(BPM) is coming of age. In 2009, when the inaugural ER-BPM workshop was held, the field of BPM research was characterized by a strong emphasis on solution development, but also by an increasing demand for insights or evaluations of BPM technology based on dedicated empirical research strategies. The ER-BPM workshop series was created to provide an international forum for researchers to discuss and present such research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Incorporating design thinking as a generic capability at a school level is needed to ensure future generations are empowered for business innovation and active citizenship. This paper describes the methodology of an investigation into modelling design led innovation approaches from the business sector to secondary education, as part of a larger study. It builds on a previously discussed research agenda by outlining the scope, significance and limitations of currently available research in this area, examining an action research methodology utilising an Australian design immersion program case study, and discussing implications and future work. It employs a triangulated approach encompassing thematic analysis of qualitative data collection from student focus groups, semi-structured convergent interviews with teachers and facilitators, and student journals. Eventual outcomes will be reviewed and analysed within the framework of a proposed innovation matrix model for educational growth, synthesising principles responding to 21st century student outcomes. It is anticipated this research will inform a successful design led secondary education innovation model, facilitating new engagement frameworks between tertiary and secondary education sectors, as well as providing new insight into the suitability of action research in prototyping social innovation in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study seeks to answer the question of “why is policy innovation in Indonesia, in particular reformed state asset management laws and regulations, stagnant?” through an empirical and qualitative approach, identifying and exploring potential impeding influences to the full and equal implementation of said laws and regulations. The policies and regulations governing the practice of state asset management has emerged as an urgent question among many countries worldwide (Conway, 2006; Dow, Gillies, Nichols, & Polen, 2006; Kaganova, McKellar, & Peterson, 2006; McKellar, 2006b) for there is heightened awareness of the complex and crucial role that state assets play in public service provision. Indonesia is an example of such country, introducing a ‘big-bang’ reform in state asset management laws, policies, regulations, and technical guidelines. Two main reasons propelled said policy innovation: a) world-wide common challenges in state asset management practices - such as incomplete information system, accountability, and governance adherence/conceptualisation (Kaganova, McKellar and Peterson 2006); and b) unfavourable state assets audit results in all regional governments across Indonesia. The latter reasoning is emphasised, as the Indonesian government admits to past neglect in ensuring efficiency and best practice in its state asset management practices. Prior to reform there was euphoria of building and developing state assets and public infrastructure to support government programs of the day. Although this euphoria resulted in high growth within Indonesia, there seems to be little attention paid to how state assets bought/built is managed. Up until 2003-2004 state asset management is considered to be minimal; inventory of assets is done manually, there is incomplete public sector accounting standards, and incomplete financial reporting standards (Hadiyanto 2009). During that time transparency, accountability, and maintenance state assets was not the main focus, be it by the government or the society itself (Hadiyanto 2009). Indonesia exemplified its enthusiasm in reforming state asset management policies and practices through the establishment of the Directorate General of State Assets in 2006. The Directorate General of State Assets have stressed the new direction that it is taking state asset management laws and policies through the introduction of Republic of Indonesia Law Number 38 Year 2008, which is an amended regulation overruling Republic of Indonesia Law Number 6 Year 2006 on Central/Regional Government State Asset Management (Hadiyanto, 2009c). Law number 38/2008 aims to further exemplify good governance principles and puts forward a ‘the highest and best use of assets’ principle in state asset management (Hadiyanto, 2009a). The methodology of this study is that of qualitative case study approach, with a triangulated data collection method of document analysis (all relevant state asset management laws, regulations, policies, technical guidelines, and external audit reports), semi-structured interviews, and on-site observation. Empirical data of this study involved a sample of four Indonesian regional governments and 70 interviews, performed during January-July 2010. The analytical approach of this study is that of thematic analysis, in an effort to identify common influences and/or challenges to policy innovation within Indonesia. Based on the empirical data of this study specific impeding influences to state asset management reform is explored, answering the question why innovative policy implementation is stagnant. An in-depth analysis of each influencing factors to state asset management reform, and the attached interviewee’s opinions for each factor, suggests the potential of an ‘excuse rhetoric’; whereby the influencing factors identified are a smoke-screen, or are myths that public policy makers and implementers believe in; as a means to explain innovative policy stagnancy. This study offers insights to Indonesian policy makers interested in ensuring the conceptualisation and full implementation of innovative policies, particularly, although not limited to, within the context of state asset management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.