735 resultados para Inter-firm Project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project selection is a complex decision-making process as it involves multiple objectives, constraints and stakeholders. Understanding the organisation, in particular organisational culture, is an essential stage in improving decision-making process. The influences of organisational culture on decision-making can be seen in the way people work as a team, act and cooperate in their teamwork to achieve the set goals, and also in how people think, prioritize and decide. This paper aims to give evidence of the impact of organisational culture on the decision-making process in project selection, in the Indonesian context. Data was collected from a questionnaire survey developed based on the existing models of organisational culture (Denison 1990, Hofstede 2001, and Glaser et al 1987). Four main cultural traits (involvement, consistency, mission and power-distance) were selected and employed to examine the influence of organisational culture on the effectiveness of decision-making in the current Indonesian project selection processes. The results reveal that there are differences in organisational cultures for two organisations in three provinces. It also suggests that organisational culture (particularly the traits of ‘involvement’, ‘consistency’ and ‘mission’) contribute to the effectiveness of decision-making in the selected cases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Patient privacy and confidentiality (PPaC) is an important consideration for nurses and other members of the health care team. Can a patient expect to have confidentiality and in particular privacy in the current climate of emergency health care? Do staff who work in the Emergency Department (ED) see confidentiality as an important factor when providing emergency care? These questions are important to consider. Methods: This is a two phased quality improvement project, developed and implemented over a six month period in a busy regional, tertiary referral ED. Results: Issues identified for this department included department design and layout, overcrowding due to patient flow and access block, staff practices and department policies which were also impacted upon by culture of the team, and use of space. Conclusions: Changes successful in improving this issue include increased staff awareness about PPaC, intercom paging prior to nursing handover to remove visitors during handover, one visitor per patient policy, designated places for handover, allocated bed space for patient reviews/assessment and a strategy to temporarily move the patient if procedures would have been undertaken in shared bed space. These are important issues when considering policy, practice and department design in the ED.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Attracting quality teachers to rural areas is an ongoing international concern. Teacher education institutions have been criticised for contributing to this problem by failing to raise an awareness of teaching in rural areas in their teacher education programs. This study investigates preservice teachers’ perceptions towards teaching in rural areas after participating in a rural experience through the Over the Hill project. A self-selected group of second and third year preservice teachers from a regional campus of an urban Queensland university participated in a six-day rural experience, which included being billeted with local families, attending local community events and observing and teaching in rural primary and secondary schools. Data collected from the preservice teachers before and after the rural teaching experience were analysed to reveal positive perceptions towards teaching and living in rural communities. The findings revealed that even a brief immersion into rural schooling communities can positively influence preservice teachers’ attitudes towards seeking rural teaching placements. These findings have implications for the ways in which teacher education institutions can promote rural teaching opportunities in their teacher education programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been an abundance of education reform recommendations for teaching and teacher education as a result of national and international reviews. A major criticism in education is the lack of connection between theory and practice (or praxis), that is, how the learning at university informs practical applications for teaching in the classroom. This paper presents the Teacher Education Done Differently (TEDD) project, funded by the Department of Education, Employment and Workplace Relations (DEEWR). It outlines how it has re-structured its offering of coursework in a Bachelor of Education (BEd) held at an Australian university campus to embrace praxis. Establishing partnerships was crucial to the development of this project. TEDD initially gathered a reference group of educators, which included university staff, school executives, and other key stakeholders, who formed an Advisory Group and Steering Committee. These groups formed a collective vision for TEDD and aimed to motivate others, foster team work, and create leadership roles that would benefit all stakeholders. The paper presents how university units changed to include a stronger praxis development for preservice teachers. Preservice teachers take their learning into schools within lead-up programs such as Ed Start for practicum I, III, and IV; Science in Schools, and Studies of Society and its Environment (SOSE). Findings showed that opportunities for undertaking additional real-world experiences were perceived to assist the preservice teachers’ praxis development. Additional school-based experiences as lead-up days for field experiences and as avenues for exploring the teaching of specific subject areas presented as an opportunity for enhancing education for all.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ICT degrees in most Australian universities have a sequence of up to three programming subjects, or units. BABELnot is an ALTC-funded project that will document the academic standards associated with those three subjects in the six participating universities and, if possible, at other universities. This will necessitate the development of a rich framework for describing the learning goals associated with programming. It will also be necessary to benchmark exam questions that are mapped onto this framework. As part of the project, workshops are planned for ACE 2012, ICER 2012 and ACE 2013, to elicit feedback from the broader Australasian computing education community, and to disseminate the project’s findings. The purpose of this paper is to introduce the project to that broader Australasian computing education community and to invite their active participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is a formative evaluation of the operations of the DEEWR funded Stronger Smarter Learning Community (SSLC) project from September 2009 to July 2011. It is undertaken by an independent team of researchers from Queensland University of Technology, the University of Newcastle and Harvard University. It reports on findings from: documentary analysis; qualitative case studies of SSLC Hub schools; descriptive, multivariate and multilevel analysis of survey data from school leaders and teachers from SSLC Hub and Affiliate schools and from a control group of non-SSLC schools; and multilevel analysis of school-level data on SSLC Hubs, Affiliates and ACARA like-schools. Key findings from this work are that: • SSLC school leaders and teachers are reporting progress in changing school ethos around issues of: recognition of Indigenous identity, Indigenous leadership, innovative approaches to staffing and school models, Indigenous community engagement and high expectations leadership; • Many Stronger Smarter messages are reportedly having better uptake in schools with high percentages of Indigenous students; • There are no major or consistent patterns of differences between SSLC and non-SSLC schools in teacher and school leader self-reports of curriculum and pedagogy practices; and • There is no evidence to date that SSLC Hubs and Affiliates have increased attendance or increased achievement gains compared to ACARA like-schools. Twenty-one months is relatively early in this school reform project. Hence the major focus of subsequent reports will be on the documentation of comparative longitudinal gains in achievement tests and improved attendance. The 2011 and 2012 research also will model the relationships between change in school ethos/climate, changed Indigenous community relations, improved curriculum/pedagogy, and gains in Indigenous student achievement, attendance and outcomes. The key challenge for SSLC and the Stronger Smarter approach will be whether it can systematically generate change and reform in curriculum and pedagogy practices that can be empirically linked to improved student outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia’s mass market fashion labels have traditionally benefitted from their peripheral location to the world’s fashion centres. Operating a season behind, Australian mass market designers and buyers were well-placed to watch trends play out overseas before testing them in the Australian marketplace. For this reason, often a designer’s role was to source and oversee the manufacture of ‘knock-offs’, or close copies of Northern hemisphere mass market garments. Both Weller (2007) and Walsh (2009) have commented on this practice. The knock-on effect from this continues to be a cautious, derivative fashion sensibility within Australian mass market fashion design, where any new trend or product is first tested and proved overseas months earlier. However, there is evidence that this is changing. The rapid online dissemination of global fashion trends, coupled with the Australian consumer’s willingness to shop online, has meant that the ‘knock-off’ is less viable. For this reason, a number of mass market companies are moving away from the practice of direct sourcing and are developing product in-house under a Northern hemisphere model. This shift is also witnessed in the trend for mass market companies to develop collections in partnership with independent Australian designers. This paper explores the current and potential effects of these shifts within Australian mass market design practice, and discusses how they may impact on designers, consumers and on the wider culture of Australian fashion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The success of many knowledge-intensive industries depends on creative projects that lie at the heart of their logic of production. The temporality of such projects, however, is an issue that is insufficiently understood. To address this, we study the perceived time frame of teams that work on creative projects and its effects on project dynamics. An experiment with 267 managers assigned to creative project teams with varying time frames demonstrates that compared to creative project teams with a relatively longer time frame, project teams with a shorter time frame focus more on the immediate present, are less immersed in their task, and utilize a more heuristic mode of information processing. Furthermore, we find that time frame moderates the negative effect of team conflict on team cohesion. These results are consistent with our theory that the temporary nature of creative projects shapes different time frames among project participants, and that it is this time frame that is an important predictor of task and team processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rats are superior to the most advanced robots when it comes to creating and exploiting spatial representations. A wild rat can have a foraging range of hundreds of meters, possibly kilometers, and yet the rodent can unerringly return to its home after each foraging mission, and return to profitable foraging locations at a later date (Davis, et al., 1948). The rat runs through undergrowth and pipes with few distal landmarks, along paths where the visual, textural, and olfactory appearance constantly change (Hardy and Taylor, 1980; Recht, 1988). Despite these challenges the rat builds, maintains, and exploits internal representations of large areas of the real world throughout its two to three year lifetime. While algorithms exist that allow robots to build maps, the questions of how to maintain those maps and how to handle change in appearance over time remain open. The robotic approach to map building has been dominated by algorithms that optimise the geometry of the map based on measurements of distances to features. In a robotic approach, measurements of distance to features are taken with range-measuring devices such as laser range finders or ultrasound sensors, and in some cases estimates of depth from visual information. The features are incorporated into the map based on previous readings of other features in view and estimates of self-motion. The algorithms explicitly model the uncertainty in measurements of range and the measurement of self-motion, and use probability theory to find optimal solutions for the geometric configuration of the map features (Dissanayake, et al., 2001; Thrun and Leonard, 2008). Some of the results from the application of these algorithms have been impressive, ranging from three-dimensional maps of large urban strucutures (Thrun and Montemerlo, 2006) to natural environments (Montemerlo, et al., 2003).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we develop a conceptual model to explore the perceived complementary congruence between complex project leaders and the demands of the complex project environment to understand how leaders’ affective and behavioural performance at work might be impacted by this fit. We propose that complex project leaders high in emotional intelligence and cognitive flexibility should report a higher level of fit between themselves and the complex project environment. This abilities-demands measure of fit should then relate to affective and behavioural performance outcomes, such that leaders who perceive a higher level of fit should establish and maintain more effective, higher quality project stakeholder relationships than leaders who perceive a lower level of fit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power relations and small and medium-sized enterprise strategies for capturing value in global production networks: visual effects (VFX) service firms in the Hollywood film industry, Regional Studies. This paper provides insights into the way in which non-lead firms manoeuvre in global value chains in the pursuit of a larger share of revenue and how power relations affect these manoeuvres. It examines the nature of value capture and power relations in the global supply of visual effects (VFX) services and the range of strategies VFX firms adopt to capture higher value in the global value chain. The analysis is based on a total of thirty-six interviews with informants in the industry in Australia, the United Kingdom and Canada, and a database of VFX credits for 3323 visual products for 640 VFX firms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.