366 resultados para INTERNATIONAL STRATEGY


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Although there are recommendations for the management of osteoarthritis (OA), little is known about how people with OA actually manage this chronic condition. Purpose The aims of this study were to identify the non-pharmacological and pharmacological therapies most commonly used for the management of hip or knee OA, in a community-based sample of adults, and to compare these with evidence-based recommendations. Methods A questionnaire was mailed to 2200 adult members of Arthritis Queensland living in Brisbane, Australia. It included questions about OA symptoms, management therapies and demographic characteristics. Results Of the 485 participants (192 men, 293 women) with hip or knee OA who completed the questionnaire, most had mild to moderate symptoms. Ninety-six percent of participants (aged 27–95 years) reported using at least one non-pharmacological therapy, and 78% reported using at least one pharmacological therapy. The most common currently used non-pharmacological strategy was range-of-motion exercises (men 52%, women 61%, p=0.05) and the most common frequently used pharmacological strategy was glucosamine/chondroitin (men 51%, women 60%, ns). For the most highly recommended strategies, 65% of men and 54% of women had never attended an information/education course (p=0.04), and fewer than half (46% of women and 42% of men, p=0.03) were frequent users of anti-inflammatory agents. Conclusion The findings suggest that many people with knee or hip OA do not follow the most highly endorsed of the OARSI (Osteoarthritis Research Society International) recommendations for management of OA. Health professionals should be encouraged to recommend evidence-based therapies to their patients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Immigrant Entrepreneurs (IE) are often portrayed as being pushed into self-employment due to employment barriers in their adopted countries. But IE have human resources, like international experience, which can help them form international new ventures (INV). We question the role of IE in INV. We use randomly selected data from 561 young firms from the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE) project. We find that IE are overrepresented in INV and have many of the characteristics known to facilitate INV success. These findings have relevance to policy makers, IE and NE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Urban water quality can be significantly impaired by the build-up of pollutants such as heavy metals and volatile organics on urban road surfaces due to vehicular traffic. Any control strategy for the mitigation of traffic related build-up of heavy metals and volatile organic pollutants should be based on the knowledge of their build-up processes. In the study discussed in this paper, the outcomes of a detailed experiment investigation into build-up processes of heavy metals and volatile organics are presented. It was found that traffic parameters such as average daily traffic, volume over capacity ratio and surface texture depth had similar strong correlations with the build-up of heavy metals and volatile organics. Multicriteria decision analyses revealed that the 1 - 74 um particulate fraction of total suspended solids (TSS) could be regarded as a surrogate indicator for particulate heavy metals in build-up and this same fraction of total organic carbon could be regarded as a surrogate indicator for particulate volatile organics build-up. In terms of pollutants affinity, TSS was found to be the predominant parameter for particulate heavy metals build-up and total dissolved solids was found to be the predominant parameter for he potential dissolved particulate fraction in heavy metals build-up. It was also found that land use did not play a significant role in the build-up of traffic generated heavy metals and volatile organics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Multilevel converters are used in high power and high voltage applications due to their attractive benefits in generating high quality output voltage. Increasing the number of voltage levels can lead to a reduction in lower order harmonics. Various modulation and control techniques are introduced for multilevel converters like Space Vector Modulation (SVM), Sinusoidal Pulse Width Modulation (SPWM) and Harmonic Elimination (HE) methods. Multilevel converters may have a DC link with equal or unequal DC voltages. In this paper a new modulation technique based on harmonic elimination method is proposed for those multilevel converters that have unequal DC link voltages. This new technique has better effect on output voltage quality and less Total Harmonic Distortion (THD) than other modulation techniques. In order to verify the proposed modulation technique, MATLAB simulations are carried out for a single-phase diode-clamped inverter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an era of rapidly changing economic, social and environmental conditions, urban and regional planning education must be resilient, innovative and able to deal with the complex political and socio-economic fabric of post-modern cities. As a consequence, urban and regional planning education plays a fundamental role in educating and forming planning practitioners that will be able to tackle such complexity. However, not many tertiary education institutions provide a trans-cultural engagement opportunity for students, where the need to internationalise planning education has been widely recognised worldwide. The aim of this paper is to communicate the findings of three overseas study trips (Kuala Lumpur-Malaysia, Daejeon-Korea, Istanbul and Gallipoli-Turkey) that students of Queensland University of Technology are taken to where these study trips trailed the provision of an innovative tertiary education experience of teaching regional planning in an international context. The findings of the pedagogic analyses of the study reveal that the exposure of students to different planning processes and practices give them a new outlook on what they knew from their own country and provide them with useful insights on international planning issues and cultural differences and barriers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

CRE (Corporate Real Estate) decisions should not simply deal with the management of individual facilities, but should especially be concerned with the relationships that a facility has with the corporate business strategy and with the larger real estate markets. Both the practice and the research of CRE management have historically tended to emphasize real estate issues and ignore the corporation’s business issues, causing real estate strategies to be disconnected from the goal and priorities of the corporation’s senior management. With regard to office cycles, a large number of econometric models have been proposed during the last 20 years. However, evidence from historical data and previous research in the field of real estate forecasting seem to agree only on one thing: the existence of interconnected property cycles that are concentrated on vacancy rates (demand). Vacancy also represents the linkage between the inadequacy of existing CRE strategies and the inability of existing econometric models to correctly forecast office rent cycles. Business cycles, across different industry sectors, have decreased from 5-7 years to 1-3 years today, yet corporations are still entering into leases of 5-10 years, causing hidden vacancy levels to rise. Possibly, once CRE strategies are totally in tune with the overall business, hidden vacancy will fade away providing forecasters with better quality data. The aim of this paper is not to investigate whether and when the supply-side will eventually evolve to provide flexible occupancy arrangements to accommodate corporate agility requirements, but rather to propose a general framework for corporations to improve the decision making process of their CRE executives, while emphasizing the importance of understanding the context as a precondition to effective real estate involvements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In asset intensive industries such as mining, oil & gas, utilities etc. most of the capital expenditure happens on acquiring engineering assets. Process of acquiring assets is called as “Procurement” or “Acquisition”. An asset procurement decision should be taken in consideration with the installation, commissioning, operational, maintenance and disposal needs of an asset or spare. However, such cross-functional collaboration and communication does not appear to happen between engineering, maintenance, warehousing and procurement functions in many asset intensive industries. Acquisition planning and execution are two distinct parts of asset acquisition process. Acquisition planning or procurement planning is responsible for determining exactly what is required to be purchased. It is important that an asset acquisition decision is the result of cross-functional decision making process. An acquisition decision leads to a formal purchase order. Most costly asset decisions occur even before they are acquired. Therefore, acquisition decision should be an outcome of an integrated planning & decision making process. Asset intensive organizations both, Government and non Government in Australia spent AUD 102.5 Billion on asset acquisition in year 2008-09. There is widespread evidence of many assets and spare not being used or utilized and in the end are written off. This clearly shows that many organizations end up buying assets or spares which were not required or non-conforming to the needs of user functions. It is due the fact that strategic and software driven procurement process do not consider all the requirements from various functions within the organization which contribute to the operation and maintenance of the asset over its life cycle. There is a lot of research done on how to implement an effective procurement process. There are numerous software solutions available for executing a procurement process. However, not much research is done on how to arrive at a cross functional procurement planning process. It is also important to link procurement planning process to procurement execution process. This research will discuss ““Acquisition Engineering Model” (AEM) framework, which aims at assisting acquisition decision making based on various criteria to satisfy cross-functional organizational requirements. Acquisition Engineering Model (AEM) will consider inputs from corporate asset management strategy, production management, maintenance management, warehousing, finance and HSE. Therefore, it is essential that the multi-criteria driven acquisition planning process is carried out and its output is fed to the asset acquisition (procurement execution) process. An effective procurement decision making framework to perform acquisition planning which considers various functional criteria will be discussed in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design of the Kyoto Protocol renders it incapable of effectively responding to the problem of anthropogenic climate change. Therefore, this article explores the opportunity to construct a new, principled legal approach to respond to climate change that is premised on nationally derived legal responses. To do so, this article considers the theoretical foundation of the international legal response to climate change – Hardin's "The Tragedy of the Commons‟ – and the systemic design faults of the Kyoto Protocol. This article also suggests four principles – a judicious mix of legal instruments, flexibility, intrinsic legal coherence, and quantifiable and achievable targets for the reduction of greenhouse gas intensity – that are necessary to guide the creation of a nationally derived legal response to climate change. This approach is intended to provide the catalyst for new bilateral and multilateral arrangements that can, with the passing of time, generate sufficient momentum to drive the creation of a new and effective cooperative international legal framework to mitigate anthropogenic climate change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Women and Representation in Local Government opens up an opportunity to critique and move beyond suppositions and labels in relation to women in local government. Presenting a wealth of new empirical material, this book brings together international experts to examine and compare the presence of women at this level and features case studies on the US, UK, France, Germany, Spain, Finland, Uganda, China, Australia and New Zealand. Divided into four main sections, each explores a key theme related to the subject of women and representation in local government and engages with contemporary gender theory and the broader literature on women and politics. The contributors explore local government as a gendered environment; critiquing strategies to address the limited number of elected female members in local government and examine the impact of significant recent changes on local government through a gender lens. Addressing key questions of how gender equality can be achieved in this sector, it will be of strong interest to students and academics working in the fields of gender studies, local government and international politics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this project was to implement a just-in-time hints help system into a real time strategy (RTS) computer game that would deliver information to the user at the time that it would be of the most benefit. The goal of this help system is to improve the user’s learning in terms of their rate of learning, retention and avoidance of stagnation. The first stage of this project was implementing a computer game to incorporate four different types of skill that the user must acquire, namely motor, perceptual, declarative knowledge and strategic. Subsequently, the just-in-time hints help system was incorporated into the game to assess the user’s knowledge and deliver hints accordingly. The final stage of the project was to test the effectiveness of this help system by conducting two phases of testing. The goal of this testing was to demonstrate an increase in the user’s assessment of the helpfulness of the system from phase one to phase two. The results of this testing showed that there was no significant difference in the user’s responses in the two phases. However, when the results were analysed with respect to several categories of hints that were identified, it became apparent that patterns in the data were beginning to emerge. The conclusions of the project were that further testing with a larger sample size would be required to provide more reliable results and that factors such as the user’s skill level and different types of goals should be taken into account.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Due to the limitation of current condition monitoring technologies, the estimates of asset health states may contain some uncertainties. A maintenance strategy ignoring this uncertainty of asset health state can cause additional costs or downtime. The partially observable Markov decision process (POMDP) is a commonly used approach to derive optimal maintenance strategies when asset health inspections are imperfect. However, existing applications of the POMDP to maintenance decision-making largely adopt the discrete time and state assumptions. The discrete-time assumption requires the health state transitions and maintenance activities only happen at discrete epochs, which cannot model the failure time accurately and is not cost-effective. The discrete health state assumption, on the other hand, may not be elaborate enough to improve the effectiveness of maintenance. To address these limitations, this paper proposes a continuous state partially observable semi-Markov decision process (POSMDP). An algorithm that combines the Monte Carlo-based density projection method and the policy iteration is developed to solve the POSMDP. Different types of maintenance activities (i.e., inspections, replacement, and imperfect maintenance) are considered in this paper. The next maintenance action and the corresponding waiting durations are optimized jointly to minimize the long-run expected cost per unit time and availability. The result of simulation studies shows that the proposed maintenance optimization approach is more cost-effective than maintenance strategies derived by another two approximate methods, when regular inspection intervals are adopted. The simulation study also shows that the maintenance cost can be further reduced by developing maintenance strategies with state-dependent maintenance intervals using the POSMDP. In addition, during the simulation studies the proposed POSMDP shows the ability to adopt a cost-effective strategy structure when multiple types of maintenance activities are involved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a regional commentary (hereafter ‘the commentary’) on the three Australian projects of the Teasdale-Corti Global Health Research Partnership Program. The three Australian projects are: Victorian Aboriginal Health Service Ltd (VAHS), Melbourne, Victoria—Forty Years of Comprehensive Primary Health Care; Central Australian Aboriginal Congress Inc. (Congress), Alice Springs, Northern Territory—Ingkintja, Male Health Program; and Urapuntja Health Service (UHS), Utopia, Northern Territory—Outstation Health Care. It highlights common themes and lessons in respect to the Revitalising Health for All project in the context of Aboriginal and Torres Strait Islander health in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2008, a three-year pilot ‘pay for performance’ (P4P) program, known as ‘Clinical Practice Improvement Payment’ (CPIP) was introduced into Queensland Health (QHealth). QHealth is a large public health sector provider of acute, community, and public health services in Queensland, Australia. The organisation has recently embarked on a significant reform agenda including a review of existing funding arrangements (Duckett et al., 2008). Partly in response to this reform agenda, a casemix funding model has been implemented to reconnect health care funding with outcomes. CPIP was conceptualised as a performance-based scheme that rewarded quality with financial incentives. This is the first time such a scheme has been implemented into the public health sector in Australia with a focus on rewarding quality, and it is unique in that it has a large state-wide focus and includes 15 Districts. CPIP initially targeted five acute and community clinical areas including Mental Health, Discharge Medication, Emergency Department, Chronic Obstructive Pulmonary Disease, and Stroke. The CPIP scheme was designed around key concepts including the identification of clinical indicators that met the set criteria of: high disease burden, a well defined single diagnostic group or intervention, significant variations in clinical outcomes and/or practices, a good evidence, and clinician control and support (Ward, Daniels, Walker & Duckett, 2007). This evaluative research targeted Phase One of implementation of the CPIP scheme from January 2008 to March 2009. A formative evaluation utilising a mixed methodology and complementarity analysis was undertaken. The research involved three research questions and aimed to determine the knowledge, understanding, and attitudes of clinicians; identify improvements to the design, administration, and monitoring of CPIP; and determine the financial and economic costs of the scheme. Three key studies were undertaken to ascertain responses to the key research questions. Firstly, a survey of clinicians was undertaken to examine levels of knowledge and understanding and their attitudes to the scheme. Secondly, the study sought to apply Statistical Process Control (SPC) to the process indicators to assess if this enhanced the scheme and a third study examined a simple economic cost analysis. The CPIP Survey of clinicians elicited 192 clinician respondents. Over 70% of these respondents were supportive of the continuation of the CPIP scheme. This finding was also supported by the results of a quantitative altitude survey that identified positive attitudes in 6 of the 7 domains-including impact, awareness and understanding and clinical relevance, all being scored positive across the combined respondent group. SPC as a trending tool may play an important role in the early identification of indicator weakness for the CPIP scheme. This evaluative research study supports a previously identified need in the literature for a phased introduction of Pay for Performance (P4P) type programs. It further highlights the value of undertaking a formal risk assessment of clinician, management, and systemic levels of literacy and competency with measurement and monitoring of quality prior to a phased implementation. This phasing can then be guided by a P4P Design Variable Matrix which provides a selection of program design options such as indicator target and payment mechanisms. It became evident that a clear process is required to standardise how clinical indicators evolve over time and direct movement towards more rigorous ‘pay for performance’ targets and the development of an optimal funding model. Use of this matrix will enable the scheme to mature and build the literacy and competency of clinicians and the organisation as implementation progresses. Furthermore, the research identified that CPIP created a spotlight on clinical indicators and incentive payments of over five million from a potential ten million was secured across the five clinical areas in the first 15 months of the scheme. This indicates that quality was rewarded in the new QHealth funding model, and despite issues being identified with the payment mechanism, funding was distributed. The economic model used identified a relative low cost of reporting (under $8,000) as opposed to funds secured of over $300,000 for mental health as an example. Movement to a full cost effectiveness study of CPIP is supported. Overall the introduction of the CPIP scheme into QHealth has been a positive and effective strategy for engaging clinicians in quality and has been the catalyst for the identification and monitoring of valuable clinical process indicators. This research has highlighted that clinicians are supportive of the scheme in general; however, there are some significant risks that include the functioning of the CPIP payment mechanism. Given clinician support for the use of a pay–for-performance methodology in QHealth, the CPIP scheme has the potential to be a powerful addition to a multi-faceted suite of quality improvement initiatives within QHealth.