409 resultados para Construction industry -- Management.
Resumo:
The research described in this paper forms part of an in-depth investigation of safety culture in one of Australia’s largest construction companies. The research builds on a previous qualitative study with organisational safety leaders and further investigates how safety culture is perceived and experienced by organisational members, as well as how this relates to their safety behaviour and related outcomes at work. Participants were 2273 employees of the case study organisation, with 689 from the Construction function and 1584 from the Resources function. The results of several analyses revealed some interesting organisational variance on key measures. Specifically, the Construction function scored significantly higher on all key measures: safety climate, safety motivation, safety compliance, and safety participation. The results are discussed in terms of relevance in an applied research context.
Resumo:
Purpose - Critical scholarship on work-life balance (WLB) and its associated practices maintains that workplace flexibility is more than a quasi-functionalist response to contemporary problems faced by individuals, families or organisations. Beginning with Fleetwood’s contention that WLB discourses have become "detached" from their associated practices, this paper explores how workplace practices support or challenge dominant WLB discourses evident in socio-cultural, political and organisational sources. Design/methodology/approach - We analyse individual and group interview transcripts derived from 122 white-collar employees in two different organisational contexts (one public, one private) in the construction industry in Australia. Findings - Four major themes were identified in the data which illustrate discourse practice gaps. First, the demands facing this particular industry/ sector were framed as heightened and unique. Second, productivity was prioritised, dominating employees’ care-giving and lifestyle concerns. Third, employees’ caring responsibilities were communicated as personal and individual choices. Fourth, commitment and efficiency were judged on the basis of presence in the workplace. Research limitations/implications - Even in industries that have embraced WLB, workplace practices legitimate and reinforce the status quo, and maintain a gap between the promises of WLB and its potential to ameliorate conflict and assist workers to span the boundaries of paid work and other life domains. Originality/value - While the practices demonstrated in the research are focused on one industry, the study provides a critical analysis of how the contextually-influenced meaning of WLB is constructed, created and contested in these workplaces and the effects it produces.
Resumo:
The construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole Life Cycle Costing (WLCC) is a relatively new concept for the construction industry especially on residential development and particularly for Malaysia. Discussing the speculation in using WLCC for the Malaysian residential constructions is the aim for this paper and it is one of the research questions on my research. This paper also wants to gather more speculation that may involve through others experienced. Basically, this paper is written to facilitate the current or future individual which will involve in residential property development sector with a new sensible approach to what at times seems impressively confusing especially in simplifying the operations and maintenance services and rehabilitation as well.
Resumo:
What is the contribution of innovation brokers in leveraging research and development (R&D) investment to enhance industry-wide capabilities? The case of the Australian Cooperative Research Centre for Construction Innovation (CRC CI) is considered in the context of motivating supply chain firms to improve their organizational capabilities in order to acquire, assimilate, transfer and exploit R&D outcomes to their advantage, and to create broader industry and national benefits. A previous audit and analysis has shown an increase in business R&D investment since 2001. The role of the CRC CI in contributing to growth in the absorptive capacity of the Australian construction industry as a whole is illustrated through two programmes: digital modelling building information modelling (BIM) and construction site safety. Numerous positive outcomes in productivity, quality, improved safety and competitiveness were achieved between 2001 and 2009.
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.
Resumo:
In the absence of a benchmarking mechanism specifically designed for local requirements and characteristics, a carbon dioxide footprint assessment and labelling scheme for construction materials is urgently needed to promote carbon dioxide reduction in the construction industry. This paper reports on a recent interview survey of 18 senior industry practitioners in Hong Kong to elicit their knowledge and opinions concerning the potential of such a carbon dioxide labelling scheme. The results of this research indicate the following. A well-designed carbon dioxide label could stimulate demand for low carbon dioxide construction materials. The assessment of carbon dioxide emissions should be extended to different stages of material lifecycles. The benchmarks for low carbon dioxide construction materials should be based on international standards but without sacrificing local integrity. Administration and monitoring of the carbon dioxide labelling scheme could be entrusted to an impartial and independent certification body. The implementation of any carbon dioxide labelling schemes should be on a voluntary basis. Cost, functionality, quality and durability are unlikely to be replaced by environmental considerations in the absence of any compelling incentives or penalties. There are difficulties in developing and operating a suitable scheme, particularly in view of the large data demands involved, reluctance in using low carbon dioxide materials and limited environmental awareness.
Resumo:
An emerging theme for a nation transiting into a sustainable future is the provision of a low carbon (dioxide) environment. Carbon emission reduction is therefore important for the industry and community as a whole. Buildings contribute immensely to total greenhouse gas emissions, so pragmatic actions need to be taken to cut the amount of carbon emitted by the construction industry. These typically involve strategies such as energy-saving features in the design, construction and operation of building projects. However, a variety of characteristics of the markets and stakeholders involved are suppressing their development. This paper reports on a series of interviews with a variety of Hong Kong construction project participants aimed at identifying the drivers of, and obstacles to, the construction industry's attempts to reduce carbon emissions. The results confirm the main actions currently undertaken are energy efficiency enhancement, green procurement, research and development activities, waste/water management and other technical measures such as the provision of thermal insulation. The majority of the drivers are economical in nature, suggesting that financial aids, and particularly government incentives, are likely to be useful motivators. Also suggested is the increased promotion of the benefits of environmental sustainability to the wider community, in order to alert the general public to the need for reducing the amount of carbon originating from building usage.
Resumo:
An evolution in the use of digital modelling has occurred in the Queensland Department of Public Works Division of Project Services over the last 20 years from: the initial implementation of computer aided design and documentation (CADD); to experimentation with building information modelling (BIM); to embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) including the active involvement of consultants and contractors in the design/delivery process. This case study is one of three undertaken through the Australian Sustainable Built Environment National Research Centre investigating past R&D investment. The intent of these cases is to inform the development of policy guidelines for future investment in the construction industry in Australia. This research is informing the activities of CIB Task Group 85 R&D Investment and Impact. The uptake of digital modelling by Project Services has been approached through an incremental learning approach. This has been driven by a strong and clear vision with a focus on developing more efficient delivery mechanisms through the use of new technology coupled with process change. Findings reveal an organisational focus on several areas including: (i) strategic decision making including the empowerment of innovation leaders and champions; (ii) the acquisition and exploitation of knowledge; (iii) product and process development (with a focus on efficiency and productivity); (iv) organisational learning; (v) maximising the use of technology; and (vi) supply chain integration. Key elements of this approach include pilot projects, researcher engagement, industry partnerships and leadership.
Resumo:
Concern that poor image of UK construction industry is restricting recruitment has lead to call for action. This paper gives the results of a recent comparative analysis of the image of both UK and Hungarian industries which indicates the UK image to be relatively good. The perceived cause of Hungarian problems is the poor level of organisation and management.
Resumo:
This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme
Resumo:
Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.
Resumo:
Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.
Resumo:
In the construction industry, contractors have to improve the efficiency of markup decision-making to survive from fierce business competition. The effect of client type on markup decision has been aware in previous studies and contractors are advocated to take account of decision factors properly when they are confronted with different types of projects. Nevertheless, the rationales behind the inclusion of different factors in markup decision-making for different projects sustain unknown. In this study, fifty-three factors were identified after extensive literature review and interviews with professionals. The identified factors were afterwards grouped under the headings of nine attributes and compiled in a questionnaire for survey in China. Using the Hotelling’s T-square test, it is found that three attributes (i.e., project characteristic, client characteristic, and macro condition) can explain the effect of client type on contractors’ markup decision. The research findings provide useful insights into the cognition of bid pricing as well as the improvement of bidding efficiency. While the research works were situated in China, contractors in other countries could benefit from the research findings in a similar vein.
Resumo:
Mobile/tower cranes are the most essential forms of construction plant in use in the construction industry but are also the subject of several safety issues. Of these, blind lifting has been found to be one of the most hazardous of crane operations. To improve the situation, a real-time monitoring system that integrates the use of a Global Positioning System (GPS) and Radio Frequency Identification (RFID) is developed. This system aims to identify unauthorized work or entrance of personnel within a pre-defined risk zone by obtaining positioning data of both site workers and the crane. The system alerts to the presence of unauthorized workers within a risk zone——currently defined as 3m from the crane. When this happens, the system suspends the power of the crane and a warning signal is generated to the safety management team. In this way the system assists the safety management team to manage the safety of hundreds of workers simultaneously. An onsite trial with debriefing interviews is presented to illustrate and validate the system in use.