343 resultados para Construction equipment industry
Resumo:
This research is focused on realizing productivity benefits for the delivery of transport infrastructure in the Australian construction industry through the use of building information modeling (BIM), virtual design and construction (VDC) and integrated project delivery (IPD). Specific objectives include: (I) building an understanding of the institutional environment, business systems and support mechanisms (e.g., training and skilling) which impact on the uptake of BIM/VDC; (II) gathering data to undertake a cross-country analysis of these environments; and (III) providing strategic and practical outcomes to guide the uptake of such processes in Australia. Activities which will inform this research include a review of academic literature and industry documentation, semi-formal interviews in Australia and Sweden, and a cross-country comparative analysis to determine factors affecting uptake and associated productivity improvements. These activities will seek to highlight the gaps between current-practice and best-practice which are impacting on widespread adoption of BIM/VDC and IPD. Early findings will be discussed with intended outcomes of this research being used to: inform a national public procurement strategy; provide guidelines for new contractual frameworks; and contribute to closing skill gaps. Keywords: building information modeling (BIM); virtual design and construction (VDC); integrated project delivery (IPD); transport infrastructure; Australia; procurement
Resumo:
The housing construction industry in Saudi Arabia has been booming rapidly in the past two decades. This boom has faced multiple downfalls in relation to government regulations and building codes, one of which is the application of sustainable methods to the housing construction. This paper sheds some light on the current role of the Saudi government and the role of the Saudi Building Code (SBC) in the housing construction industry. The methodology utilised in this paper was a Delphi survey that was distributed to twenty-five key stakeholders in the housing construction industry in Saudi Arabia. The results indicate that there is a lack of integration between the Saudi Building Code and the current construction methods used in the current construction industry. Some factors and elements are recommended to be incorporated into the Saudi Building Code and to be adopted as regulations in the Saudi housing construction industry.
Resumo:
A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.
Resumo:
An International Society of Sugar Cane Technologists (ISSCT) Engineering Workshop was held in Piracicaba, Brazil from 30 June to 4 July 2008. The theme of the workshop was Design, manufacturing and maintenance of sugar mill equipment. The workshop consisted of a series of technical sessions and site visits. The Brazilian sugar industry is growing rapidly. The growth has occurred as the result of the sugar industry’s position as a key provider of renewable energy in the form of ethanol and, more recently, electricity. The increased focus on electricity is seeing investment in high pressure (100 bar) boilers, cane cleaning plants that allow an increased biomass supply from trash and digesters that produce biogas from dunder. It is clear that the Brazilian sugar industry has a well defined place in the country’s future. The ISSCT workshop provided a good opportunity to gain information from equipment suppliers and discuss new technology that may have application in Australia. The new technologies of interest included IMCO sintered carbide shredder hammer tips, Fives Cail MillMax mills, planetary mill gearboxes, Bosch Projects chainless diffusers, Fives Cail Zuka centrifugals and Vaperma Siftek membrane systems.
Resumo:
The ISSCT Engineering Workshop 2008 in Brazil was well attended with 62 participants including 39 overseas visitors from 15 countries. The workshop addressed the theme Design, manufacturing and maintenance of sugar mill equipment. From the technical sessions, the following conclusions were drawn: • Several speakers articulated a shared vision of the future of the Brazilian sugar industry. This shared vision gives considerable confidence that the vision can become a reality. • There is an increased focus on energy products. As a result, the reduction of factory energy consumption in order to maximise the energy available for products is also a focus. • New equipment and products are being developed with reduced power consumption, lower capital and maintenance costs, and better performance. • Methods presented for reducing maintenance costs included the use of a maintenance management system, condition monitoring and material selection. The workshop was held in conjunction with Piracicaba’s annual SIMTEC exhibition for the sugar and alcohol industries that provides a forum for technical presentations and discussion, and showcases products and services from manufacturers and service providers. In return for holding the workshop in conjunction with SIMTEC, SIMTEC provided sponsorship for the workshop, including paying travel and accommodation costs for two invited speakers, and organisation for the workshop. The ISSCT and SIMTEC technical programs were arranged so that their technical sessions did not clash, and the ISSCT program was extended a day to provide an opportunity for ISSCT participants to attend the SIMTEC exhibition. Informal feedback from workshop participants suggested that the arrangement between ISSCT and SIMTEC worked well. Site visits to two manufacturing facilities and two sugar mills were arranged as part of the workshop.
Resumo:
This research seeks a better and more detailed understanding of the processes of implementing design-led innovation in the mining equipment technology services (METS) sector, in a context where the traditional approach to manufacturing is being challenged. This longitudinal research specifically investigated the barriers to design-led innovation and opportunities that developed throughout this research, to understand how the organisation and culture of a METS company evolved, in order to progress towards design-led change. The significance of these findings is shown in the combined implementation of design imperatives leading towards design-led change at all business levels of an organisational structure.
Resumo:
Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.
Resumo:
Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.
Resumo:
Purpose To examine the implementation of quality management systems (QMSs) of Grade 7 (G-7) Indonesian construction companies. This includes the initial motives that have driven the development of QMSs, barriers to effective QMS implementation, the current practice and integration of QMS-ISO 9001 principles and elements, and the performance of contractors implementing such QMSs. Design/methodology/approach A survey was conducted involving 403 respondents (Quality Management Representatives, Managers, and Project and Site Engineers) from 77 G-7 as well as ISO 9001 certified Indonesian construction companies. Findings The main motive for G-7 contractors in establishing and implementing ISO 9001 based QMSs are identified as being to effectively and efficiently control project activities. Respondents apparently do not often experience problems related to QMS implementation. However, issues of management attitude and purpose are identified as barriers that may affect effective QMS implementation. The study highlights the ISO 9001 principles and elements that still require to be more critically applied by G-7 contractors in order to fully implement and improve their current QMS effectiveness. The findings also suggest that, although certified, many G-7 contractors have not yet achieved a satisfactory level of performance to be truly competitive in global markets outside Indonesia. Originality/value To date, only limited research has been conducted into the application of ISO 9001 in the Indonesian construction industry. The research findings reinforced the value of pursuing more effective QMS implementation. They also support current attempts to introduce ISO 9001 QMSs to a much wider base of Indonesian construction companies, particularly small and medium sized contractors and builders.
Resumo:
The current state of the prefabricated housing market in Australia is systematically profiled, guided by a theoretical systems model. Particular focus is given to two original data collections. The first identifies manufacturers and builders using prefabrication innovations, and the second compares the context for prefabricated housing in Australia with that of key international jurisdictions. The results indicate a small but growing market for prefabricated housing in Australia, often building upon expertise developed through non-residential building applications. The international comparison highlighted the complexity of the interactions between macro policy decisions and historical influences and the uptake of prefabricated housing. The data suggest factors such as the small scale of the Australian market, and a lack of investment in research, development and training have not encouraged prefabrication. A lack of clear regulatory policy surrounding prefabricated housing is common both in Australia and internationally, with local effects in regards to home warranties and housing finance highlighted. Future research should target the continuing lack of consideration of prefabrication from within the housing construction industry, and build upon the research reported in this paper to further quantify the potential end user market and the continuing development of the industry.
Resumo:
In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.
Resumo:
The construction industry is a crucial component of the Hong Kong economy, and the safety and efficiency of workers are two of its main concerns. The current approach to training workers relies primarily on instilling practice and experience in conventional teacher-apprentice settings on and off site. Both have their limitations however, on-site training is very inefficient and interferes with progress on site, while off-site training provides little opportunity to develop the practical skills and awareness needed through hands-on experience. A more effective way is to train workers in safety awareness and efficient working by current novel information technologies. This paper describes a new and innovative prototype system – the Proactive Construction Management System (PCMS) – to train precast installation workers to be highly productive while being fully aware of the hazards involved. PCMS uses Chirp-Spread-Spectrum-based (CSS) real-time location technology and Unity3D-based data visualisation technology to track construction resources (people, equipment, materials, etc.) and provide real-time feedback and post-event visualisation analysis in a training environment. A trial of a precast facade installation on a real site demonstrates the benefits gained by PCMS in comparison with equivalent training using conventional methods. It is concluded that, although the study is based on specific industrial conditions found in Hong Kong construction projects, PCMS may well attract wider interest and use in future.
Resumo:
Rapid urbanization in developing countries such as China has been creating unprecedented opportunities for the adoption of sustainable construction (SC). Owner, as a key driver of urbanization, plays an influential role for other stakeholders to undertake SC practices. However, lacking their demands and requirements of owners were regarded as the main barriers for the adoption of SC. Notwithstanding the diversity of previous studies on the barriers to SC, there is a dearth of research from the owner’s perspective. This paper presents an empirical study identifying the critical factors impeding the adoption of SC from the owners’ point of view. A list of 25 factors was preliminarily identified through extensive literature review and interviews with industry professionals. This was followed by a questionnaire survey to collect owners’ opinions on the relative importance of these factors. Using factor analysis, seven most critical factors are identified, namely, economic feasibility, awareness, support from project stakeholders, legislation and regulation, operability of SC, resource risk, and project management model. The research findings show that economic feasibility, awareness, legislation and regulation are the most important factors impeding owners in adopting SC practices. This implied that the government plays a vital role in removing the barriers impeding the greater adoption of SC by building owners in China. This is helpful for a transition to the low carbon urbanization.