493 resultados para disaster-planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main aim of this paper is to describe an adaptive re-planning algorithm based on a RRT and Game Theory to produce an efficient collision free obstacle adaptive Mission Path Planner for Search and Rescue (SAR) missions. This will provide UAV autopilots and flight computers with the capability to autonomously avoid static obstacles and No Fly Zones (NFZs) through dynamic adaptive path replanning. The methods and algorithms produce optimal collision free paths and can be integrated on a decision aid tool and UAV autopilots.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unlike most normal construction projects, post-disaster housing projects are diverse in nature, have unique socio-cultural and economical requirements, and are extremely dynamic and thus necessitate a meaningful and dynamic response. Post-disaster reconstruction practices that lack a strategy compatible with the severity of disaster, community culture, socio-economic requirements, environmental condition, government legislations, and technical and technological situations, often fail to operate and respond effectively to the needs of the wider affected population. Factors that frequently pose real threats to the eventual success of reconstruction projects are rarely given appropriate consideration when designing such projects. Research into past reconstruction practices has shown that ignoring these factors altogether or failing to give them meaningful consideration can affect housing reconstruction projects. In other words, they either miss their targets altogether or undergo serious modifications after their occupancy, subsequently resulting in an overall loss of project resources. This article touches upon the common factors that negatively impact the outcome of such projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Debate about the relationships between business planning and performance has been active for decades (Bhidé, 2000; Mintzberg, 1994). While results have been inconclusive, this topic still strongly divides the research community (Brinckmann et al., 2010; Chwolka & Raith, 2011; Delmar & Shane, 2004; Frese, 2009; Gruber, 2007; Honig & Karlsson, 2004). Previous research explored the relationships between innovation and the venture creation process (Amason et al., 2006, Dewar & Dutton, 1986; Jennings et al., 2009). However, the relationships between business planning and innovation have mostly been invoked indirectly in the strategy and entrepreneurship literatures through the notion of uncertainty surrounding the development of innovation. Some posited that planning may be irrelevant due to the iterative process, the numerous changes innovation development entails and the need to be flexible (Brews & Hunt, 1999). Others suggested that planning may facilitate the achievement of goals and overcoming of obstacles (Locke and Latham, 2000), guide the venture in its allocation of resources (Delmar and Shane, 2003) and help to foster the communication about the innovation being developed (Liao & Welsh, 2008). However, the nature and extents of the relationships between business planning, innovation and performance are still largely unknown. Moreover, if the reasons why ventures should engage (Frese, 2009) –or not- (Honig, 2004) in business planning have been investigated quite extensively (Brinckmann et al., 2010), the specific value of business planning for nascent firms developing innovation is still unclear. The objective of this paper is to shed some light on these important aspects by investigating the two following questions on a large sample of random nascent firms: 1) how is business planning use over time by new ventures developing different types and degrees of innovation? 2) how do business planning and innovation impact the performance of the nascent firms? Methods & Key propositions This PSED-type study draws its data from the first three waves of the CAUSEE project where 30,105 Australian households were randomly contacted by phone using a methodology to capture emerging firms (Davidsson, Steffens, Gordon, Reynolds, 2008). This screening led to the identification of 594 nascent ventures (i.e., firms that were not operating yet at the time of the identification) that were willing to participate in the study. Comprehensive phone interviews were conducted with these 594 ventures. Likewise, two comprehensive follow-ups were organised 12 months and 24 months later where 80% of the eligible cases of the previous wave completed the interview. The questionnaire contains specific sections investigating business plans such as: presence or absence, degree of formality and updates of the plan. Four types of innovation are measured along three degrees of intensity to produce a comprehensive continuous measure ranging from 0 to 12 (Dahlqvist & Wiklund, 2011). Other sections informing on the gestation activities, industry and different types of experiences will be used as controls to measure the relationships and the impacts of business planning and innovation on the performance of nascent firms overtime. Results from two rounds of pre-testing informed the design of the instrument included in the main survey. The three waves of data are used to first test and compare the use of planning amongst nascent firms by their degrees of innovation and then to examine their impact on performance overtime through regression analyses. Results and Implications Three waves of data collection have been completed. Preliminary results show that on average, innovative firms are more likely to have a business plans than their low innovative counterpart. They are also most likely to update their plan suggesting a more continuous use of the plan over time than previously thought. Further analyses regarding the relationships between business planning, innovation and performance are undergoing. This paper is expected to contribute to the literature on business planning and innovation by measuring quantitatively their impact on nascent firms activities and performance at different stages of their development. In addition, this study will shed a new light on the business planning-performance relationship by disentangling plans, types of nascent firms regarding their innovation degres and their performance over time. Finally, we expect to increase the understanding of the venture creation process by analysing those questions on nascent firms from a large longitudinal sample of randomly selected ventures. We acknowledge the results from this study will be preliminary and will have to be interpreted with caution as the business planning-performance is not a straightforward relationship (Brinckmann et al., 2010). Meanwhile, we believe that this study is important to the field of entrepreneurship as it provides some much needed insights on the processes used by nascent firms during their creation and early operating stages.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fluid Infrastructure: Landscape Architecture Exhibition: This exhibition showcases the work of 4th Year undergraduate landscape architecture students in response to the 2011 Queensland floods through five installations: Systima Fluid Flux Flex Fluid Connectivity The Floods Verge Fluid Evolution The focus of these installations is the post-flood conditions of Brisbane’s riverside public infrastructure, within a scenario of flood as a normalised event. It recognises that within this scenario, parts of this city cannot be described as definitively ‘land’ or ‘water,’ but are best described as ‘fluid terrains’(Mathur, A. and Da Cunha, D. 2006). The landscape design propositions within the five installations include public transport diversification (RiverRats) schemes, greenspace elevations, ephemeral gardens and evolving landscapes, creative interpretation and warning devices and systems. These propositions do not resist fluid conditions, but work with them to propose a more resilient urban river landscape than Brisbane currently has. This QUT exhibition was developed as part of the 2011 Flood of Ideas Project (http://www.floodofideas.org.au) in partnership with Healthy Waterways (Water by Design), State Library of Queensland (The Edge), Brisbane City Council, Australian Institute of Architects, University of Queensland, Green Cross Australia, Stormwater Industry Association.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australian airports have emerged as important urban activity centres over the past decade as a result of privatisation. A range of reciprocal airport and regional impacts now pose considerable challenges for both airport operation and the surrounding urban and regional environment. The airport can no longer be managed solely as a specialised transport entity in isolation from the metropolis that it serves. In 2007 a multidisciplinary Australian Research Council Linkage Project (LP 0775225) was funded to investigate the changing role of airports in Australia. This thesis is but one component of this collaborative research effort. Here the issues surrounding the policy and practice of airport and regional land use planning are explored, analysed and detailed. This research, for the first time, assembles a distinct progression of the wider social, economic, technological and environmental roles of the airport within the Australian airport literature from 1914 – 2011. It recognises that while the list of airport and regional impacts has grown through time, treatment within practice and the literature has largely remained highly specialised and contained within disciplinary paradigms. The first publication of the thesis (Chapter 2) acknowledges that the changing role of airports demands the establishment of new models of airport planning and development. It argues that practice and research requires a better understanding of the reciprocal impacts of airports and their urban catchments. The second publication (Chapter 3) highlights that there is ad hoc examination and media attention of high profile airport and regional conflict, but little empirical analysis or understanding of the extent to which all privatised Australian airports are intending to develop. The conceptual and methodological significance of this research is the development of a national land use classification system for on-airport development. This paper establishes the extent of on-airport development in Australia, providing insight into the changing land use and economic roles of privatised airports. The third publication (Chapter 4) details new and significant interdependencies for airport and regional development in consideration of the progression of airports as activity centres. Here the model of an ‘airport metropolis’ is offered as an organising device and theoretical contribution for comprehending the complexity and planning of airport and regional development. It delivers a conceptual framework for both research and policy, which acknowledges the reciprocal impacts of economic development, land use, infrastructure and governance ‘interfaces’. In a timely and significant concurrence with this research the Australian Government announced and delivered a National Aviation Policy Review (2008 – 2009). As such the fourth publication (Chapter 5) focuses on the airport and urban planning aspects of the review. This paper also highlights the overall policy intention of facilitating broader airport and regional collaborative processes. This communicative turn in airport policy is significant in light of the communicative theoretical framework of the thesis. The fifth paper of the thesis (Chapter 6) examines three Australian case studies (Brisbane, Adelaide and Canberra) to detail the context of airport and regional land use planning and to apply the airport metropolis model as a framework for research. Through the use of Land Use Forums, over 120 airport and regional stakeholders are brought together to detail their perspectives and interactions with airport and regional land use planning. An inductive thematic analysis of the results identifies three significant themes which contribute to the fragmentation of airport and regional and land use planning: 1) inadequate coordination and disjointed decision-making; 2) current legislative and policy frameworks; and 3) competing stakeholder priorities and interests. Building on this new knowledge, Chapter 7 details the perceptions of airport and local, state and territory government stakeholders to land use relationships, processes and outcomes. A series of semi-structured interviews are undertaken in each of the case studies to inform this research. The potential implications for ongoing communicative practice are discussed in conclusion. The following thesis represents an incremental and cumulative research process which delivers new knowledge for the practical understanding and research interpretation of airport and regional land use planning practice and policy. It has developed and applied a robust conceptual framework which delivers significant direction for all stakeholders to better comprehend the relevance of airports in the urban character and design of our cities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most of the national Health Information Systems (HIS) in resource limited developing countries do not serve the purpose of management support and thus the service is adversely affected. While emphasising the importance of timely and accurate health information in decision making in healthcare planning, this paper explains that Health Management Information System Failure is commonly seen in developing countries as well as the developed countries. It is suggested that the possibility of applying principles of Health Informatics and the technology of Decision Support Systems should be seriously considered to improve the situation. A brief scientific explanation of the evolution of these two disciplines is included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Land use planning within and surrounding privatised Australian capital city airports is a fragmented process as a result of: current legislative and policy frameworks; competing stakeholder priorities and interests; and inadequate coordination and disjointed decision-making. Three Australian case studies are examined to detail the context of airport and regional land use planning. Stakeholder Land Use Forums within each case study have served to inform the procedural dynamics and relationships between airport and regional land use decision-making. This article identifies significant themes and stakeholder perspectives regarding on-airport development and broader urban land use policy and planning. First, it outlines the concept of the “airport city” and examines the model of airport and regional “interfaces.” Then, it details the policy context that differentiates on-airport land use planning from planning within the surrounding region. The article then analyses the results of the Land Use Forums identifying key themes within the shared and reciprocal interfaces of governance, environment, economic development and infrastructure. The article concludes by detailing the implications of this research to broader urban planning and highlights the core issues contributing to the fragmentation of airport and regional land use planning policy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to identify goal conflicts – both actual and potential – between climate and social policies in government strategies in response to the growing significance of climate change as a socioecological issue (IPCC 2007). Both social and climate policies are political responses to long-term societal trends related to capitalist development, industrialisation, and urbanisation (Koch, 2012). Both modify these processes through regulation, fiscal transfers and other measures, thereby affecting conditions for the other. This means that there are fields of tensions and synergies between social policy and climate change policy. Exploring these tensions and synergies is an increasingly important task for navigating genuinely sustainable development. Gough et al (2008) highlight three potential synergies between social and climate change policies: First, income redistribution – a traditional concern of social policy – can facilitate use of and enhance efficiency of carbon pricing. A second area of synergy is housing, transport, urban policies and community development, which all have potential to crucially contribute towards reducing carbon emissions. Finally, climate change mitigation will require substantial and rapid shifts in producer and consumer behaviour. Land use planning policy is a critical bridge between climate change and social policy that provides a means to explore the tensions and synergies that are evolving within this context. This paper will focus on spatial planning as an opportunity to develop strategies to adapt to climate change, and reviews the challenges of such change. Land use and spatial planning involve the allocation of land and the design and control of spatial patterns. Spatial planning is identified as being one of the most effective means of adapting settlements in response to climate change (Hurlimann and March, 2012). It provides the instrumental framework for adaptation (Meyer, et al., 2010) and operates as both a mechanism to achieve adaptation and a forum to negotiate priorities surrounding adaptation (Davoudi, et al., 2009). The acknowledged role of spatial planning in adaptation however has not translated into comparably significant consideration in planning literature (Davoudi, et al., 2009; Hurlimann and March, 2012). The discourse on adaptation specifically through spatial planning is described as ‘missing’ and ‘subordinate’ in national adaptation plans (Greiving and Fleischhauer, 2012),‘underrepresented’ (Roggema, et al., 2012)and ‘limited and disparate’ in planning literature (Davoudi, et al., 2009). Hurlimann and March (2012) suggest this may be due to limited experiences of adaptation in developed nations while Roggema et al. (2012) and Crane and Landis (2010) suggest it is because climate change is a wicked problem involving an unfamiliar problem, various frames of understanding and uncertain solutions. The potential for goal conflicts within this policy forum seem to outweigh the synergies. Yet, spatial planning will be a critical policy tool in the future to both protect and adapt communities to climate change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an organisational learning system implemented across a three year period within a multi campus tertiary library. It proposes a three stage system, framed within a reflective evidence based practice process to foster professional engagement and lifelong learning of staff.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides data for the case study presented in our recent earthwork planning papers. Some results are also provided in a graphical format using Excel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Oceania region is an area particularly prone to natural disasters such as cyclones, tsunamis, floods, droughts, earthquakes and volcanic eruptions. Many of the nations in the region are Small Island Developing States (SIDS), yet even within wealthy states such as Australia and New Zealand there are groups which are vulnerable to disaster. Vulnerability to natural disaster can be understood in human rights terms, as natural disasters threaten the enjoyment of a number of rights which are guaranteed under international law, including rights to health, housing, food, water and even the right to life itself. The impacts of climate change threaten to exacerbate these vulnerabilities, yet, despite the foreseeability of further natural disasters as a result of climate change, there currently exists no comprehensive international framework for disaster response offering practical and/or legally reliable mechanisms to assist at‐risk states and communities. This paper sets out to explore the human rights issues presented by natural disasters and examine the extent to which these issues can be addressed by disaster response frameworks at the international, regional and national levels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As highlighted by previous work in Normal Accident Theory1 and High Reliability Organisations, 2 the ability of a system to be flexible is of critical importance to its capability to prepare for, respond to, and recover from disturbance and disasters. This paper proposes that the research into ‘edge organisations’3 and ‘agility’4 is a potential means to operationalise components that embed high reliable traits in the management and oversight of critical infrastructure systems. Much prior work has focused on these concepts in a military frame whereas the study reported on here examines the application of these concepts to aviation infrastructure, specifically, a commercial international airport. As a commercial entity functions in a distinct manner from a military organisation this study aims to better understand the complementary and contradictory components of the application of agility work to a commercial context. Findings highlight the challenges of making commercial operators of infrastructure systems agile as well as embedding traits of High Reliability in such complex infrastructure settings.