515 resultados para Construction management
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector infrastructure market, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) by multinational contractors. This study aims to update progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major road and bridges. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors into Australia. Elsewhere, the authors have developed Dunning’s principal hypothesis to suit the context of this research and to address a weakness arising in this hypothesis that is based on a nominal (yes or no) approach to the ownership, location and internalisation factors in Dunning's eclectic framework and which fails to speak to the relative explanatory power of these factors. The authors have completed a first stage test of this development of Dunning's hypothesis based on publically available secondary data, in which it was concluded tentatively that the location factor appears to have the greatest explanatory power. This paper aims to present, for the first time, a further and novel development of the operation of Dunning's eclectic paradigm within the context of multinational contracting, as well as a preview of the design and planned analysis of the next empirical stage in this research concerning case studies. Finally, and beyond the theoretical contributions expected, other expected contributions are mentioned concerning research method and practical implications.
Resumo:
Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.
Resumo:
The exploratory research presented in this discussion paper was undertaken as input to a major research grant application for the Australian Research Council. The research looks at the contribution of the Australian built environment to meet social and environmental needs. The paper examines the following research questions: What are the main challenges facing the Australian built environment? What types of building innovations might address those challenges? The research questions were addressed through desk-top research, involving an international review of (1) relevant academic literature in top-tier construction management and general management journals, and (2) high profile industry reports published internationally. Future research will involve assessing the diffusion of the identified building innovations and gauging their impact on social and environmental goals.
Resumo:
Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.
Resumo:
A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs
Resumo:
Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context.
Resumo:
A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
Resumo:
Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.
Resumo:
This paper analyses the profits from 221 construction projects undertaken by an Australian building firm in the period 1910–1938 and examines the factors that influence the firm's profit levels. This involves a series of multiple regression analyses with three dependent variables representing profit and 26 independent variables representing economic conditions and project characteristics. From these, 11 models are derived of which two are chosen as having the best explanatory power in explaining approximately 72% of the variability in profit levels movements. The results show that unemployment, interest rates, level of construction activity in the state, change of wage level, inflation rate of building material and project value significantly influenced the firm's profit level during the period.
Resumo:
A multivariate approach to bidding strategy is presented in comparison with previous standard approaches. An optimal formulation is derived and a method of parameter estimation proposed. A case study illustrates the derivation of optimal and other strategic mark up values against a single bidder. Concluding remarks concern extensions to multiple competitors differing levels of information, and sensitivity analysis.
Resumo:
While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.
Resumo:
Two approaches are described, which aid the selection of the most appropriate procurement arrangements for a building project. The first is a multi-attribute technique based on the National Economic Development Office procurement path decision chart. A small study is described in which the utility factors involved were weighted by averaging the scores of five 'experts' for three hypothetical building projects. A concordance analysis is used to provide some evidence of any abnormal data sources. When applied to the study data, one of the experts was seen to be atypical. The second approach is by means of discriminant analysis. This was found to provide reasonably consistent predictions through three discriminant functions. The analysis also showed the quality criteria to have no significant impact on the decision process. Both approaches provided identical and intuitively correct answers in the study described. Some concluding remarks are made on the potential of discriminant analysis for future research and development in procurement selection techniques.
Resumo:
Mobile/tower cranes are the most essential forms of construction plant in use in the construction industry but are also the subject of several safety issues. Of these, blind lifting has been found to be one of the most hazardous of crane operations. To improve the situation, a real-time monitoring system that integrates the use of a Global Positioning System (GPS) and Radio Frequency Identification (RFID) is developed. This system aims to identify unauthorized work or entrance of personnel within a pre-defined risk zone by obtaining positioning data of both site workers and the crane. The system alerts to the presence of unauthorized workers within a risk zone——currently defined as 3m from the crane. When this happens, the system suspends the power of the crane and a warning signal is generated to the safety management team. In this way the system assists the safety management team to manage the safety of hundreds of workers simultaneously. An onsite trial with debriefing interviews is presented to illustrate and validate the system in use.