341 resultados para town centre development
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.
Resumo:
Work environments have previously been studied to identify the strategies, structures and processes which increase the likelihood of creativity, innovation and collaboration for productive workplaces. A number of perspectives have emerged which identify social and cognitive factors known to contribute to or to restrict innovation and collaboration. Recently more attention has been given to designing physical environments to encourage processes relevant to innovation such as creativity (McCoy & Evans, 2002) knowledge sharing (Hemlin, Allwood & Martin, 2008) and collaboration (Bozeman & Corley, 2004). Some attention has been given specifically to research and development environments (Boutellier et al, 2008) but little integration of this research has occurred. In the context of the construction of new purpose-built premises which will bring together under one roof separate public sector agencies engaged in research and development in agriculture, natural resource systems and the environment, this paper examines the extant literature and develops initial propositions for research relevant to the transition, collaboration and performance of research and development in new organizational environments where traditional boundaries have been redrawn.
Resumo:
New product development projects are experiencing increasing internal and external project complexity. Complexity leadership theory proposes that external complexity requires adaptive and enabling leadership, which facilitates opportunity recognition (OR). We ask whether internal complexity also requires OR for increased adaptability. We extend a model of EO and OR to conclude that internal complexity may require more careful OR. This means that leaders of technically or structurally complex projects need to evaluate opportunities more carefully than those in projects with external or technological complexity.
Resumo:
The Australian construction industry is moving towards the implementation of a voluntary code of practice (VCP) for occupational health and safety (OHS). The evidence suggests that highly-visible clients and project management firms, in addition to their subcontractors, will embrace such a code, while smaller firms not operating in high-profile contracting regimes may prove reticent. This paper incorporates qualitative data from a research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the proposed VCP by smaller firms, together with pathways to adoption.
Resumo:
In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.
Resumo:
In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.
Resumo:
Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
As regulators, governments are often criticised for over‐regulating industries. This research project seeks to examine the regulation affecting the construction industry in a federal system of government. It uses a case study of the Australian system of government to focus on the question of the implications of regulation in the construction industry. Having established the extent of the regulatory environment, the research project considers the costs associated with this environment. Consequently, ways in which the regulatory burden on industry can be reduced are evaluated. The Construction Industry Business Environment project is working with industry and government agencies to improve regulatory harmonisation in Australia, and thereby reduce the regulatory burden on industry. It is found that while taxation and compliance costs are not likely to be reduced in the short term, costs arising from having to adapt to variation between regulatory regimes in a federal system of government, seem the most promising way of reducing regulatory costs. Identifying and reducing adaptive costs across jurisdictional are argued to present a novel approach to regulatory reform.
Resumo:
The Cooperative Research Centre for Construction Innovation1 (hereafter called Construction Innovation) supports the notion of the establishment of a Sustainability Charter for Australia and is interested in working collaboratively to achieve this outcome. A number of challenges need to be addressed to develop this Charter. This submission outlines these challenges and possible responses to them by a Sustainability Commission.
Resumo:
As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.
Resumo:
This paper provides an overview of the current QUT Spatial Science undergraduate program based in Brisbane, Queensland, Australia. It discusses the development and implementation of a broad-based educational model for the faculty of built environment and engineering courses and specifically to the course structure of the new Bachelor of Urban Development (Spatial Science) study major. A brief historical background of surveying courses is discussed prior to the detailing of the three distinct and complementary learning themes of the new course structure with a graphical course matrix. Curriculum mapping of the spatial science major has been undertaken as the course approaches formal review in late 2010. Work-integrated learning opportunities have been embedded into the curriculum and a brief outline is presented. Some issues relevant to the tertiary surveying/ spatial sector are highlighted in the context of changing higher education environments in Australia.