254 resultados para startup, software, project management, PMIS, Agile, Software project management, funzionalià


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper gives an overview of an ongoing project endeavouring to advance theory-based production and project management, and the rationale for this approach is briefly justified. The status of the theoretical foundation of production management, project management and allied disciplines is discussed, with emphasis on metaphysical grounding of theories, as well as the nature of the heuristic solution method commonly used in these disciplines. Then, on-going work related to different aspects of production and project management is reviewed from both theoretical and practical orientation. Next, information systems agile project management is explored with a view to its re-use in generic project management. In production management, the consequences and implementation of a new, wider theoretical basis are analyzed. The theoretical implications and negative symptoms of the peculiarities of the construction industry for supply chains and supply chain management in construction are observed. Theoretical paths for improvements of inter-organisational relationships in construction which are fundamental for improvement of construction supply chains are described. To conclude, the observations made in this paper vis-à-vis production, project and supply chain management are related again to the theoretical basis of this paper, and finally directions for theory development and future research are given and discussed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – This paper seeks to analyse the process of packaged software selection in a small organization, focussing particularly on the role of IT consultants as intermediaries in the process. Design/methodology/approach – This is based upon a longitudinal, qualitative field study concerning the adoption of a customer relationship management package in an SME management consultancy. Findings – The authors illustrate how the process of “salesmanship”, an activity directed by the vendor/consultant and focussed on the interests of senior management, marginalises user needs and ultimately secures the procurement of the software package. Research limitations/implications – Despite the best intentions the authors lose something of the rich detail of the lived experience of technology in presenting the case study as a linear narrative. Specifically, the authors have been unable to do justice to the complexity of the multifarious ways in which individual perceptions of the project were influenced and shaped by the opinions of others. Practical implications – Practitioners, particularly those from within SMEs, should be made aware of the ways in which external parties may have a vested interest in steering projects in a particular direction, which may not necessarily align with their own interests. Originality/value – This study highlights in detail the role of consultants and vendors in software selection processes, an area which has received minimal attention to date. Prior work in this area emphasises the necessary conditions for, and positive outcomes of, appointing external parties in an SME context, with only limited attention being paid to the potential problems such engagements may bring.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Information sharing in distance collaboration: A software engineering perspective, QueenslandFactors in software engineering workgroups such as geographical dispersion and background discipline can be conceptually characterized as "distances", and they are obstructive to team collaboration and information sharing. This thesis focuses on information sharing across multidimensional distances and develops an information sharing distance model, with six core dimensions: geography, time zone, organization, multi-discipline, heterogeneous roles, and varying project tenure. The research suggests that the effectiveness of workgroups may be improved through mindful conducts of information sharing, especially proactive consideration of, and explicit adjustment for, the distances of the recipient when sharing information.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The PMBOK Guide is one of the most influential publications concerning the knowledge of the project manangement. Moreover, the pervasion of this guide seems to be set to increase as the basis of accreditation - in conjunction with the increasing global trend toward obtaining project management professional status. However, despite the influence and strengthening profile of this guide, reports continue to be published that detail numerous project failures in a wide range of different industries. The PMBOK Guide comprises mainly declarative (know-what) and procedural (know-how) information. In this sense, the guide is largely normative and provides a very good example of the limitations of this approach as highlighted by proponents of a move to the genuine application of positibe theory in project management.----- The aim of this paper is to determine the applicability of the guide in Australia and to determine the extent to which project success can be attributed to the guide. Project Managers from a variety of organisations were surveyed. This postal survey yielded 48 replies. Descriptive statistics was used to assess the incidence and effectivieness of all the processes in the guide. The results indicate that there were no processes that could be considered as peripheral or as a candidate for elimination from the guide. More specifically, all the processes were identified as either a key routine process or a key selective process and positively related to the level of project success. However, the results also indicated that other major factors pertaining to causal knowledge (know-why) are, at least, equally important determinants of project success. It is concluded that declarative, procedural and causal knowledge are all valuable, and given the preponderance of the first two types of knowledge, there seems to be an urgent need to now ensure an equal quest for causal knowledge. In terms of developing causal knowledge, a good starting point would appear to be both positive theory from production and economics.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Although the service-oriented paradigm has been well established in the technical domain for quite some time now, service governance is still considered a research gap. To ensure adequate governance, there is a necessity to manage services as first-class assets throughout the lifecycle. Now that the concept of ser-vice-orientation is also increasingly applied on the business level to structure an organisation’s capabili-ties, the problem has become an even bigger chal-lenge. This paper presents a generic business and software service lifecycle and aligns it with the com-mon management layers in organisations. Using ser-vice analysis as an example, it moreover illustrates how activities in the service lifecycle may vary on lower levels of granularity depending on the focus on business or software services.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.