128 resultados para split-operator scheme


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tzeng et al. proposed a new threshold multi-proxy multi-signature scheme with threshold verification. In their scheme, a subset of original signers authenticates a designated proxy group to sign on behalf of the original group. A message m has to be signed by a subset of proxy signers who can represent the proxy group. Then, the proxy signature is sent to the verifier group. A subset of verifiers in the verifier group can also represent the group to authenticate the proxy signature. Subsequently, there are two improved schemes to eliminate the security leak of Tzeng et al.’s scheme. In this paper, we have pointed out the security leakage of the three schemes and further proposed a novel threshold multi-proxy multi-signature scheme with threshold verification.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Alzaid et al. proposed a forward & backward secure key management scheme in wireless sensor networks for Process Control Systems (PCSs) or Supervisory Control and Data Acquisition (SCADA) systems. The scheme, however, is still vulnerable to an attack called the sandwich attack that can be launched when the adversary captures two sensor nodes at times t1 and t2, and then reveals all the group keys used between times t1 and t2. In this paper, a fix to the scheme is proposed in order to limit the vulnerable time duration to an arbitrarily chosen time span while keeping the forward and backward secrecy of the scheme untouched. Then, the performance analysis for our proposal, Alzaid et al.’s scheme, and Nilsson et al.’s scheme is given.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vehicular ad hoc network (VANET) is a wireless ad hoc network that operates in a vehicular environment to provide communication between vehicles. VANET can be used by a diverse range of applications to improve road safety. Cooperative collision warning system (CCWS) is one of the safety applications that can provide situational awareness and warning to drivers by exchanging safety messages between cooperative vehicles. Currently, the routing strategies for safety message dissemination in CCWS are scoped broadcast. However, the broadcast schemes are not efficient as a warning message is sent to a large number of vehicles in the area, rather than only the endangered vehicles. They also cannot prioritize the receivers based on their critical time to avoid collision. This paper presents a more efficient multicast routing scheme that can reduce unnecessary transmissions and also use adaptive transmission range. The multicast scheme involves methods to identify an abnormal vehicle, the vehicles that may be endangered by the abnormal vehicle, and the latest time for each endangered vehicle to receive the warning message in order to avoid the danger. We transform this multicast routing problem into a delay-constrained minimum Steiner tree problem. Therefore, we can use existing algorithms to solve the problem. The advantages of our multicast routing scheme are mainly its potential to support various road traffic scenarios, to optimize the wireless channel utilization, and to prioritize the receivers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Digital Scenography and traditional Stage Design for the US premiere of Split Britches "The Lost Lounge" - Lois Weaver and Peggy Shaw, Dixons Place New York, December 2009 Digital Scenography and traditional Stage Design for the UK premiere of Split Britches "The Lost Lounge" - Lois Weaver and Peggy Shaw, The Great Hall, Peoples Palace, London, March 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Islanded operation, protection, reclosing and arc extinguishing are some of the challenging issues related to the connection of converter interfaced distributed generators (DGs) into a distribution network. The isolation of upstream faults in grid connected mode and fault detection in islanded mode using overcurrent devices are difficult. In the event of an arc fault, all DGs must be disconnected in order to extinguish the arc. Otherwise, they will continue to feed the fault, thus sustaining the arc. However, the system reliability can be increased by maximising the DG connectivity to the system: therefore, the system protection scheme must ensure that only the faulted segment is removed from the feeder. This is true even in the case of a radial feeder as the DG can be connected at various points along the feeder. In this paper, a new relay scheme is proposed which, along with a novel current control strategy for converter interfaced DGs, can isolate permanent and temporary arc faults. The proposed protection and control scheme can even coordinate with reclosers. The results are validated through PSCAD/EMTDC simulation and MATLAB calculations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a novel peak load management scheme for rural areas. The scheme transfers certain customers onto local nonembedded generators during peak load periods to alleviate network under voltage problems. This paper develops and presents this system by way of a case study in Central Queensland, Australia. A methodology is presented for determining the best location for the nonembedded generators as well as the number of generators required to alleviate network problems. A control algorithm to transfer and reconnect customers is developed to ensure that the network voltage profile remains within specification under all plausible load conditions. Finally, simulations are presented to show the performance of the system over a typical maximum daily load profile with large stochastic load variations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A special transmit polarization signalling scheme is presented to alleviate the power reduction as a result of polarization mismatch from random antenna orientations. This is particularly useful for hand held mobile terminals typically equipped with only a single linearly polarized antenna, since the average signal power is desensitized against receiver orientations. Numerical simulations also show adequate robustness against incorrect channel estimations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past eight years, Australia has adopted the use of environmental offsets as a means to compensate for environmental degradation from development. Queensland has more environmental offsetting policies than any other Australian State or Territory. The methodology has profound effects on development companies, landowners (both private and public), regional land planning, organizations, government agencies, monetary banking institutions and environmental conservation bodies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pipe insulation between the collector and storage tank on pumped storage (commonly called split), solar water heaters can be subject to high temperatures, with a maximum equal to the collector stagnation temperature. The frequency of occurrence of these temperatures is dependent on many factors including climate, hot water demand, system size and efficiency. This paper outlines the findings of a computer modelling study to quantify the frequency of occurrence of pipe temperatures of 80 degrees Celsius or greater at the outlet of the collectors for these systems. This study will help insulation suppliers determine the suitability of their materials for this application. The TRNSYS program was used to model the performance of a common size of domestic split solar system, using both flat plate and evacuated tube, selective surface collectors. Each system was modelled at a representative city in each of the 6 climate zones for Australia and New Zealand, according to AS/NZS4234 - Heat Water Systems - Calculation of energy consumption, and the ORER RECs calculation method. TRNSYS was used to predict the frequency of occurrence of the temperatures that the pipe insulation would be exposed to over an average year, for hot water consumption patterns specified in AS/NZS4234, and for worst case conditions in each of the climate zones. The results show; * For selectively surfaced, flat plate collectors in the hottest location (Alice Sprints) with a medium size hot water demand according to AS/NZS2434, the annual frequency of occurrence of temperatures at and above 80 degrees Celsius was 33 hours. The frequency of temperatures at and above 140 degrees Celsius was insignificant. * For evacuated tube collectors in the hottest location (Alice Springs), the annual frequency of temperatures at and above 80 degrees Celsius was 50 hours. Temperatures at and above 140 degrees Celsius were significant and were estimated to occur for more than 21 hours per year in this climate zone. Even in Melbourne, temperatures at and above 80 degrees can occur for 12 hours per year and at and above 140 degrees for 5 hours per year. * The worst case identified was for evacuated tube collectors in Alice Springs, with mostly afternoon loads in January. Under these conditions, the frequency of temperatures at and above 80 degrees Celsius was 10 hours for this month only. Temperatures at and above 140 degrees Celsius were predicted to occur for 5 hours in January.