27 resultados para refurbishment


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Gagner Pty t/as Indochine Café v Canturi Corporation Pty Ltd (2009) 262 ALR 691, the assessment of damages awarded for the rectification work to the premises of the respondent was in issue. The appellant operated a restaurant above the respondent’s jewellery store in Sydney. When the kitchen of the restaurant flooded, water escaped causing damage to the jewellery store’s fit-out. The escape of the water was held to be due to the negligence of persons for whom the appellant was vicariously liable. The trial judge awarded damages, measured by the amount required to return the premises as close as was possible to the condition prior to the flood damage as well as an allowance for interruption to the business for 10 days. The 10 day allowance reflected the number of days the store would have been closed for if it was to be returned to its previous condition. The evidence was that the flooding has only affected approximately 10% of the floor area of the store. However, instead of having work carried out to bring the premises back to its condition as before the water damage, the respondent closed the business for 29 working days for a complete internal refurbishment – at a cost substantially more than simple rectification. On appeal it was argued that the trial judge had assessed the damages incorrectly as by undertaking a complete refurbishment had the effect that the respondent did not suffer any loss as a consequence of the negligence in relation to the fit-out. It was asserted that the claim for damages was in the circumstances a claim for betterment. It was also argued that the damages should not include a component for GST. Campbell JA gave reasons, with Macfarlan JA and Sackville AJA agreeing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many ageing road bridges, particularly timber bridges, require urgent improvement due to the demand imposed by the recent version of the Australian bridge loading code, AS 5100. As traffic volume plays a key role in the decision of budget allocations for bridge refurbishment/ replacement, many bridges in low volume traffic network remain in poor condition with axle load and/ or speed restrictions, thus disadvantaging many rural communities. This thesis examines an economical and environmentally sensible option of incorporating disused flat rail wagons (FRW) in the construction of bridges in low volume, high axle load road network. The constructability, economy and structural adequacy of the FRW road bridge is reported in the thesis with particular focus of a demonstration bridge commissioned in regional Queensland. The demonstration bridge comprises of a reinforced concrete slab (RCS) pavement resting on two FRWs with custom designed connection brackets at regular intervals along the span of the bridge. The FRW-RC bridge deck assembly is supported on elastomeric rubber pads resting on the abutment. As this type of bridge replacement technology is new and its structural design is not covered in the design standards, the in-service structural performance of the FRW bridge subjected to the high axle loadings prescribed in AS 5100 is examined through performance load testing. Both the static and the moving load tests are carried out using a fully laden commonly available three-axle tandem truck. The bridge deck is extensively strain gauged and displacement at several key locations is measured using linear variable displacement transducers (LVDTs). A high speed camera is used in the performance test and the digital image data are analysed using proprietary software to capture the locations of the wheel positions on the bridge span accurately. The wheel location is thus synchronised with the displacement and strain time series to infer the structural response of the FRW bridge. Field test data are used to calibrate a grillage model, developed for further analysis of the FRW bridge to various sets of high axle loads stipulated in the bridge design standard. Bridge behaviour predicted by the grillage model has exemplified that the live load stresses of the FRW bridge is significantly lower than the yield strength of steel and the deflections are well below the serviceability limit state set out in AS 5100. Based on the results reported in this thesis, it is concluded that the disused FRWs are competent to resist high axle loading prescribed in AS 5100 and are a viable alternative structural solution of bridge deck in the context of the low volume road networks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introduction Buildings, which account for approximately half of all annual energy and greenhouse gas emissions, are an important target area for any strategy addressing climate change. Whilst new commercial buildings increasingly address sustainability considerations, incorporating green technology in the refurbishment process of older buildings is technically, financially and socially challenging. This research explores the expectations and experiences of commercial office building tenants, whose building was under-going green refurbishment. Methodology Semi-structured in-depth interviews with seven residents and neighbours of a large case-study building under-going green refurbishment in Melbourne, Australia. Built in 1979, the 7,008m² ‘B’ grade building consists of 11 upper levels of office accommodation, ground floor retail, and a basement area leased as a licensed restaurant. After refurbishment, which included the installation of chilled water pumps, solar water heating, waterless urinals, insulation, disabled toilets, and automatic dimming lights, it was expected that the environmental performance of the building would move from a non-existent zero ABGR (Australian Building Greenhouse Rating) star rating to 3.5 stars, with a 40% reduction in water consumption and 20% reduction in energy consumption. Interviews were transcribed, with responses analysed using a thematic approach, identifying categories, themes and patterns. Results Commercial property tenants are on a journey to sustainability - they are interested and willing to engage in discussions about sustainability initiatives, but the process, costs and benefits need to be clear. Critically, whilst sustainability was an essential and non-negotiable criterion in building selection for government and larger corporate tenants, sustainability was not yet a core business value for smaller organisations – whilst they could see it as an emerging issue, they wanted detailed cost-benefit analyses, pay-back calculations of proposed technologies and, ideally, wished they could trial the technology first-hand in some way. Although extremely interested in learning more, most participants reported relatively minimal knowledge of specific sustainability features, designs or products. In discussions about different sustainable technologies (e.g., waterless urinals, green-rated carpets), participants frequently commented that they knew little about the technology, had not heard of it or were not sure exactly how it worked. Whilst participants viewed sustainable commercial buildings as the future, they had varied expectations about the fate of existing older buildings – most felt that they would have to be retrofitted at some point to meet market expectations and predicted the emergence of a ‘non-sustainability discount’ for residing in a building without sustainable features. Discussion This research offers a beginning point for understanding the difficulty of integrating green technology in older commercial buildings. Tenants currently have limited understandings of technology and potential building performance outcomes, which ultimately could impede the implementation of sustainable initiatives in older buildings. Whilst the commercial property market is interested in learning about sustainability in the built environment, the findings highlight the importance of developing a strong business case, communication and transition plan for implementing sustainability retrofits in existing commercial buildings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project involved the complete refurbishment and extension of a 1980’s two-storey domestic brick building, previously used as a Boarding House (Class 3), into Middle School facilities (Class 9b) on a heritage listed site at Nudgee College secondary school, Brisbane. The building now accommodates 12 technologically advanced classrooms, computer lab and learning support rooms, tuckshop, art room, mini library/reading/stage area, dedicated work areas for science and large projects with access to water on both floors, staff facilities and an undercover play area suitable for assemblies and presentations. The project was based on a Reggio Emilia approach, in which the organisation of the physical environment is referred to as the child’s third teacher, creating opportunities for complex, varied, sustained and changing relationships between people and ideas. Classrooms open to a communal centre piazza and are integrated with the rest of the school and the school with the surrounding community. In order to achieve this linkage of the building with the overall masterplan of the site, a key strategy of the internal planning was to orientate teaching areas around a well defined active circulation space that breaks out of the building form to legibly define the new access points to the building and connect up to the pathway network of the campus. The width of the building allowed for classrooms and a generous corridor that has become ‘breakout’ teaching areas for art, IT, and small group activities. Large sliding glass walls allow teachers to maintain supervision of students across all areas and allow maximum light penetration through small domestic window openings into the deep and low-height spaces. The building was also designed with an effort to uphold cultural characteristics from the Edmund Rice Education Charter (2004). Coherent planning is accompanied by a quality fit-out, creating a vibrant and memorable environment in which to deliver the upper primary curriculum. Consistent with the Reggio Emilia approach, materials, expressive of the school’s colours, are used in a contemporary, adventurous manner to create panels of colour useful for massing and defining the ‘breakout’ teaching areas and paths of travel, and storage elements are detailed and arranged to draw attention to their aesthetic features. Modifications were difficult due to the random placement of load bearing walls, minimum ceiling heights, the general standard of finishes and new fire and energy requirements, however the reuse of this building was assessed to be up to 30% cheaper than an equivalent new building, The fit out integrates information technology and services at a level not usually found in primary school facilities. This has been achieved within the existing building fabric through thoughtful detailing and co-ordination with allied disciplines.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Patient satisfaction with foodservices is multidimensional. It is well recognised that food and other aspects of foodservice delivery are important elements of patients overall perception of the hospital experience. This study aimed to determine whether menu changes in 2008 at an acute private hospital, considered negative by the dietetic staff, would affect patient satisfaction with the foodservice. Changes to the menu, secondary to the refurbishment of the foodservice facilities decreased the number of choices at breakfast from six to four, and altered the dessert menu to include a larger proportion of commercially produced products. The Acute Care Hospital Foodservice Patient Satisfaction Questionnaire (ACHFPSQ) was utilised to assess patient satisfaction with the menu changes, as it has proven accuracy and reliability in measuring patient satisfaction. Results of the survey (n=306) were compared to data with previous ACHFPSQ surveys conducted annually since 2003. Data analysed included overall foodservice satisfaction and four dimensions of foodservice satisfaction: food quality, meal service quality, staff/service issues and the physical environment. Satisfaction targets were set at 4 (scale 1–5) for each foodservice dimension. Analysis showed that despite changes to the menu, overall foodservice satisfaction rated high, with a score of 4.3. Eighty-six percent of patients rated the foodservice as either ‘very good’ or ‘good’. The four foodservice dimensions were rated highly (4.2–4.8). Findings were consistent with previous survey results, demonstrating a high level of patient satisfaction across all dimensions of the foodservice, despite changes to the menu. The annual ACHFPSQ was of value to this practice question.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a reliability assessment of a substation, part of the Queensland transmission network in Australia. As part of a maintenance considerations, this study utilises the substation reliability assessment package STAREL to quantitatively compare the reliability improvement achieved by two circuit breaker reinforcement alternatives for Swanbank circuit breaker replacement or refurbishment. Substation reliability is interpreted on the basis of outage frequency and outage duration indices for each individual transmission line terminated in Swanbank 'B' substation. By considering the reliability indices in this paper with the cost associated conducted by POWERLINK Queensland, a Swanbank 'B' reinforcement alternative can be selected that optimises both transmission line security and the costs incurred in achieving it.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Climate change is expected to increase earth’s temperatures and consequently result in more frequent extreme weather events such as cyclones, storms, droughts and floods and rising global sea levels. This phenomenon will affect all assets. This paper discusses the impact of climate change and its consequences on public buildings. Public building management encompasses the building life cycle from planning, procurement, operation, repair and maintenance and building disposal. This paper recommends climate change adaptation strategies to be integrated into public building management. The roles and responsibilities of asset managers and users are discussed within the framework of planning and implementation of public building management and the integration of climate change adaptation strategies. A key point is that climate change can induce premature obsolescence of public buildings and services, which will increase the maintenance and refurbishment costs. This in turn will affect the life cycle cost of the building. Furthermore, a business continuity plan is essential for public building management in the context of disasters. The paper also highlights the significant role that the occupants of public buildings can play in the development and implementation of climate change adaptation strategies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Policy makers increasingly recognise that an educated workforce with a high proportion of Science, Technology, Engineering and Mathematics (STEM) graduates is a pre-requisite to a knowledge-based, innovative economy. Over the past ten years, the proportion of first university degrees awarded in Australia in STEM fields is below the global average and continues to decrease from 22.2% in 2002 to 18.8% in 2010 [1]. These trends are mirrored by declines between 20% and 30% in the proportions of high school students enrolled in science or maths. These trends are not unique to Australia but their impact is of concern throughout the policy-making community. To redress these demographic trends, QUT embarked upon a long-term investment strategy to integrate education and research into the physical and virtual infrastructure of the campus, recognising that expectations of students change as rapidly as technology and learning practices change. To implement this strategy, physical infrastructure refurbishment/re-building is accompanied by upgraded technologies not only for learning but also for research. QUT’s vision for its city-based campuses is to create vibrant and attractive places to learn and research and to link strongly to the wider surrounding community. Over a five year period, physical infrastructure at the Gardens Point campus was substantially reconfigured in two key stages: (a) a >$50m refurbishment of heritage-listed buildings to encompass public, retail and social spaces, learning and teaching “test beds” and research laboratories and (b) destruction of five buildings to be replaced by a $230m, >40,000m2 Science and Engineering Centre designed to accommodate retail, recreation, services, education and research in an integrated, coordinated precinct. This landmark project is characterised by (i) self-evident, collaborative spaces for learning, research and social engagement, (ii) sustainable building practices and sustainable ongoing operation and; (iii) dynamic and mobile re-configuration of spaces or staffing to meet demand. Innovative spaces allow for transformative, cohort-driven learning and the collaborative use of space to prosecute joint class projects. Research laboratories are aggregated, centralised and “on display” to the public, students and staff. A major visualisation space – the largest multi-touch, multi-user facility constructed to date – is a centrepiece feature that focuses on demonstrating scientific and engineering principles or science oriented scenes at large scale (e.g. the Great Barrier Reef). Content on this visualisation facility is integrated with the regional school curricula and supports an in-house schools program for student and teacher engagement. Researchers are accommodated in a combined open-plan and office floor-space (80% open plan) to encourage interdisciplinary engagement and cross-fertilisation of skills, ideas and projects. This combination of spaces re-invigorates the on-campus experience, extends educational engagement across all ages and rapidly enhances research collaboration.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

CIB is developing a priority theme, now termed Improving Construction and Use through Integrated Design & Delivery Solutions (IDDS). The IDDS working group for this theme adopted the following definition: Integrated Design and Delivery Solutions use collaborative work processes and enhanced skills, with integrated data, information, and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, and operation, and across projects. The design, construction, and commissioning sectors have been repeatedly analysed as inefficient and may or may not be quite as bad as portrayed; however, there is unquestionably significant scope for IDDS to improve the delivery of value to clients, stakeholders (including occupants), and society in general, simultaneously driving down cost and time to deliver operational constructed facilities. Although various initiatives developed from computer‐aided design and manufacturing technologies, lean construction, modularization, prefabrication and integrated project delivery are currently being adopted by some sectors and specialisations in construction; IDDS provides the vision for a more holistic future transformation. Successful use of IDDS requires improvements in work processes, technology, and people’s capabilities to span the entire construction lifecycle from conception through design, construction, commissioning, operation, refurbishment/ retrofit and recycling, and considering the building’s interaction with its environment. This vision extends beyond new buildings to encompass modifications and upgrades, particularly those aimed at improved local and area sustainability goals. IDDS will facilitate greater flexibility of design options, work packaging strategies and collaboration with suppliers and trades, which will be essential to meet evolving sustainability targets. As knowledge capture and reuse become prevalent, IDDS best practice should become the norm, rather than the exception.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Queensland Centre for Social Science Innovation was formed in 2012 to develop collaborations among the Queensland Government and five Queensland universities—The University of Queensland, Griffith University, Queensland University of Technology, James Cook University and Central Queensland University. Three priorities for initial projects were established by the Queensland Government with response by the participating universities. This project addressed the identified priority area: factors affecting educational achievement and investigation of the link between school design, refurbishment and educational outcomes. The proposal for this project indicated that a Review of research literature would be undertaken that linked school and classroom design with educational outcomes for learners in the 21st century. Further, research would be examined for impact of technology on staff and students, as well as learning spaces that addressed the diversity of student learners. Specific investigation of research on effective design to enhance learning outcomes for Aboriginal and Torres Strait Islander students was to be undertaken. The project therefore consists of a Review of research literature to provide an evidence base on the impact of school and classroom on educational outcomes. The original proposal indicated that indicators of successful school and classroom design would be student learning outcomes on a range of variables, with input, the specific architectural design elements. The review was undertaken during the period July 2012 to June 2013. A search was undertaken of journals, databases, and websources to identify relevant material. These were examined for evidence-based statements and design of learning spaces to enhance learning. The Review is comprehensive, and representative of issues raised in research, and conceptualisations and debates informing modern educational design. Initial findings indicated two key findings central to reading this Review. The first key finding is that the predominant focus of modern design of learning space is on process and the engagement of stakeholders. Schools are social institutions and development of a school as a learning space to suit 21st century learning needs necessarily involves the staff, students and other members of the community as key participants. The concept of social aspects of design is threaded throughout the Review. The second key finding is that little research explicitly examined the relationship between the design of learning spaces and educational outcomes. While some research does exist, the most explicitly-focused research uses narrow test-based achievement as the learning outcomes. These are not sympathetic to the overall framings of the research on 21st century learning, future schooling and the needs of the new generation of learners and society.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Woods Bagot 2007 refurbishment of the Qantas and British Airways Bangkok Business lounge in the Survarnabhumi Airport features wall finishes designed by wallpaper designer, Florence Broadhurst (1899-1977) and Thai Silk trader, Jim Thompson (1906-1967). This distinctive selection, which is proclaimed on the airport’s website, of patterned wall surfaces side by side draws attention to their striking similarities and their defining differences . Thompson and Broadhurst would appear to be worlds apart, but here in the airport their work brings them together. Thompson, the son of a wealthy cotton family in America, worked as an architect before joining the army. He moved to Bangkok to start The Thai Silk Company in 1948. Broadhurst was born on a farm in Mt. Perry, Queensland. She began her career as a performance artist, as part of an Australian troupe in Shanghai, moving onto pursue a career in fashion design, catering to the middle and upper classes in London. Upon her return to Australia, Broadhurst started a print design company in 1959. Both Broadhurst and Thompson pursued multiple careers, lived many lives, and died under mysterious circumstances. Broadhurst was murdered in 1977 at her Sydney print warehouse, which remains an unsolved crime. Thompson disappeared in Malaysia in 1967 and his body has never been found. This chapter investigates the parallels between Thompson and Broadhurst and what lead them to design such popular patterns for wall surfaces towards the end of their careers. While neither designer was a household name, their work is familiar to most, seen in the costume and set design of films, on the walls of restaurants and cafes and even in family homes. The reason for the popularity of their patterns has not previously been analysed. However, this chapter suggests that the patterns are intriguing because they contain something of their designers’ identities. It suggests that the coloured surface provides a way of camouflaging and hiding its subjects’ histories, such that Broadhurst and Thompson, consciously or unconsciously, used the patterned surface as a plane in which their past lives could be buried. The revealing nature of the stark white wall, compared with the forgiveness provided by the pattern in which to hide, is elaborated by painter and advocate for polychromatic architecture, Fernand Léger in his essay, “The Wall, The Architect, The Painter (1965).” Léger writes that, “the modern architect has gone too far in his magnificent attempts to cleanse through emptiness,” and that the resultant white walls of modernity create ‘an impalpability of air, of slick, brilliant new surfaces where nothing can be hidden any longer …even shadows don’t dare to enter’. To counter the exposure produced by the white wall, Thompson and Broadhurst designed patterned surfaces that could harbour their personal histories. Broadhurst and Thompson’s works share a number of commonalities in their design production, even though their work in print design commenced a decade apart. Both designers opted to work more with traditional methods of pattern making. Broadhurst used hand-operated screens, and Thompson outsourced work to local weavers and refrained from operating out of a factory. Despite humble beginnings, Broadhurst and Thompson enjoyed international success with their wall patterns being featured in a number of renowned international hotels in Bahrain, Singapore, Sydney, and London in the 1970s and 1980s. Their patterns were also transferred to fabric for soft furnishings and clothing. Thompson’s patterns were used for costumes in films including the King and I and Ben Hur. Broadhurst’s patterns were also widely used by fashion designers and artists, such as Akira Isogowa‘s costume design for Salome, a 1998 production by the Sydney Dance Company. Most recently her print designs have been used by skin illustrator Emma Hack, in a series of works painting female bodies into Broadhurst’s patterns. Hack’s works camouflage the models’ bodies into the patterned surface, assimilating subject and surface, hinting at there being something living within the patterned wall. More than four decades after Broadhurst’s murder and five decades since Thompson’s disappearance, their print designs persist as more than just a legacy. They are applied as surface finishes with the same fervour as when the designs were first released. This chapter argues that the reason for the ongoing celebration of their work is that there is the impalpable presence of the creator in the patterns. It suggests that the patterns blur the boundary between subject and surface.