Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong
Resumo:
Public Private Partnership (PPP) is a well established methodology for procuring public works projects. By incorporating the private sector’s expertise, efficiency, innovation, business sense, risk sharing, financing etc. into public works projects, the quality of public services and facilities can be uplifted. Like many jurisdictions, Hong Kong is also keen to take aboard this methodology which is so familiar but yet so distant. Although they have been one of the first jurisdictions to utilise the private sector in public works projects, their comfortable financial reserves has meant that there has been no urge to push the movement until recently. PPP has become increasingly popular amongst governments. The Hong Kong Special Administrative Region (HKSAR) government is no exception. Some of the more active works departments have commissioned studies to investigate the best ways to deliver these projects, others have even trialed the method themselves. The efficiency Unit of the HKSAR government has also become an active arm in conducting research in this area. Although so, the information that is currently available is still very broad. Building from their works there is a need to develop a best practice framework for implementing PPP projects in Hong Kong by incorporating international experiences. To develop a best practice framework will require thorough investigation into the benefits, difficulties and critical success factor of PPP. PPP should also be compared with other procurement methods. In order to do so it is important to clearly understand the local situation by an analysis of projects conducted to date. Lessons learnt can further be derived from other countries and incorporated to those derived locally. Finally the best conditions in terms of project nature, complexity, types, and scales for adopting PPP should be derived. The aim and objectives of this study were achieved via a comprehensive literature review, in-depth case analyses, interview survey with experts from both Hong Kong and overseas, and finally a large scale data collection was conducted via a questionnaire survey with PPP practitioners. These findings were further triangulated before they were used as the basis to form the best practice framework presented in this thesis. The framework was then further validated by PPP experts to ensure it is comprehensive, objective, reliable and practical. This study has presented a methodology that can be adopted for future studies. It has also updated our knowledge on the development trends of PPP as well as opened up the experiences of other jurisdictions. The findings have shown that the local industry is familiar with “what” should be done in PPP projects but they are unsure of “how” these goals can be achieved. This framework has allowed this further knowledge to be delivered to PPP practitioners. As a result, the development of this framework can help to resolve the current economic crisis by encouraging more developments and business opportunities for the private sector. In addition, the correct projects can be delivered by PPP, the advantages of PPP can be maximised, and the general public can benefit from the private sector’s participation.
Resumo:
Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.
Resumo:
Public and private sector organisations worldwide are putting strategies in place to manage the commercial and operational risks of climate change. However, community organisations are lagging behind in their understanding and preparedness, despite them being among the most exposed to the effects of climate change impacts and regulation. This poster presents a proposal for a multidisciplinary study that addresses this issue by developing, testing and applying a novel climate risk assessment methodology that is tailored to the needs of Australia’s community sector and its clients. Strategies to mitigate risks and build resilience and adaptive capacity will be identified including new opportunities afforded by urban informatics, social media, and technologies of scale making.
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
The workplace is evolving and the predicted impact of demographic changes (Salt, 2009; Taylor, 2005) has seen organisations focus on strategic workforce planning. As part of this, many organisations have established or expanded formalised graduate programs to attract graduates and transition them effectively into organisations (McDermott, Mangan, & O'Connor, 2005; Terjesen, Freeman, & Vinnicombe, 2007). The workplace context is also argued to be changing because of the divergence in preferences and priorities across the different generations in the workplace - a topic which is prolific in the popular culture media but is yet to be fully developed in the academic literature (Jorgenson, 2003). The public sector recruits large numbers of graduates and maintains well established graduate programs. Like the workplace context, the public sector is seen to be undergoing a transition to more closely align its practices and processes with that of the private sector (Haynes & Melville Jones, 1999; N. Preston, 1995). Consequently, questions have been raised as to how new workforce entrants see the public sector and its associated attractiveness as an employment option. This research draws together these issues and reviews the formation of, and change in, the psychological contracts of graduates across ten Queensland public sector graduate programs. To understand the employment relationship, the theories of psychological contract and public service motivation are utilised. Specifically, this research focuses on graduates' and managers' expectations over time, the organisational perspective of the employment relationship and how ideology influences graduates' psychological contract. A longitudinal mixed method design, involving individual interviews and surveys, is employed along with significant researcher-practitioner collaboration throughout the research process. A number of important qualitative and quantitative findings arose from this study and there was strong triangulation between results from the two methods. Prior to starting with the organisation, graduates found it difficult to articulate their expectations; however, organisational experience rapidly brought these to the fore. Of the expectations that became salient, most centred on their relationship with their supervisor. Without experience and quality information on which to base their expectations, graduates tended to over-rely on sectoral stereotypes which negatively impacted their psychological contracts. Socialisation only limited affected graduates' psychological contracts and public service motivation. The graduate survey, measured thrice throughout the first 12 months of the graduate program, revealed that the psychological contract and public service motivation results followed a similar trajectory of beginning at mediocre levels, declining between times one and two and increasing between times two and three (although this is not back to original levels). Graduates attributed these to a number of sectoral, organisational, team, supervisory and individual factors. On a theoretical level, this research provides support for the notion of ideology within the psychological contract although it raises some important questions about how it is conceptualised. Additionally, support is given for the manager to be seen as the primary organisational counterpart to the employee in future theoretical and practical work. The research also argues to extend current notions of time within the psychological contract as this seems to be the most divergent and combustible issue across the generations in terms of how the workplace is perceived. A number of practical implications also transpire from the study and the collaborative foundation was highly successful. It is anticipated that this research will make a meaningful contribution to both the theory and practice of the employment relationship with particular regard to graduates entering the public sector.
Resumo:
Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
PPP is a general term covering all contracted relationships between the public and private sectors to produce a public asset or to deliver a public service. Its major advantage lies in utilising resources from the private sector to alleviate some of the financial burdens of the government. The Asian financial turmoil in the late 1990s has imposed enormous pressure on the budget of the Hong Kong Special Administrative Region (HKSAR) Government. With a continuous outcry for better public services due to the rapid development of Hong Kong, alternative financing models need to be sought to ensure sustainability. Hong Kong has the advantage of being the international gateway to Mainland China, and with this benefit has attracted overseas enterprises to base their offices in Hong Kong for the Asian market. Obviously the private sector has much to contribute. The HKSAR Government has realised the benefits of using PPP in Hong Kong as well as the success achieved overseas. But a more thorough research is needed to develop the most suitable practice of PPP in terms of project nature, project complexity, project type and project scale under which PPP is most appropriate for Hong Kong. This paper provides an initial report of a research project being funded by the Research Grants Council (RGC) of the HKSAR. The project aims to evaluate the benefits and risks of PPP adopted in Australia and the United Kingdom, and from these previous experiences to develop a best practice framework for implementing PPP in Hong Kong. It firstly reports on the status of PPP development trend and the hands-on experiences which have been drawn in these countries. Qualitative and quantitative research methods applied in conducting the research are discussed. The likely impacts of the study are highlighted. It is believed that the construction industry and the government would benefit a lot as a result of this study, and further procurement and project financing options would be opened up for delivering better future public service.
Resumo:
The Australian income tax regime is generally regarded as a mechanism by which the Federal Government raises revenue, with much of the revenue raised used to support public spending programs. A prime example of this type of spending program is health care. However, a government may also decide that the private sector should provide a greater share of the nation's health care. To achieve such a policy it can bring about change through positive regulation, or it can use the taxation regime, via tax expenditures, not to raise revenue but to steer or influence individuals in its desired direction. When used for this purpose, tax expenditures steer taxpayers towards or away from certain behaviour by either imposing costs on, or providing benefits to them. Within the context of the health sector, the Australian Federal Government deploys social steering via the tax system, with the Medicare Levy Surcharge and the 30 percent Private Health Insurance Rebate intended to steer taxpayer behaviour towards the Government’s policy goal of increasing the amount of health provision through the private sector. These steering mechanisms are complemented by the ‘Lifetime Health Cover Initiative’. This article, through the lens of behavioural economics, considers the ways in which these assorted mechanisms might have been expected to operate and whether they encourage individuals to purchase private health insurance.
Resumo:
Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.
Resumo:
Purpose – This mixed-method study aims to determine the extent to which the career paths of senior managers conform with the traditional versus protean elements described in the careers literature and whether these paths vary by gender. Design/methodology/approach – A total of 15 senior managers (seven women and eight men) in a large public sector agency in Australia were interviewed about their career trajectories to date. Data were coded according to four major areas which characterise and distinguish between traditional and protean careers: development, orientation of the employee, definition of success, and organisational environment. A total of 81 managers (34 women and 47 men) from the same organisation were also surveyed. Variables of interest were those that could be triangulated with qualitative data such as the availability of career opportunities. Findings – Results suggest that, contrary to much existing literature which proposes that all careers have been fundamentally altered, the traditional career which relies on length of service, geographic mobility and a steady climb up the corporate ladder, is still the dominant model in some organisations. However, the trend towards protean careers is evident and is more pronounced for women than for men. Research limitations/implications – The specific nature of the organisation (large, male-dominated, public sector) may limit the generalisability of results. Practical implications – The framework used to explore career paths according to traditional/ protean elements in this study may assist human resource practitioners to develop appropriate strategies which maximise the professional development of employees. Originality/value – The results of this research challenge the universality of change in the nature of careers, particularly in public sector environments.
Resumo:
China continues to face great challenges in meeting the health needs of its large population. The challenges are not just lack of resources, but also how to use existing resources more efficiently, more effectively, and more equitably. Now a major unaddressed challenge facing China is how to reform an inefficient, poorly organized health care delivery system. The objective of this study is to analyze the role of private health care provision in China and discuss the implications of increasing private-sector development for improving health system performance. This study is based on an extensive literature review, the purpose of which was to identify, summarize, and evaluate ideas and information on private health care provision in China. In addition, the study uses secondary data analysis and the results of previous study by the authors to highlight the current situation of private health care provision in one province of China. This study found that government-owned hospitals form the backbone of the health care system and also account for most health care service provision. However, even though the public health care system is constantly trying to adapt to population needs and improve its performance, there are many problems in the system, such as limited access, low efficiency, poor quality, cost inflation, and low patient satisfaction. Currently, private hospitals are relatively rare, and private health care as an important component of the health care system in China has received little policy attention. It is argued that policymakers in China should recognize the role of private health care provision for health system performance, and then define and achieve an appropriate role for private health care provision in helping to respond to the many challenges facing the health system in present-day China.
Resumo:
Background: Women who birth in private facilities in Australia are more likely to have a caesarean birth than women who birth in public facilities and these differences remain after accounting for sector differences in the demographic and health risk profiles of women. However, the extent to which women’s preferences and/or freedom to choose their mode of birth further account for differences in the likelihood of caesarean birth between the sectors remains untested. Method: Women who birthed in Queensland, Australia during a two-week period in 2009 were mailed a self-report survey approximately three months after birth. Seven hundred and fifty-seven women provided cross-sectional retrospective data on where they birthed (public or private facility), mode of birth (vaginal or caesarean) and risk factors, along with their preferences and freedom to choose their mode of birth. A hierarchical logistic regression was conducted to determine the extent to which maternal risk and freedom to choose one’s mode of birth explain sector differences in the likelihood of having a caesarean birth. Findings: While there was no sector difference in women’s preference for mode of birth, women who birthed in private facilities had higher odds of feeling able to choose either a vaginal or caesarean birth, and feeling able to choose only a caesarean birth. Women had higher odds of having caesarean birth if they birthed in private facilities, even after accounting for significant risk factors such as age, body mass index, previous caesarean and use of assisted reproductive technology. However, there was no association between place of birth and odds of having a caesarean birth after also accounting for freedom to choose one’s mode of birth. Conclusions: These findings call into question suggestions that the higher caesarean birth rate in the private sector in Australia is attributable to increased levels of obstetric risk among women birthing in the private sector or maternal preferences alone. Instead, the determinants of sector differences in the likelihood of caesarean births are complex and are linked to differences in the perceived choices for mode of birth between women birthing in the private and public systems.
Resumo:
Universities are more and more challenged by the emerging global higher education market, facilitated by advances in Information and Communication Technologies (ICT). This requires them to reconsider their mission and direction in order to function effectively and efficiently, and to be responsive to changes in their environment. In the face of increasing demands and competitive pressures, Universities like other companies, seek to continuously innovate and improve their performance. Universities are considering co-operating or sharing, both internally and externally, in a wide range of areas to achieve cost effectiveness and improvements in performance. Shared services are an effective model for re-organizing to reduce costs, increase quality and create new capabilities. Shared services are not limited to the Higher Education (HE) sector. Organizations across different sectors are adopting shared services, in particular for support functions such as Finance, Accounting, Human Resources and Information Technology. While shared services has been around for more than three decades, commencing in the 1970’s in the banking sector and then been adopted by other sectors, it is an under researched domain, with little consensus on the most fundamental issues even as basic as defining what shared services is. Moreover, the interest in shared services within Higher Education is a global phenomenon. This study on shared services is situated within the Higher Education Sector of Malaysia, and originated as an outcome resulting from a national project (2005 – 2007) conducted by the Ministry of Higher Education (MOHE) entitled "Knowledge, Information Communication Technology Strategic Plan (KICTSP) for Malaysian Public Higher Education"- where progress towards more collaborations via shared services was a key recommendation. The study’s primary objective was to understand the nature and potential for ICT shared services, in particular in the Malaysian HE sector; by laying a foundation in terms of definition, typologies and research agenda and deriving theoretically based conceptualisations of the potential benefits of shared services, success factors and issues of pursuing shared services. The study embarked on this objective with a literature review and pilot case study as a means to further define the context of the study, given the current under-researched status of ICT shared services and of shared services in Higher Education. This context definition phase illustrated a range of unaddressed issues; including a lack of common understanding of what shared services are, how they are formed, what objectives they full fill, who is involved etc. The study thus embarked on a further investigation of a more foundational nature with an exploratory phase that aimed to address these gaps, where a detailed archival analysis of shared services literature within the IS context was conducted to better understand shared services from an IS perspective. The IS literature on shared services was analysed in depth to report on the current status of shared services research in the IS domain; in particular definitions, objectives, stakeholders, the notion of sharing, theories used, and research methods applied were analysed, which provided a firmer base to this study’s design. The study also conducted a detailed content analysis of 36 cases (globally) of shared services implementations in the HE sector to better understand how shared services are structured within the HE sector and what is been shared. The results of the context definition phase and exploratory phase formed a firm basis in the multiple case studies phase which was designed to address the primary goals of this study (as presented above). Three case sites within the Malaysian HE sector was included in this analysis, resulting in empirically supported theoretical conceptualizations of shared services success factors, issues and benefits. A range of contributions are made through this study. First, the detailed archival analysis of shared services in Information Systems (IS) demonstrated the dearth of research on shared services within Information Systems. While the existing literature was synthesised to contribute towards an improved understanding of shared services in the IS domain, the areas that are yet under-developed and requires further exploration is identified and presented as a proposed research agenda for the field. This study also provides theoretical considerations and methodological guidelines to support the research agenda; to conduct better empirical research in this domain. A number of literatures based a priori frameworks (i.e. on the forms of sharing and shared services stakeholders etc) are derived in this phase, contributing to practice and research with early conceptualisations of critical aspects of shared services. Furthermore, the comprehensive archival analysis design presented and executed here is an exemplary approach of a systematic, pre-defined and tool-supported method to extract, analyse and report literature, and is documented as guidelines that can be applied for other similar literature analysis, with particular attention to supporting novice researchers. Second, the content analysis of 36 shared services initiatives in the Higher Education sector presented eight different types of structural arrangements for shared services, as observed in practice, and the salient dimensions along which those types can be usefully differentiated. Each of the eight structural arrangement types are defined and demonstrated through case examples, with further descriptive details and insights to what is shared and how the sharing occurs. This typology, grounded on secondary empirical evidence, can serve as a useful analytical tool for researchers investigating the shared services phenomenon further, and for practitioners considering the introduction or further development of shared services. Finally, the multiple case studies conducted in the Malaysian Higher Education sector, provided further empirical basis to instantiate the conceptual frameworks and typology derived from the prior phases and develops an empirically supported: (i) framework of issues and challenges, (ii) a preliminary theory of shared services success, and (iii) a benefits framework, for shared services in the Higher Education sector.