72 resultados para Public works research
Resumo:
Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.
Resumo:
Engineering assets such as roads, rail, bridges and other forms of public works are vital to the effective functioning of societies {Herder, 2006 #128}. Proficient provision of this physical infrastructure is therefore one of the key activities of government {Lædre, 2006 #123}. In order to ensure engineering assets are procured and maintained on behalf of citizens, government needs to devise the appropriate policy and institutional architecture for this purpose. The changing institutional arrangements around the procurement of engineering assets are the focus of this paper. The paper describes and analyses the transition to new, more collaborative forms of procurement arrangements which are becoming increasingly prevalent in Australia and other OECD countries. Such fundamental shifts from competitive to more collaborative approaches to project governance can be viewed as a major transition in procurement system arrangements. In many ways such changes mirror the shift from New Public Management, with its emphasis on the use of market mechanisms to achieve efficiencies {Hood, 1991 #166}, towards more collaborative approaches to service delivery, such as those under network governance arrangements {Keast, 2007 #925}. However, just as traditional forms of procurement in a market context resulted in unexpected outcomes for industry, such as a fragmented industry afflicted by chronic litigation {Dubois, 2002 #9}, the change to more collaborative forms of procurement is unlikely to be a panacea to the problems of procurement, and may well also have unintended consequences. This paper argues that perspectives from complex adaptive systems (CAS) theory can contribute to the theory and practice of managing system transitions. In particular the concept of emergence provides a key theoretical construct to understand the aggregate effect that individual project governance arrangements can have upon the structure of specific industries, which in turn impact individual projects. Emergence is understood here as the macro structure that emerges out of the interaction of agents in the system {Holland, 1998 #100; Tang, 2006 #51}.
Resumo:
The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
This paper will summarise the findings from a study that explored the link between dwelling design, or type, and energy efficiencies in sub-tropical climates. An increasing number of government and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes at both sub-divisional and dwelling levels. The study used AccuRate, a new thermal modelling tool developed by CSIRO that responds to the need to improve ventilation modelling. The study found that dwellings developed in conjunction with the Departments of Housing and Public Works have set the benchmark. It provides a snapshot of the energy efficiency of a range of dwelling types found in recent subdivisions. However, the trend toward increasing urban densities may reduce the likelihood that cooling breezes will be available to cool dwellings. The findings are relevant to regulators, designers and industry in all states interested in reducing the energy used to cool dwellings in summer.
Resumo:
In urban environments road traffic volumes are increasing and the density of living is becoming higher. As a consequence the urban community is being exposed to increasing levels of road traffic noise. It is also evident that the noise reduction potential of within-the-road-reserve treatments such as noise barriers, mounding and pavement surfacing has been exhausted. This paper presents a strategy that involves the comparison of noise ameliorative treatments both within and outside the road reserve. The noise reduction resulting from the within-the-road-reserve component of treatments has been evaluated using a leading application of the CoRTN Model, developed by the UK Department of Transport 1988 [1], and the outside road reserve treatment has been evaluated in accordance with the Australian Standard 3671, Acoustics – Road traffic noise intrusion – Building sitting and construction [5]. The evaluation of noise treatments has been undertaken using a decision support tool (DST) currently being developed under the research program conducted at RMIT University and Department of Main Roads, Queensland. The case study has been based on data from a real project in Queensland, Australia. The research described here was carried out by the Australian Cooperative Research Centre for Construction Innovation [9], in collaboration with Department of Main Roads, Queensland, Department of Public Works, Queensland, Arup Pty. Ltd., Queensland University of technology and RMIT University.
Resumo:
Properly designed decision support environments encourage proactive and objective decision making. The work presented in this paper inquires into developing a decision support environment and a tool to facilitate objective decision making in dealing with road traffic noise. The decision support methodology incorporates traffic amelioration strategies both within and outside the road reserve. The project is funded by the CRC for Construction Innovation and conducted jointly by the RMIT University and the Queensland Department of Main Roads (MR) in collaboration with the Queensland Department of Public Works, Arup Pty Ltd., and the Queensland University of Technology. In this paper, the proposed decision support framework is presented in the way of a flowchart which enabled the development of the decision support tool (DST). The underpinning concept is to establish and retain an information warehouse for each critical road segment (noise corridor) for a given planning horizon. It is understood that, in current practice, some components of the approach described are already in place but not fully integrated and supported. It provides an integrated user-friendly interface between traffic noise modeling software, noise management criteria and cost databases.
Resumo:
The road and transport industry in Australia and overseas has come a long way to understanding the impact of road traffic noise on the urban environment. Most road authorities now have guidelines to help assess and manage the impact of road traffic noise on noise-sensitive areas and development. While several economic studies across Australia and overseas have tried to value the impact of noise on property prices, decision-makers investing in road traffic noise management strategies have relatively limited historic data and case studies to go on. The perceived success of a noise management strategy currently relies largely on community expectations at a given time, and is not necessarily based on the analysis of the costs and benefits, or the long-term viability and value to the community of the proposed treatment options. With changing trends in urban design, it is essential that the 'whole-of-life' costs and benefits of noise ameliorative treatment options and strategies be identified and made available for decisionmakers in future investment considerations. For this reason, CRC for Construction Innovation Australia funded a research project, Noise Management in Urban Environments to help decision-makers with future road traffic noise management investment decisions. RMIT University and the Queensland Department of Main Roads (QDMR) have conducted the research work, in collaboration with the Queensland Department of Public Works, ARUP Pty Ltd, and the Queensland University of Technology. The research has formed the basis for the development of a decision-support software tool, and helped collate technical and costing data for known noise amelioration treatment options. We intend that the decision support software tool (DST) should help an investment decision-maker to be better informed of suitable noise ameliorative treatment options on a project-by-project basis and identify likely costs and benefits associated with each of those options. This handbook has been prepared as a procedural guide for conducting a comparative assessment of noise ameliorative options. The handbook outlines the methodology and assumptions adopted in the decision-support framework for the investment decision-maker and user of the DST. The DST has been developed to provide an integrated user-friendly interface between road traffic noise modelling software, the relevant assessment criteria and the options analysis process. A user guide for the DST is incorporated in this handbook.
Resumo:
The Queensland Department of Public Works (DPW) holds a significant interest in the Brisbane Central Business District (CBD) in controlling approximately 20 percent of the office space within its confines. This comprises a total of 333,903 square metres of space, of which 170,111 square metres is owned and 163,792 square metres is leased from the private sector. The department’s nominal ownership extends to several enduring, landmark buildings as well as several modern office towers. The portfolio includes the oldest building in the CBD, being the former Commissariat Stores building and one of the newest, a 15,000 square metre office tower under construction at 33 Charlotte Street.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms sets the stage for an adversarial and potentially destructive approach. There is a need for change in the construction industry—not only to a more cooperative approach to build mutual trust, respect and good faith—but also from a confrontationist and adversarial attitude to a harmonious relationship. It is necessary to change the culture to create a win-win situation. “Strategic Alliances” is one such concept. A strategic alliance is a cooperative arrangement between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. This paper begins with an overview of the Australian building construction industry, then reviews the literature and describes an analysis framework comprising six attributes of strategic alliances—trust, commitment, interdependence, cooperation, communication, and joint problem solving. Given the trend towards greater emphasis on broader contracting firm performance criteria, indicators are proposed as a component of the tender evaluation process for public works.
Resumo:
Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.