204 resultados para Public procurement process
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
This paper describes and analyses the procurement processes employed in delivering the Sydney Olympic Stadium – arguably the most significant stadia project in the region today. This current high profile project is discussed in terms of a case study into the procurement processes used. Interviews, personal site visits and questionnaires were used to obtain information on the procurement processes used and comments on their application to the project. The alternative procurement process used on this project—Design and Construction within a Build, Own, Operate and Transfer (BOOT) project—is likely to impact on the construction industry as a whole. Already other projects and sectors are following this lead. Based on a series of on-site interviews and questionnaires, a series of benefits and drawbacks to this procurement strategy are provided.The Olympic Stadium project has also been further analysed during construction through a Degree of Interaction framework to determine anticipated project success. This analysis investigates project interaction and user satisfaction to provide a comparable rating. A series of questionnaires were used to collect data to calculate the Degree of Interaction and User Satisfaction ratings.
Resumo:
In asset intensive industries such as mining, oil & gas, utilities etc. most of the capital expenditure happens on acquiring engineering assets. Process of acquiring assets is called as “Procurement” or “Acquisition”. An asset procurement decision should be taken in consideration with the installation, commissioning, operational, maintenance and disposal needs of an asset or spare. However, such cross-functional collaboration and communication does not appear to happen between engineering, maintenance, warehousing and procurement functions in many asset intensive industries. Acquisition planning and execution are two distinct parts of asset acquisition process. Acquisition planning or procurement planning is responsible for determining exactly what is required to be purchased. It is important that an asset acquisition decision is the result of cross-functional decision making process. An acquisition decision leads to a formal purchase order. Most costly asset decisions occur even before they are acquired. Therefore, acquisition decision should be an outcome of an integrated planning & decision making process. Asset intensive organizations both, Government and non Government in Australia spent AUD 102.5 Billion on asset acquisition in year 2008-09. There is widespread evidence of many assets and spare not being used or utilized and in the end are written off. This clearly shows that many organizations end up buying assets or spares which were not required or non-conforming to the needs of user functions. It is due the fact that strategic and software driven procurement process do not consider all the requirements from various functions within the organization which contribute to the operation and maintenance of the asset over its life cycle. There is a lot of research done on how to implement an effective procurement process. There are numerous software solutions available for executing a procurement process. However, not much research is done on how to arrive at a cross functional procurement planning process. It is also important to link procurement planning process to procurement execution process. This research will discuss ““Acquisition Engineering Model” (AEM) framework, which aims at assisting acquisition decision making based on various criteria to satisfy cross-functional organizational requirements. Acquisition Engineering Model (AEM) will consider inputs from corporate asset management strategy, production management, maintenance management, warehousing, finance and HSE. Therefore, it is essential that the multi-criteria driven acquisition planning process is carried out and its output is fed to the asset acquisition (procurement execution) process. An effective procurement decision making framework to perform acquisition planning which considers various functional criteria will be discussed in this paper.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
Purpose – The purpose of this paper is to investigate whether new and young firms are different from older firms. This analysis is undertaken to explore general characteristics, use of external resources and growth orientation. Design/methodology/approach – Data from the 2008 UK Federation of Small Businesses survey provided 8,000 responses. Quantitative analysis identified significantly different characteristics of firms from 0-4, 4-9, 9-19 and 20+ years. Factor analysis was utilised to identify the advice sets, finance and public procurement customers of greatest interest, with ANOVA used to statistically compare firms in the identified age groups with different growth aspirations. Findings – The findings reveal key differences between new, young and older firms in terms of characteristics including business sector, owner/manager age, education/business experience, legal status, intellectual property and trading performance. New and young firms were more able to access beneficial resources in terms of finance and advice from several sources. New and young firms were also able to more easily access government and external finance, as well as government advice, but less able to access public procurement. Research limitations/implications – New and young firms are utilising external networks to access several resources for development purposes, and this differs for older firms. This suggests that a more explicit age-differentiated focus is required for government policies aimed at supporting firm growth. Originality/value – The study provides important baseline data for future quantitative and qualitative studies focused on the impact of firm age and government policy.
Resumo:
This research is focused on realizing productivity benefits for the delivery of transport infrastructure in the Australian construction industry through the use of building information modeling (BIM), virtual design and construction (VDC) and integrated project delivery (IPD). Specific objectives include: (I) building an understanding of the institutional environment, business systems and support mechanisms (e.g., training and skilling) which impact on the uptake of BIM/VDC; (II) gathering data to undertake a cross-country analysis of these environments; and (III) providing strategic and practical outcomes to guide the uptake of such processes in Australia. Activities which will inform this research include a review of academic literature and industry documentation, semi-formal interviews in Australia and Sweden, and a cross-country comparative analysis to determine factors affecting uptake and associated productivity improvements. These activities will seek to highlight the gaps between current-practice and best-practice which are impacting on widespread adoption of BIM/VDC and IPD. Early findings will be discussed with intended outcomes of this research being used to: inform a national public procurement strategy; provide guidelines for new contractual frameworks; and contribute to closing skill gaps. Keywords: building information modeling (BIM); virtual design and construction (VDC); integrated project delivery (IPD); transport infrastructure; Australia; procurement
Resumo:
Many infrastructure agencies adopt sustainability objectives at a corporate level and incorporate sustainability targets and indicators as part of corporate reporting processes. These objectives are expected to translate to all stages of the project delivery process, including project selection. For infrastructure capital works projects and programs, a robust project management approach involves the development of a business case to guide investment decision making. A key tool in the assessment of project options and selection of a delivery strategy is Cost Benefit Analysis (CBA). Infrastructure providers are required to undertake cost benefit analysis to support project selection through regulatory approval and budgetary processes. This tool has emerged through the prism of economic analysis rather than sustainability. A literature review reveals the limitations of CBA alone to effectively evaluate economic, environmental and social externalities or impacts that apply over a long time frame, and that are ultimately irreversible. Multi-Criteria Analysis (MCA) has been introduced as a means to incorporate a wider array of factors into decision making such as sustainability. This, however, presents new challenges with issues around how to transparently represent wider community values in the selection of a preferred solution. Are these tools effective in assessing the wider sustainability costs and benefits taking into account that these are public works with long life spans and significant impacts across institutional boundaries? The research indicates a need to develop clear guidelines for investment decision making in order to better align with corporate sustainability objectives. Findings from the literature review indicate that a more sustainable approach to investment decision-making framework should include: the incorporation of sustainability goals from corporate planning documents; problem definition and option generation using best practice investment management guidelines; improved guidelines for Business Case development using a combination of both Cost Benefit Analysis and Multi-Criteria Analysis; and an integrated public participation process.
Resumo:
Recent amendments to youth justice legislation in Queensland include opening Children’s Court proceedings, removing the Principle of Detention as a Last Resort, facilitating transfers of 17 year-old offenders to adult prisons, instigating new bail offences, and introducing mandatory boot camp orders. This article examines the context of these changes including the inadequacies of the public policy process, and the impassioned political rhetoric imbued with simplistic slogans. This is a case study of regressive youth justice policy and the article reflects on the many causes underlying the reactive winding back of reform.
Resumo:
10 page document containing expert assessment of shortcomings of Western Australian State Planning Policy SPP3.7- Planning for Bushfire Risk Management. Document produced on behalf of QUT and submitted to and published by the WAPC as part of their public consultation process for their draft policy.
Resumo:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
Resumo:
The Rio+20 United Nations Conference on Sustainable Development featured a fractious debate over intellectual property and the environment. Not only was there heated debate about patent law, technology transfer, and sustainable development, there was also a debate about sustainable public procurement, eco-labelling, accountable advertising, and greenwashing.
Resumo:
1. Under the Terms of Reference for the Committee’s Inquiry, ‘lemons’ are defined as ‘new motor vehicles with numerous, severe defects that re-occur despite multiple repair attempts or where defects have caused a new motor vehicle to be out of service for a prolonged period of time’. Consumers are currently protected in relation to lemon purchases by the Australian Consumer Law (ACL) located in Schedule 2 of the Competition and Consumer Act 2010 (Cth) (CCA). The ACL applies as a law of Queensland pursuant to the Fair Trading Act 1989 (Qld). The voluntary recall and consumer guarantees law took effect on 1 January 2011. 2. In 2006, the Government of Victoria made a commitment to introduce a lemon law into the provisions of the then Fair Trading Act 1999 (Vic). The public consultation process on the proposal to introduce a lemon law for motor vehicle purchases in Victoria was conducted by Ms Janice Munt MP, with the assistance of Consumer Affairs Victoria (CAV). CAV released an Issues Paper to canvas with industry and the community options for the development and introduction of a motor vehicle lemon law.(Consumer Affairs Victoria, Introducing Victorian motor vehicle lemon laws, Issues Paper, (September, 2007). 3. A CAV report prepared by Janice Munt MP was released in July, 2008 (Consumer Affairs Victoria, Motor Cars: A report on the motor vehicle lemon law consultations (July 2008) (Victorian Lemon Law Report). However, the Victorian proposal was overtaken by events leading to the adoption of a uniform consumer protection law in all Australian jurisdictions, the ACL. 4. The structure of this submission is to consider first the three different bases upon which consumers can obtain relief for economic loss arising from defects in motor vehicles. The second part of the submission considers the difficulties encountered by consumers in litigating motor vehicle disputes in the courts and tribunals. The third part of the submission examines the approach taken in other jurisdictions to resolving motor vehicle disputes. The final part of the submission considers a number of possible reforms that could be made to the existing law and its enforcement to reduce consumer detriment arising from the purchase of ‘lemon’ motor vehicles. 5. There are three principal bases upon which a consumer can obtain redress for defects in new motor vehicles under the ACL. The first is where the manufacturer admits liability and initiates the voluntary recall procedure provided for in s 128 of the ACL. Under this basis the manufacturer generally repairs or replaces the part subject to the recall free of charge. The second basis is where the manufacturer or dealer denies liability and the consumer is initiates proceedings in the court or tribunal seeking a statutory remedy under the ACL, the nature of which will depend on whether the failure to comply with the consumer guarantee was major or not. The third basis upon which a consumer can obtain redress is pursuant to public enforcement by the ACCC. Each basis will be considered in this part. What all three bases have in common is the need to conduct an investigation to identify the nature of the defect and how it arose.
Resumo:
Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.
A Process Modelling Success Model: Case Study Insights from an Australian Public Sector Organisation