179 resultados para Psychosocial Rehabilitation
Resumo:
Primary brain tumors are associated with significant physical, cognitive and psychosocial changes. Although treatment guidelines recommend offering multidisciplinary rehabilitation and support services to address patients’ residual deficits, the extent to which patients access such services is unclear. This study aimed to assess patients’ supportive care needs early after diagnosis, and quantify service awareness, referral and utilization. A population-based sample of 40 adults recently diagnosed with primary brain tumors was recruited through the Queensland Cancer Registry, representing 18.9% of the eligible population of 203 patients. Patients or carer proxies completed surveys of supportive care needs at baseline (approximately three months after diagnosis) and three months later. Descriptive statistics summarized needs and service utilization, and linear regression identified predictors of service use. Unmet supportive care needs were highest at baseline for all domains, and highest for the physical and psychological needs domains at each time point. At follow-up, participants reported awareness of, referral to, and use of 32 informational, support, health professional or practical services. All or almost all participants were aware of at least one informational (100%), health professional (100%), support (97%) or practical service (94%). Participants were most commonly aware of speech therapists (97%), physiotherapists (94%) and diagnostic information from the internet (88%). Clinician referrals were most commonly made to physiotherapists (53%), speech therapists (50%) and diagnostic information booklets (44%), and accordingly, participants most commonly used physiotherapists (56%), diagnostic information booklets (47%), diagnostic information from the internet (47%), and speech therapists (43%). Comparatively low referral to and use of psychosocial services may limit patients’ abilities to cope with their condition and the changes they experience.
Resumo:
Despite advances in psychopharmacology, schizophrenia remains a severely disabling illness. It is now appreciated that cognitive impairment mediates the functional disability associated with the disorder. Cognitive remediation which is defined as “a behavioural training based intervention that aims to improve cognitive processes (attention, memory, executive functioning, social cognition or meta cognition) with the goal of durability and generalization” is a therapeutic approach that improves cognition and when combined with other rehabilitation strategies improves real world functioning (Wykes et al., 2011).
Resumo:
This descriptive correlational study examined relationships between mild stroke functional and psychosocial outcomes over the early post-discharge period among dyads of mild stroke patients (n=38) and their spousal caregivers (n=38). We measured patients' functional scores using the modified Rankin Scale; patients' and caregivers' quality of life (QoL) using Stroke Impact Scale and Short-Form 36 respectively, mood using the Beck Depression Inventory-II, and marital function scores using the Family Assessment Device. Spousal caregivers also completed the Bakas Caregiving Outcomes Scale as a measure of caregiver strain. The average age of stroke patients was 64 years and of spousal caregivers 58 years. All stroke patients were male; all spousal caregivers female. At three months post discharge, patient functional status scores had significantly improved from discharge (p=0.026) with a corresponding increase in QoL scores (p=0.012). Functional status was significantly correlated with patient perceptions of QoL at three months (r=.014, p=0.024) and spousal caregiver perceptions of physical domain QoL (r=.-.397, p=0.014). Spousal caregivers' mood at three months post discharge was strongly correlated with their perceptions of marital satisfaction (r=.578, p=0.000) and caregiver strain (r=-.620, p=0.000). In preparing patients for discharge following mild stroke, nurses must consider the psychological and social implications of the recovery process over time for both the patient with stroke and their spousal caregivers.
Resumo:
Background Mild stroke survivors are generally discharged from acute care within a few days of the stroke event, often without rehabilitation follow-up. We aimed to examine the recovery trajectory for male patients and their wife-caregivers during the 12 months postdischarge. Methods A descriptive study was undertaken to examine functional outcomes, quality of life (QOL), depression, caregiver strain, and marital function in a prospective cohort of male survivors of mild stroke and their wife-caregivers during the 12 months postdischarge. Data from each point in time were summarized and repeated measures analyses undertaken. Logistic regression was used to determine which baseline demographic and biopsychosocial variables influenced or predicted marital functioning 1 year postdischarge. Results A total of 38 male patients (mean age 63.4 years) and their wife-caregivers (mean age 58.5 years) were examined. The median discharge National Institutes of Health Stroke Scale score was 1.5, modified Rankin Scale score was 1.0, Barthel Index was 100.0, and Stroke Impact Scale-16v2 score was 78.5. The patients' modified Rankin Scale (function) and QOL scores improved significantly over time (F (2) = 4.583, P = .017; and F (6) = 5.632, P < .001, respectively). However, the wife-caregiver QOL scores did not change. Multivariate analysis revealed overall worsening of depression for both the patient and wife-caregivers (F (6, 32) = 3.087, P = .017) and marital function (F (6, 32) = 3.961, P = .004), although the wife-caregivers' perceptions of caregiver strain improved (F (6, 32) = 3.923, P = .007). None of the measured variables were associated with marital functioning 1 year postdischarge. Conclusions Despite improvement in patients' functional status, other patient and wife-caregiver psychosocial outcomes during the 12 months postdischarge may be negatively affected. Thus, attention needs to focus on recovery beyond functional outcomes.
Resumo:
The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.
Resumo:
A worldwide interest is being generated in the use of fibre reinforced polymer composites (FRP) in rehabilitation of reinforced concrete structures. As a replacement for the traditional steel plates or external post-tensioning in strengthening applications, various types of FRP plates, with their high strength to weight ratio and good resistance to corrosion, represent a class of ideal material in external retrofitting. Within the last ten years, many design guidelines have been published to provide guidance for the selection, design and installation of FRP systems for external strengthening of concrete structures. Use of these guidelines requires understanding of a number of issues pertaining to different properties and structural failure modes specific to these materials. A research initiative funded by the CRC for Construction Innovation was undertaken (primarily at RMIT) to develop a decision support tool and a user friendly guide for use of fibre reinforced polymer composites in rehabilitation of concrete structures. The user guidelines presented in this report were developed after industry consultation and a comprehensive review of the state of the art technology. The scope of the guide was mainly developed based on outcomes of two workshops with Queensland Department of Main Roads (QDMR). The document covers material properties, recommended construction requirements, design philosophy, flexural, shear and torsional strengthening of beams and strengthening of columns. In developing this document, the guidelines published on FIB Bulletin 14 (2002), Task group 9.3, International Federation of Structural Concrete (FIB) and American Concrete Institute Committee 440 report (2002) were consulted in conjunction with provisions of the Austroads Bridge design code (1992) and Australian Concrete Structures code AS3600 (2002). In conclusion, the user guide presents design examples covering typical strengthening scenarios.
Resumo:
This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.
Resumo:
An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.
Resumo:
This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.
Resumo:
This study utilized the Theory of Planned Behavior (TPB) to understand employee change readiness. The extent to which attitude, subjective norm, and perceived behavioral control predicted employees’ intentions to carry out activities that were supportive of a change event were investigated. The impact of group norm was examined as a further predictor of change-related intentions. The context of the research was a sample of 82 employees in the early stages of a re-brand. Results indicated that direct measures of attitude and subjective norm, as well as group norm, emerged as significant predictors of employees’ intentions to perform re-brand behaviors. To capture the indirect beliefs underlying attitude, subjective norm, and perceived behavioral control, participants also provided an assessment of their behavioral, normative, and control beliefs in regards to the change event, respectively. A series of MANOVAs revealed significant differences between moderate and high intenders on a range of underlying beliefs. Findings are discussed in terms of the application of the TPB for effective change management.