65 resultados para Pavement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It has been predicted that sea level will rise about 0.8 m by 2100. Consequently, seawater can intrude into the coastal aquifers and change the level of groundwater table. A raise in groundwater table due to seawater intrusion threats the coastal infrastructure such as road pavements. The mechanical properties of subgrade materials will change due to elevated rise of groundwater table, leading to pavement weakening and decreasing the subgrade strength and stiffness. This paper presents an assessment of the vulnerability of subgrade in coastal areas to change in groundwater table due to sea-level rise. A simple bathtub approach is applied for estimating the groundwater level changes according to sea-level rise. Then the effect of groundwater level changes on the soil water content (SWC) of a single column of fine-sand soil is simulated using MIKE SHE. The impact of an increase in moisture content on subgrade strength/stiffness is assessed for a number of scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The implementation of pavement management seems to ignore road safety, with its focus being mainly on infrastructure condition. Safety management as part of pavement management should consider various means of reducing the frequency of vehicle crashes by allocating corrective measures to mitigate accident exposure, as well as reduce accident severity and likelihood. However, it is common that lack of accident records and crash contributing factors impedes incorporating safety into pavement management. This paper presents a case study for the initial development of pavement management systems considering data limitations for 3000 km of Tanzania’s national roads. A performance based optimization utilizes indices for safety and surface condition to allocate corrective measures. A modified Pareto analysis capable of accounting for annual performance and of balancing resources to achieve good surface condition and low levels of safety was applied. Tradeoff analysis for the case study found the need to assign 30% relevance to condition and 70% to road safety. Safety and condition deficiencies were corrected within 5 years with the majority of improvements dedicated to surface treatments and some geometric corrections. Large investments for correcting geometric issues were observed in years two and three if more money was made available.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An innovative cement-based soft-hard-soft (SHS) multi-layer composite has been developed for protective infrastructures. Such composite consists of three layers including asphalt concrete (AC), high strength concrete (HSC), and engineered cementitious composites (ECC). A three dimensional benchmark numerical model for this SHS composite as pavement under blast load was established using LSDYNA and validated by field blast test. Parametric studies were carried out to investigate the influence of a few key parameters including thickness and strength of HSC and ECC layers, interface properties, soil conditions on the blast resistance of the composite. The outcomes of this study also enabled the establishment of a damage pattern chart for protective pavement design and rapid repair after blast load. Efficient methods to further improve the blast resistance of the SHS multi-layer pavement system were also recommended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of geogrids in granular pavement layers could increase the modulus and the stiffness of granular layer and hence the required layer thickness can be reduced. Though, geogrids are being used in granular pavements to provide lateral restraint, bearing capacity, and membrane tension support, very limited studies have been carried out to investigate the effects of geogrids on modulus and stiffness of granular layer. In this study, two sections of a granular pavement were constructed: one with a geogrid at the bottom of the base layer and the other without a geogrid. Two sections were then tested using Falling Weight Deflectometer (FWD) and FWD results were analysed to determine the effect of geogrid on the overall modulus and stiffness of the granular pavement. The results suggested that the pavement section with geogrid has higher overall modulus and deflection ratio compared to the pavement section without geogrid.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Acquiring detailed knowledge of surface treatments effectiveness is required to improve performance-based decisions for allocating resources to preserve and maintain pavements on any road network. Measurement of treatment effectiveness is a complex task that requires historical records of treatments with observations of before and after performance trends. Lack of data is often an obstacle that impedes development and incorporation of surface maintenance treatments into pavement management. This paper analyzes the effect of surface treatments on asphalt paved arterial roads for several control sections of New Brunswick. The method uses a Transition Probability Matrix to capture main effects by mapping mean trends of surface improvement and pavement structure decay. It was found that surface treatments have an immediate effect reducing the rate of loss of structural capacity. Pavements with international roughness index (IRI) smaller than 1.4 m/km did not seem to benefit from surface treatments. Those with IRI higher than 1.66 m/km gained from 6 to 8 years of additional life. Reset value for surface treatments fall between 1.18 and 1.29 m/km. This paper aims to serve to practitioners seeking to capture and incorporate effectiveness of surface treatments (i.e., crack-sealing) into Pavement Management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Airport runway pavement always subjected to huge impact loading due to the hard landing of aircraft on the pavement surface. Therefore runway pavements should have sufficient impact resistance capability to avoid damage causing by hard impact like surface deflection in downward or penetration since the repair works is cumbersome within the operating condition of airport and also increases the service life cost of the pavement structure. Several research works have been carried out on airport runway pavement to measure the present condition of pavement and also to predict future performance of it. However, most of the works are confined by pavement response under moving aircraft loading. Nevertheless, no comprehensive research work is yet conducted to identify the controlling factors which might have significant effect in changing the common pavements damage like surface penetration depth under impact of aircraft. Therefore, a 3D FE study is conducted to determine some effective factors in controlling the top surface penetration depth of runway pavement. Among the exterior factors, mass of the impactor, velocity of the impactor, impact angle and boundary conditions are selected and as interior factors, thickness of the runway pavement, compressive strength and density of materials used in the runway pavement are selected.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lead is present everywhere in the environment and has been defined as one of the greatest threats to the human health. In this paper, attempts have been made to study a way of recycling the lead produced from waste usage and disposed of in such a way as to avoid degrading the surrounding environment. In order to contain the waste, recycled asphalt material is mixed with the lead and then heated with microwave energy. This is an attempt to solidify and reduce the lead contaminants and use the final product as sub-base material in road pavement construction. The microwave heating of the specimens is carried out with 30%, 50%, 80% and 100% of power at 800W. The optimum power mode is used to compare with the conventional heating of asphalt with sulfur additive. The results are characterized by compact density, permeability, and subjected to toxicity test with regards to lead concentration. A mechanical test to evaluate the stability is also performed on the three methods of solidification and to prove that microwave zapping method allow to convert into an environmentally stable material for recycling without having to be deposited in a landfill site.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In urban environments road traffic volumes are increasing and the density of living is becoming higher. As a consequence the urban community is being exposed to increasing levels of road traffic noise. It is also evident that the noise reduction potential of within-the-road-reserve treatments such as noise barriers, mounding and pavement surfacing has been exhausted. This paper presents a strategy that involves the comparison of noise ameliorative treatments both within and outside the road reserve. The noise reduction resulting from the within-the-road-reserve component of treatments has been evaluated using a leading application of the CoRTN Model, developed by the UK Department of Transport 1988 [1], and the outside road reserve treatment has been evaluated in accordance with the Australian Standard 3671, Acoustics – Road traffic noise intrusion – Building sitting and construction [5]. The evaluation of noise treatments has been undertaken using a decision support tool (DST) currently being developed under the research program conducted at RMIT University and Department of Main Roads, Queensland. The case study has been based on data from a real project in Queensland, Australia. The research described here was carried out by the Australian Cooperative Research Centre for Construction Innovation [9], in collaboration with Department of Main Roads, Queensland, Department of Public Works, Queensland, Arup Pty. Ltd., Queensland University of technology and RMIT University.