60 resultados para Owen, Robert Dale, 1801-1877.
Resumo:
Building information modelling (BIM) radically changes the practices in architecture, engineering and construction (AEC) and creates new job opportunities. Many governments, such as the United Kingdom, have made BIM a mandatory requirement. This substantially drives the demand for a BIM-literate workforce. Universities are facing the challenge to incorporate BIM into their curricula and produce “BIM ready” graduates to meet the needs of the industry. Like other universities, Queensland University of Technology (QUT) is at the heart of this change and aspires to develop collaborative BIM education across AEC. Previous BIM education studies identify that inadequate BIM awareness of AEC academics is one of the challenges for developing a BIM curriculum and there is a dearth in the learning and teaching support for academics on BIM education. Equipping the AEC academics for a more BIM focused curriculum is all the while more important. This paper aims to leverage knowledge drawn from a Learning & Teaching project currently undertaken at QUT. Its specific objectives are to: 1) review the existing learning and teaching initiatives on BIM education; and 2) briefly describe the learning and teaching activities on collaborative BIM education at QUT. Significance of the paper lies on revealing the importance of building up the capacity of AEC academics for collaborative BIM education. The paper contributes to sparking the interests in better equipping AEC academics to understand what curriculum changes would assist in BIM uptake within the relevant courses to provide context for changes in units; and how the use of BIM can improve the understanding by students of the large amounts of professional knowledge they need to function effectively as graduates.
Resumo:
This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.
Resumo:
Cost estimating has been acknowledged as a crucial component of construction projects. Depending on available information and project requirements, cost estimates evolve in tandem with project lifecycle stages; conceptualisation, design development, execution and facility management. The premium placed on the accuracy of cost estimates is crucial to producing project tenders and eventually in budget management. Notwithstanding the initial slow pace of its adoption, Building Information Modelling (BIM) has successfully addressed a number of challenges previously characteristic of traditional approaches in the AEC, including poor communication, the prevalence of islands of information and frequent reworks. Therefore, it is conceivable that BIM can be leveraged to address specific shortcomings of cost estimation. The impetus for leveraging BIM models for accurate cost estimation is to align budgeted and actual cost. This paper hypothesises that the accuracy of BIM-based estimation, as more efficient, process-mirrors of traditional cost estimation methods, can be enhanced by simulating traditional cost estimation factors variables. Through literature reviews and preliminary expert interviews, this paper explores the factors that could potentially lead to more accurate cost estimates for construction projects. The findings show numerous factors that affect the cost estimates ranging from project information and its characteristic, project team, clients, contractual matters, and other external influences. This paper will make a particular contribution to the early phase of BIM-based project estimation.
Resumo:
Digital technology offers enormous benefits (economic, quality of design and efficiency in use) if adopted to implement integrated ways of representing the physical world in a digital form. When applied across the full extent of the built and natural world, it is referred to as the Digital Built Environment (DBE) and encompasses a wide range of approaches and technology initiatives, all aimed at the same end goal: the development of a virtual world that sufficiently mirrors the real world to form the basis for the smart cities of the present and future, enable efficient infrastructure design and programmed maintenance, and create a new foundation for economic growth and social well-being through evidence-based analysis. The creation of a National Data Policy for the DBE will facilitate the creation of additional high technology industries in Australia; provide Governments, industries and citizens with greater knowledge of the environments they occupy and plan; and offer citizen-driven innovations for the future. Australia has slipped behind other nations in the adoption and execution of Building Information Modelling (BIM) and the principal concern is that the gap is widening. Data driven innovation added $67 billion to the Australian economy in 20131. Strong open data policy equates to $16 billion in new value2. Australian Government initiatives such as the Digital Earth inspired “National Map” offer a platform and pathway to embrace the concept of a “BIM Globe”, while also leveraging unprecedented growth in open source / open data collaboration. Australia must address the challenges by learning from international experiences—most notably the UK and NZ—and mandate the use of BIM across Government, extending the Framework for Spatial Data Foundation to include the Built Environment as a theme and engaging collaboration through a “BIM globe” metaphor. This proposed DBE strategy will modernise the Australian urban planning and the construction industry. It will change the way we develop our cities by fundamentally altering the dynamics and behaviours of the supply chains and unlocking new and more efficient ways of collaborating at all stages of the project life-cycle. There are currently two major modelling approaches that contribute to the challenge of delivering the DBE. Though these collectively encompass many (often competing) approaches or proprietary software systems, all can be categorised as either: a spatial modelling approach, where the focus is generally on representing the elements that make up the world within their geographic context; and a construction modelling approach, where the focus is on models that support the life cycle management of the built environment. These two approaches have tended to evolve independently, addressing two broad industry sectors: the one concerned with understanding and managing global and regional aspects of the world that we inhabit, including disciplines concerned with climate, earth sciences, land ownership, urban and regional planning and infrastructure management; the other is concerned with planning, design, construction and operation of built facilities and includes architectural and engineering design, product manufacturing, construction, facility management and related disciplines (a process/technology commonly known as Building Information Modelling, BIM). The spatial industries have a strong voice in the development of public policy in Australia, while the construction sector, which in 2014 accounted for around 8.5% of Australia’s GDP3, has no single voice and because of its diversity, is struggling to adapt to and take advantage of the opportunity presented by these digital technologies. The experience in the UK over the past few years has demonstrated that government leadership is very effective in stimulating industry adoption of digital technologies by, on the one hand, mandating the use of BIM on public procurement projects while at the same time, providing comparatively modest funding to address the common issues that confront the industry in adopting that way of working across the supply chain. The reported result has been savings of £840m in construction costs in 2013/14 according to UK Cabinet Office figures4. There is worldwide recognition of the value of bringing these two modelling technologies together. Australia has the expertise to exercise leadership in this work, but it requires a commitment by government to recognise the importance of BIM as a companion methodology to the spatial technologies so that these two disciplinary domains can cooperate in the development of data policies and information exchange standards to smooth out common workflows. buildingSMART Australasia, SIBA and their academic partners have initiated this dialogue in Australia and wish to work collaboratively, with government support and leadership, to explore the opportunities open to us as we develop an Australasian Digital Built Environment. As part of that programme, we must develop and implement a strategy to accelerate the adoption of BIM processes across the Australian construction sector while at the same time, developing an integrated approach in concert with the spatial sector that will position Australia at the forefront of international best practice in this area. Australia and New Zealand cannot afford to be on the back foot as we face the challenges of rapid urbanisation and change in the global environment. Although we can identify some exemplary initiatives in this area, particularly in New Zealand in response to the need for more resilient urban development in the face of earthquake threats, there is still much that needs to be done. We are well situated in the Asian region to take a lead in this challenge, but we are at imminent risk of losing the initiative if we do not take action now. Strategic collaboration between Governments, Industry and Academia will create new jobs and wealth, with the potential, for example, to save around 20% on the delivery costs of new built assets, based on recent UK estimates.
Resumo:
Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.
Resumo:
Growth rods are commonly used for the treatment of scoliosis in the immature spine. Many variations have been proposed but breakage of implants is a common problem. Growth rod insertion commonly involves large exposures at initial insertion followed by multiple smaller procedures for lengthening. We present our early experiences using a percutaneous technique of insertion of a new titanium mobile bearing implant (Medtronic Inc). The implant allows some rotatory motion in the middle of the construct thus reducing construct stresses and thus possibly reducing rod breakage risk. Based on this small initial series with 12 months follow-up, percutaneous insertion of growth rods using the new implant is a safe and reliable technique although the infection rate in our sample was of note. This may be related to the titanium wear and inflammation seen in the soft tissues at time of operation and visualised on histology. No implants have required removal due to infection, and all infections were treated with debridement at next lengthening and suppressive antibiotics. Propionibacterium is one of the commonest infections seen with spinal implants and sometimes does not respond to simple antibiotic suppression. The technique allows preservation of the soft tissues until definitive fusion is needed and may lead to a decrease in hospital stay. The implant is low profile and seems to offer advantages over other systems on the market. Further follow up is needed to look at longer term outcomes with this new implant type.
Resumo:
Adolescent Idiopathic Scoliosis (AIS) is the most common deformity of the spine, affecting 2-4% of the population. Previous studies have shown that the vertebrae in scoliotic spines undergo abnormal shape changes, however there has been little exploration of how AIS affects bone density distribution within the vertebrae. Existing pre-operative CT scans of 53 female idiopathic scoliosis patients with right-sided main thoracic curves were used to measure the lateral (right to left) bone density profile at mid-height through each vertebral body. This study demonstrated that AIS patients have a marked convex/concave asymmetry in bone density for vertebral levels at or near the apex of the scoliotic curve. To the best of our knowledge, the only previous studies of bone density distribution in AIS are those of Périé et al [1,2], who reported a coronal plane ‘mechanical migration’ of 0.54mm toward the concavity of the scoliotic curve in the lumbar apical vertebrae of 11 scoliosis patients. This is comparable to the value of 0.8mm (4%) in our study, especially since our patients had more severe scoliotic curves. From a bone adaptation perspective, these results suggest that the axial loading on the scoliotic spine is strongly asymmetric.
Resumo:
Bob Baxt, the third Chairman of the Trade Practices Commission, served for a single three year term from 1988 to 1991. He followed Bob McComas, who had deliberately adopted a non-litigious approach to preserving the competitive process, believing that he understood business as an insider and that much of what it did was not anti-competitive, when correctly viewed. Baxt was far more pro-active in his approach, and more closely aligned with that of the first Chairman, Ron Bannerman. Baxt sought to push the frontiers of investigation and precedent, and perhaps, more significantly, sought to influence his Ministers, the government, public servants and public opinion about the need to expand the coverage of the Trade Practices Act, increase penalties and properly resource the Commission so that it could perform its assigned roles. This article examines Baxt’s early and on-going role in teaching Australian students and professionals through his interdisciplinary Trade Practices Workshops, the political context of Baxt’s tenure, including his relations with the Attorney-General ,Michael Duffy, and his skilful handling of the Queensland Wire case.
Resumo:
The relationship between deformity correction and self-reported patient satisfaction after thoracoscopic anterior scoliosis surgery is unknown. Scoliosis Research Society questionnaire scores, radiographic outcomes, and rib hump correction were prospectively assessed for a group of 100 patients pre-operatively and at two years after surgery. Patients with lower post-op major Cobb angles report significantly higher SRS scores than patients with higher post-op Cobb angles.
Resumo:
Introduction. Ideally after selective thoracic fusion for Lenke Class IC (i.e. major thoracic / secondary lumbar) curves, the lumbar spine will spontaneously accommodate to the corrected position of the thoracic curve, thereby achieving a balanced spine, avoiding the need for fusion of lumbar spinal segments1. The purpose of this study was to evaluate the behaviour of the lumbar curve in Lenke IC class adolescent idiopathic scoliosis (AIS) following video-assisted thoracoscopic spinal fusion and instrumentation (VATS) of the major thoracic curve. Methods. A retrospective review of 22 consecutive patients with AIS who underwent VATS by a single surgeon was conducted. The results were compared to published literature examining the behaviour of the secondary lumbar curve where other surgical approaches were employed. Results. Twenty-two patients (all female) with AIS underwent VATS. All major thoracic curves were right convex. The average age at surgery was 14 years (range 10 to 22 years). On average 6.7 levels (6 to 8) were instrumented. The mean follow-up was 25.1 months (6 to 36). The pre-operative major thoracic Cobb angle mean was 53.8° (40° to 75°). The pre-operative secondary lumbar Cobb angle mean was 43.9° (34° to 55°). On bending radiographs, the secondary curve corrected to 11.3° (0° to 35°). The rib hump mean measurement was 15.0° (7° to 21°). At latest follow-up the major thoracic Cobb angle measured on average 27.2° (20° to 41°) (p<0.001 – univariate ANOVA) and the mean secondary lumbar curve was 27.3° (15° to 42°) (p<0.001). This represented an uninstrumented secondary curve correction factor of 37.8%. The mean rib hump measured was 6.5° (2° to 15°) (p<0.001). The results above were comparable to published series when open surgery was performed. Discussion. VATS is an effective method of correcting major thoracic curves with secondary lumbar curves. The behaviour of the secondary lumbar curve is consistent with published series when open surgery, both anterior and posterior, is performed.
Resumo:
One of the primary treatment goals of adolescent idiopathic scoliosis (AIS) surgery is to achieve maximum coronal plane correction while maintaining coronal balance. However maintaining or restoring sagittal plane spinal curvature has become increasingly important in maintaining the long-term health of the spine. Patients with AIS are characterised by pre-operative thoracic hypokyphosis, and it is generally agreed that operative treatment of thoracic idiopathic scoliosis should aim to restore thoracic kyphosis to normal values while maintaining lumbar lordosis and good overall sagittal balance. The aim of this study was to evaluate CT sagittal plane parameters, with particular emphasis on thoracolumbar junctional alignment, in patients with AIS who underwent Video Assisted Thoracoscopic Spinal Fusion and Instrumentation (VATS). This study concluded that video-assisted thoracoscopic spinal fusion and instrumentation reliably increases thoracic kyphosis while preserving junctional alignment and lumbar lordosis in thoracic AIS.
Resumo:
Severe spinal deformity in young children is a formidable challenge for optimal treatment. Standard interventions for adolescents, such as spinal deformity correction and fusion, may not be appropriate for young patients with considerable growth remaining. Alternative surgical options that provide deformity correction and protect the growth remaining in the spine are needed to treat this group of patients 1, 2. One such method is the use of shape memory alloy staples. We report our experience to date using video-assisted thoracoscopic insertion of shape memory alloy staples. A retrospective review was conducted of 13 patients with scoliosis, aged 7 to 13 years, who underwent video-assisted thoracoscopic insertion of shape memory staples. In our experience, video-assisted thoracoscopic insertion of shape memory alloy staples is a safe procedure with no complications noted. It is a reliable method of providing curve stability, however the follow up results to date indicate that the effectiveness of the procedure is greater in younger patients.