156 resultados para New Methods of Construction
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
This CDROM includes PDFs of presentations on the following topics: "TXDOT Revenue and Expenditure Trends;" "Examine Highway Fund Diversions, & Benchmark Texas Vehicle Registration Fees;" "Evaluation of the JACK Model;" "Future highway construction cost trends;" "Fuel Efficiency Trends and Revenue Impact"
The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes
Resumo:
Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.
Resumo:
Nutrients balance such as nitrogen and phosphorus balance are increasingly used as an indicator of the environmental performance of agricultural sector in international and global context. However there still is a lack of harmony in the use of methods for estimating the nutrients balance among countries. This is because of the disagreement regarding the accuracy and uncertainty of different accounting methods. The lack of harmony in the methods used in different countries further increases the uncertainty in the context of the international comparisons. This paper provides a new framework for nutrients balance calculation using the farm-gate accounting method. The calculation under this new framework takes advantage of availability of data from FAO and other reliable national and international sources. Due to this, the proposed framework is highly adaptable in many countries, making the global comparison feasible. The paper also proposes three criteria including adaptability, accuracy and interpretability to assess the appropriateness of nutrients accounting method. Based on these criteria, the paper provides a comprehensive comparison of the farm-gate and soil-surface methods in accounting country-level nutrients balance of agricultural production. The paper identifies some shortcomings of the soil-surface balance and shows that the farm-gate method has a greater potential of providing a more accurate and meaningful estimation of national nutrients balance.
Resumo:
Nitrogen balance is increasingly used as an indicator of the environmental performance of agricultural sector in national, international, and global contexts. There are three main methods of accounting the national nitrogen balance: farm gate, soil surface, and soil system. OECD (2008) recently reported the nitrogen and phosphorus balances for member countries for the 1985 - 2004 period using the soil surface method. The farm gate and soil system methods were also used in some international projects. Some studies have provided the comparison among these methods and the conclusion is mixed. The motivation of this present paper was to combine these three methods to provide a more detailed auditing of the nitrogen balance and flows for national agricultural production. In addition, the present paper also provided a new strategy of using reliable international and national data sources to calculate nitrogen balance using the farm gate method. The empirical study focused on the nitrogen balance of OECD countries for the period from 1985 to 2003. The N surplus sent to the total environment of OECD surged dramatically in early 1980s, gradually decreased during 1990s but exhibited an increasing trends in early 2000s. The overall N efficiency however fluctuated without a clear increasing trend. The eco-environmental ranking shows that Australia and Ireland were the worst while Korea and Greece were the best.
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.
Resumo:
Objectives: To examine factors associated with the uptake of i) long-acting reversible, ii) permanent and iii) traditional contraceptive methods among Australian women. Methods: Participants in the Australian Longitudinal Study on Women's Health born in 1973–78 reported on their contraceptive use at three surveys: 2003, 2006 and 2009. The participants were 5,849 women aged 25–30 in 2003 randomly sampled from Medicare. The main outcome measure was current contraceptive method at age 28–33 years categorised as long-acting reversible methods (implant, IUD, injection), permanent (tubal ligation, vasectomy), and traditional methods (oral contraceptive pills, condoms, withdrawal, safe period). Results: Compared to women living in major cities, women in inner regional areas were more likely to use long-acting (OR=1.26, 95%CI 1.03–1.55) or permanent methods (OR=1.43, 95%CI 1.17–1.76). Women living in outer regional/remote areas were more likely than women living in cities to use long-acting (OR=1.65, 95%CI 1.31–2.08) or permanent methods (OR=1.69, 95%CI 1.43–2.14). Conclusions: Location of residence is an important factor in women's choices about long-acting and permanent contraception in addition to the number and age of their children. Implications: Further research is needed to understand the role of geographical location in women's access to contraceptive options in Australia.
Resumo:
"Within contemporary society the meaning of 'health' is surprisingly unstable. Guiding principles that once seemed self-evident have been challenged by new social, scientific and economic forces. This book argues that the foundational terms and concepts, which form the basic building blocks of dialogue about health, are now in flux. While the forces in play differ, and the pace of change is varied, there is now a 'brave new world' of health which characterises policy debate about health (and illness or disability). This permeates even the more narrow technical issues within clinical medicine, the law and medical science. This construction and reconstruction of health has important implications for the development of law and policy. The book draws on international and local experts to explore these issues. It opens with consideration of the economic and social forces of 'globalisation' - the macro level forces which now shape the 'lived realities' of health for the world's people. This is then contextualised through a series of detailed 'case studies' of more localised examples including; pharmaceuticals, preimplantation genetic diagnosis, body modification, abortion, anorexia and post-traumatic stress disorder. The book also interrogates the way modern health research influences public conceptions of health. Across these issues the book canvasses the social forces at work in the construction of health, disability and illness in shaping our understandings of such concepts by the public, by individuals, by the courts, and by international bodies. Brave New World of Health is an important contribution to advancing that understanding."--Publisher's website.
Resumo:
The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Even following the advent of BIM, we continue to move from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behaviour-related issues which impact the adoption and utilization of new technologies. The fragmented and dispersed nature of the AEC sector, and the huge number of small organizations that comprise it, are a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.
Resumo:
An anonymous membership broadcast scheme is a method in which a sender broadcasts the secret identity of one out of a set of n receivers, in such a way that only the right receiver knows that he is the intended receiver, while the others can not determine any information about this identity (except that they know that they are not the intended ones). In a w-anonymous membership broadcast scheme no coalition of up to w receivers, not containing the selected receiver, is able to determine any information about the identity of the selected receiver. We present two new constructions of w-anonymous membership broadcast schemes. The first construction is based on error-correcting codes and we show that there exist schemes that allow a flexible choice of w while keeping the complexities for broadcast communication, user storage and required randomness polynomial in log n,. The second construction is based on the concept of collision-free arrays, which is introduced in this paper. The construction results in more flexible schemes, allowing trade-offs between different complexities.
Resumo:
Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.
Resumo:
Purposes: The first objective was to propose a new model representing the balance level of adults with intellectual and developmental disabilities (IDD) using Principal Components Analysis (PCA); and the second objective was to use the results from the PCA recorded by regression method to construct and validate summative scales of the standardized values of the index, which may be useful to facilitate a balance assessment in adults with IDD. Methods: A total of 801 individuals with IDD (509 males) mean 33.1±8.5 years old, were recruited from Special Olympic Games in Spain 2009 to 2012. The participants performed the following tests: the timed-stand test, the single leg stance test with open and closed eyes, the Functional Reach Test, the Expanded Timed-Get-up-and-Go Test. Data was analyzed using principal components analysis (PCA) with Oblimin rotation and Kaiser normalization. We examined the construct validity of our proposed two-factor model underlying balance for adults with IDD. The scores from PCA were recorded by regression method and were standardized. Results: The Component Plot and Rotated Space indicated that a two-factor solution (Dynamic and Static Balance components) was optimal. The PCA with direct Oblimin rotation revealed a satisfactory percentage of total variance explained by the two factors: 51.6 and 21.4%, respectively. The median score standardized for component dynamic and static of the balance index for adults with IDD is shown how references values. Conclusions: Our study may lead to improvements in the understanding and assessment of balance in adults with IDD. First, it confirms that a two-factor model may underlie the balance construct, and second, it provides an index that may be useful for identifying the balance level for adults with IDD.
Resumo:
As a vital component of construction professional services (CPS), construction management consultancy is in nature knowledge-intensive and client-tailored. Although recent studies have acknowledged the increasing role of this subsector of CPS in the attainment of sustainable construction, little attention has been given to the education and training of its main body, namely construction management consultants (CMCs). This study investigated the competence and knowledge structure of CMCs by taking China as an example. Using the methods of interview and questionnaire survey, three key competences of CMCs and the underpinned knowledge structure were identified. The identified competences are personnel quality, onsite practical skills, and continuing professional learning. Underpinned these competences are the knowledge structure composed of a number of disciplines including construction cost planning and control, civil engineering and construction, engineering contract and law, and construction project management. The research findings lay a solid foundation for future studies to probe into the role of construction management consultants in the area of sustainable construction.
Resumo:
Social media platforms, that foster user generated content, have altered the ways consumers search for product related information. Conducting online searches, reading product reviews, and comparing products ratings, is becoming a more common information seeking pathway. This research demonstrates that info-active consumers are becoming less reliant on information provided by retailers or manufacturers, hence marketing generated online content may have a reduced impact on their purchasing behaviour. The results of this study indicate that beyond traditional methods of segmenting consumers, in the online context, new classifications such as info-active and info-passive would be beneficial in digital marketing. This cross-sectional, mixed-methods study is based on 43 in-depth interviews and an online survey with 500 consumers from 30 countries.