132 resultados para Microstructure-final
Resumo:
This report is for one of the four Tasks of the CRC project ‘Regenerating Construction to Enhance Sustainability’. The report specifically addresses Task 2 ‘Design guidelines for delivering high quality indoor environments’.
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
This report presents the results of a study on indoor environment quality (IEQ) and occupant productivity in two buildings that are owned and Occupied by City of Melbourne, and located next to each other in Central Melbourne, Council House 1 (CH1) and Council House 2 (CH2). The impact of a range of relevant IEQ and other parameters on health, wellbeing and productivity of occupants is assessed. The before-and-after case study has demonstrated that the productivity of office building occupants can potentially be enhanced through good building design, and provision of a high quality, healthy, comfortable and functional interior environment, that takes account of basic occupant needs. It has shown that good indoor environment quality is a necessary pre-requisite for enhanced productivity in office buildings, but that broader aspects of overall building and interior design are also important.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.
Resumo:
The Your Building Project to build a website as the business and technical guide to sustainable commercial buildings has now been completed. The site is available at www.yourbuilding.org. The project was delivered to meet the requirements of the funding agreement between the Commonwealth of Australia represented by the Department of the Environment and Heritage (now Department of the Environment and Water Resources) and the Cooperative Research Centre for Construction Innovation (Construction Innovation).
Resumo:
This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.
Resumo:
This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Durability issues of reinforced concrete construction cost millions of dollars in repair or demolition. Identification of the causes of degradation and a prediction of service life based on experience, judgement and local knowledge has limitations in addressing all the associated issues. The objective of this CRC CI research project is to develop a tool that will assist in the interpretation of the symptoms of degradation of concrete structures, estimate residual capacity and recommend cost effective solutions. This report is a documentation of the research undertaken in connection with this project. The primary focus of this research is centred on the case studies provided by Queensland Department of Main Roads (QDMR) and Brisbane City Council (BCC). These organisations are endowed with the responsibility of managing a huge volume of bridge infrastructure in the state of Queensland, Australia. The main issue to be addressed in managing these structures is the deterioration of bridge stock leading to a reduction in service life. Other issues such as political backlash, public inconvenience, approach land acquisitions are crucial but are not within the scope of this project. It is to be noted that deterioration is accentuated by aggressive environments such as salt water, acidic or sodic soils. Carse, 2005, has noted that the road authorities need to invest their first dollars in understanding their local concretes and optimising the durability performance of structures and then look at potential remedial strategies.
Resumo:
Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal
Resumo:
This report focuses on risk-assessment practices in the private rental market, with particular consideration of their impact on low-income renters. It is based on the fieldwork undertaken in the second stage of the research process that followed completion of the Positioning Paper. The key research question this study addressed was: What are the various factors included in ‘risk-assessments’ by real estate agents in allocating ‘affordable’ tenancies? How are these risks quantified and managed? What are the key outcomes of their decision-making? The study builds on previous research demonstrating that a relatively large proportion of low-cost private rental accommodation is occupied by moderate- to high-income households (Wulff and Yates 2001; Seelig 2001; Yates et al. 2004). This is occurring in an environment where the private rental sector is now the de facto main provider of rental housing for lower-income households across Australia (Seelig et al. 2005) and where a number of factors are implicated in patterns of ‘income–rent mismatching’. These include ongoing shifts in public housing assistance; issues concerning eligibility for rent assistance; ‘supply’ factors, such as loss of low-cost rental stock through upgrading and/or transfer to owner-occupied housing; patterns of supply and demand driven largely by middle- to high-income owner-investors and renters; and patterns of housing need among low-income households for whom affordable housing is not appropriate. In formulating a way of approaching the analysis of ‘risk-assessment’ in rental housing management, this study has applied three sociological perspectives on risk: Beck’s (1992) formulation of risk society as entailing processes of ‘individualisation’; a socio-cultural perspective which emphasises the situated nature of perceptions of risk; and a perspective which has drawn attention to different modes of institutional governance of subjects, as ‘carriers of specific indicators of risk’. The private rental market was viewed as a social institution, and the research strategy was informed by ‘institutional ethnography’ as a method of enquiry. The study was based on interviews with property managers, real estate industry representatives, tenant advocates and community housing providers. The primary focus of inquiry was on ‘the moment of allocation’. Six local areas across metropolitan and regional Queensland, New South Wales, and South Australia were selected as case study localities. In terms of the main findings, it is evident that access to private rental housing is not just a matter of ‘supply and demand’. It is also about assessment of risk among applicants. Risk – perceived or actual – is thus a critical factor in deciding who gets housed, and how. Risk and its assessment matter in the context of housing provision and in the development of policy responses. The outcomes from this study also highlight a number of salient points: 1.There are two principal forms of risk associated with property management: financial risk and risk of litigation. 2. Certain tenant characteristics and/or circumstances – ability to pay and ability to care for the rented property – are the main factors focused on in assessing risk among applicants for rental housing. Signals of either ‘(in)ability to pay’ and/or ‘(in)ability to care for the property’ are almost always interpreted as markers of high levels of risk. 3. The processing of tenancy applications entails a complex and variable mix of formal and informal strategies of risk-assessment and allocation where sorting (out), ranking, discriminating and handing over characterise the process. 4. In the eyes of property managers, ‘suitable’ tenants can be conceptualised as those who are resourceful, reputable, competent, strategic and presentable. 5. Property managers clearly articulated concern about risks entailed in a number of characteristics or situations. Being on a low income was the principal and overarching factor which agents considered. Others included: - unemployment - ‘big’ families; sole parent families - domestic violence - marital breakdown - shift from home ownership to private rental - Aboriginality and specific ethnicities - physical incapacity - aspects of ‘presentation’. The financial vulnerability of applicants in these groups can be invoked, alongside expressed concerns about compromised capacities to manage income and/or ‘care for’ the property, as legitimate grounds for rejection or a lower ranking. 6. At the level of face-to-face interaction between the property manager and applicants, more intuitive assessments of risk based upon past experience or ‘gut feelings’ come into play. These judgements are interwoven with more systematic procedures of tenant selection. The findings suggest that considerable ‘risk’ is associated with low-income status, either directly or insofar as it is associated with other forms of perceived risk, and that such risks are likely to impede access to the professionally managed private rental market. Detailed analysis suggests that opportunities for access to housing by low-income householders also arise where, for example: - the ‘local experience’ of an agency and/or property manager works in favour of particular applicants - applicants can demonstrate available social support and financial guarantors - an applicant’s preference or need for longer-term rental is seen to provide a level of financial security for the landlord - applicants are prepared to agree to specific, more stringent conditions for inspection of properties and review of contracts - the particular circumstances and motivations of landlords lead them to consider a wider range of applicants - In particular circumstances, property managers are prepared to give special consideration to applicants who appear worthy, albeit ‘risky’. The strategic actions of demonstrating and documenting on the part of vulnerable (low-income) tenant applicants can improve their chances of being perceived as resourceful, capable and ‘savvy’. Such actions are significant because they help to persuade property managers not only that the applicant may have sufficient resources (personal and material) but that they accept that the onus is on themselves to show they are reputable, and that they have valued ‘competencies’ and understand ‘how the system works’. The parameters of the market do shape the processes of risk-assessment and, ultimately, the strategic relation of power between property manager and the tenant applicant. Low vacancy rates and limited supply of lower-cost rental stock, in all areas, mean that there are many more tenant applicants than available properties, creating a highly competitive environment for applicants. The fundamental problem of supply is an aspect of the market that severely limits the chances of access to appropriate and affordable housing for low-income rental housing applicants. There is recognition of the impact of this problem of supply. The study indicates three main directions for future focus in policy and program development: providing appropriate supports to tenants to access and sustain private rental housing, addressing issues of discrimination and privacy arising in the processes of selecting suitable tenants, and addressing problems of supply.
Resumo:
The neXus2 research project has sought to investigate the library and information services (LIS) workforce in Australia, from the institutional or employer perspective. The study builds on the neXus1 study, which collected data from individuals in the LIS workforce in order to present a snapshot of the profession in 2006, highlighting the demographics, educational background and career details of library and information professionals in Australia. To counterbalance this individual perspective, library institutions were invited to participate in a survey to contribute further data as employers. This final report on the neXus2 project compares the findings from the different library sectors, ie academic libraries, TAFE libraries, the National and State libraries, public libraries, special libraries and school libraries.