120 resultados para Improvement schedules


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the problem of appropriate load sharing in an autonomous microgrid. High gain angle droop control ensures proper load sharing, especially under weak system conditions. However it has a negative impact on overall stability. Frequency domain modeling, eigenvalue analysis and time domain simulations are used to demonstrate this conflict. A supplementary loop is proposed around a conventional droop control of each DG converter to stabilize the system while using high angle droop gains. Control loops are based on local power measurement and modulation of the d-axis voltage reference of each converter. Coordinated design of supplementary control loops for each DG is formulated as a parameter optimization problem and solved using an evolutionary technique. The sup-plementary droop control loop is shown to stabilize the system for a range of operating conditions while ensuring satisfactory load sharing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this paper is to take a first step in developing a theoretical framework describing the role of HRM in successful CI, based on the current literature from both fields. To this end, elements from the CI Maturity Model and a framework depicting the role of HRM in innovation serve as a foundation for examining how specific bundles of HRM practices utilised during different phases of the CI implementation process may contribute to sustained organisational and enhanced operational performance. The primary contribution of this paper is theoretical; however, the framework has practical value in that it suggests important relationships between HRM practices and behaviours necessary for successful CI. A preliminary test of the framework in an empirical setting is summarised at the conclusion of this paper, where a number of possible research avenues are also suggested.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To maintain or achieve competitiveness and profitability, a manufacturing firm or enterprise must respond to a range of challenges, including rapid improvements in technology; declining employment and output; globalisation of markets and environmental requirements. In addition, substantial changes in government policy have had important impacts in many countries, as have the increasing levels of global trade. Manufacturing enterprises need to have a clear understanding of what their customers want and why customers purchase their products rather than purchase from their competitors. They need to fully understand the aims of the business in terms of its customers, market segments, product attributes, geographical markets and performance. Continuous Improvement (CI) methods have become widely adopted and regarded as providing an important component of increased company competitiveness. This article examines the extent to which continuous improvement activities have contributed to the different areas of business performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to explore the role of cross-functional teams in the alignment between system effectiveness and operational effectiveness after the implementation of enterprise information systems (EIS). In addition, it aims to explore the contribution of cross-functional teams to improvement in operational performance. ---------- Design/methodology/approach: The research uses a combination of qualitative and quantitative methods, in a two-stage methodological approach, to investigate the influence of cross-functional teams on the alignment between system effectiveness and operational effectiveness and the impact of the stated alignment on the improvement in operational performance. ---------- Findings: Initial findings suggest that factors stemming from system effectiveness and the performance objectives stemming from operational effectiveness are important and significantly well correlated factors that promote the alignment between the effectiveness of technological implementation and the effectiveness of operations. In addition, confirmatory factor analysis has been used to find the structural relationships and provide explanations for the stated alignment and the contribution of cross-functional teams to the improvement in operational performance. ---------- Research limitations/implications: The principal limitation of this study is its small sample size. ---------- Practical implications: Cross-functional teams have been used by many organisations as a way of involving expertise from different functional areas in the implementation of innovative technologies. An appropriate use of the dimensions that emerged from this research, in the context of cross-functional teams, will assist organisations to properly utilise cross-functional teams with the aim of improving operational performance. ---------- Originality/value: The paper presents a new approach to measure the effectiveness of EIS implementation by adding new dimensions to measure it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Six Sigma provides a framework for quality improvement and business excellence. Introduced in the 1980s in manufacturing, the concept of Six Sigma has gained popularity in service organizations. After initial success in healthcare and banking, Six Sigma has gradually gained traction in other types of service industries, including hotels and lodging. Starwood Hotels and Resorts was the first hospitality giant to embrace Six Sigma. In 2001, Starwood adopted the method to develop innovative, customer-focused solutions and to transfer these solutions throughout the global organization. To analyze Starwood's use of Six Sigma, the authors collected data from articles, interviews, presentations and speeches published in magazines, newspapers and Web sites. This provided details to corroborate information, and they also made inferences from these sources. Financial metrics can explain the success of Six Sigma in any organization. There was no shortage of examples of Starwood's success resulting from Six Sigma project metrics uncovered during the research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the effects of thyristor controlled series compensator (TCSC), a series FACTS controller, on the transient stability of a power system. Trajectory sensitivity analysis (TSA) has been used to measure the transient stability condition of the system. The TCSC is modeled by a variable capacitor, the value of which changes with the firing angle. It is shown that TSA can be used in the design of the controller. The optimal locations of the TCSC-controller for different fault conditions can also be identified with the help of TSA. The paper depicts the advantage of the use of TCSC with a suitable controller over fixed capacitor operation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of an interline voltage controller (IVOLCON) to improve the power quality in a power distribution system is discussed. An IVOLCON consists of two shunt voltage source converters (VSCs) that are joined through a common dc bus. The VSCs are connected to two different feeders. The main aim of the IVOLCON is to control the PCC (Point of Common Coupling) bus voltages of the two feeders to pre-specified magnitudes. The phase angles of the PCC bus voltages are obtained such that the voltage across the common dc link remains constant. The structure, control and capability of the IVOLCON are described. The efficacy of the proposed configuration has been verified through simulation studies using PSCAD/EMTDC for voltage sags and feeder outage

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article our starting point is the current context of national curriculum change and intense speculation about the assessment, standards and reporting. It is written against a background of accountability measures and improvement imperatives, and focuses attention on standards as offering representations of quality. We understand standards to be constructs that aim to achieve public credibility and utility. Further, they can be examined for the purposes they seek to serve and also their expected functions. Fitness for purpose is therefore a useful notion in considering the nature of standards. Our interest in the discussion is the ‘fit’ between how standards are formulated and how they are used in practice, by whom and for what purposes. A related interest is in the matter of how standards can be harnessed to realise improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From the business viewpoint, the railway timetable is a list of the products presented by the railway transportation operators to the customers, specifying the schedules of all the train services on a railway line or network. In order to evaluate the quality of the train service schedules, a number of indices are proposed in this paper. These indices primarily take the passengers’ needs, such as waiting time, transfer time and transport capacity into consideration. Delay rate is usually used in post-evaluation. In this study, we propose to give an evaluation on the probability that the scheduled train services are likely to be delayed and the recovery ability of the timetable after delay has occurred. The evaluation identifies the possible problems in the services, such as excessive waiting time, non-seamless transfer, and high possibility of delay. This paper also discusses the improvement of these problems through certain adjustments on the timetable. The indices for evaluation and the adjustment method on timetable are then applied to a case study on the Hu-Ning-Hang railway in China, followed by the discussions of the merits of the proposed indices for timetable evaluation and possible improvement.