113 resultados para Illegal waste disposal
Resumo:
A system requiring a waste management license from an enforcement agency has been introduced in many countries. A license system is usually coupled with fines, a manifest, and a disposal tax. However, these policy devices have not been integrated into an optimal policy. In this paper we derive an optimal waste management policy by using those policy devices. Waste management policies are met with three difficult problems: asymmetric information, the heterogeneity of waste management firms, and non-compliance by waste management firms and waste disposers. The optimal policy in this paper overcomes all three problems.
Resumo:
Background The population exposed to potentially hazardous substances through inappropriate and unsafe management practices related to disposal and recycling of end-of-life electrical and electronic equipment, collectively known as e-waste, is increasing. We aimed to summarise the evidence for the association between such exposures and adverse health outcomes. Methods We systematically searched five electronic databases (PubMed, Embase, Web of Science, PsycNET, and CINAHL) for studies assessing the association between exposure to e-waste and outcomes related to mental health and neurodevelopment, physical health, education, and violence and criminal behaviour, from Jan 1, 1965, to Dec 17, 2012, and yielded 2274 records. Of the 165 full-text articles assessed for eligibility, we excluded a further 142, resulting in the inclusion of 23 published epidemiological studies that met the predetermined criteria. All studies were from southeast China. We assessed evidence of a causal association between exposure to e-waste and health outcomes within the Bradford Hill framework. Findings We recorded plausible outcomes associated with exposure to e-waste including change in thyroid function, changes in cellular expression and function, adverse neonatal outcomes, changes in temperament and behaviour, and decreased lung function. Boys aged 8–9 years living in an e-waste recycling town had a lower forced vital capacity than did those living in a control town. Significant negative correlations between blood chromium concentrations and forced vital capacity in children aged 11 and 13 years were also reported. Findings from most studies showed increases in spontaneous abortions, stillbirths, and premature births, and reduced birthweights and birth lengths associated with exposure to e-waste. People living in e-waste recycling towns or working in e-waste recycling had evidence of greater DNA damage than did those living in control towns. Studies of the effects of exposure to e-waste on thyroid function were not consistent. One study related exposure to e-waste and waste electrical and electronic equipment to educational outcomes. Interpretation Although data suggest that exposure to e-waste is harmful to health, more well designed epidemiological investigations in vulnerable populations, especially pregnant women and children, are needed to confirm these associations. Funding Children's Health and Environment Program, Queensland Children's Medical Research Institute, The University of Queensland, Australia.
Resumo:
Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.
Resumo:
Construction and demolition (C&D) waste have negative impacts on the environment. As a significant proportion of C&D waste is related to the design stage of a project, there is an opportunity for architects to reduce the waste. However, research suggests that many architects often do not understand the impact of their design on waste generation. Training and education are proposed by current researchers to improve architects’ knowledge; however, this has not been adequately validated as a viable approach to solving waste issues. This research investigates architects’ perceptions towards waste management in the design phase, and determines whether they feel they are adequately skilled in reducing C&D waste. Questionnaire surveys were distributed to architects from 98 architectural firms and 25 completed surveys were returned. The results show that while architects are aware of the relationship between design and waste, ‘extra time’ and ‘lack of knowledge’ are the key barriers to implementing waste reduction strategies. In addition, the majority of respondents acknowledge their lack of skill to reduce waste through design evaluation. Therefore, training programmes can be a viable strategy to enable them to address the pressing issue of C&D waste reduction.
Resumo:
Lead is present everywhere in the environment and has been defined as one of the greatest threats to the human health. In this paper, attempts have been made to study a way of recycling the lead produced from waste usage and disposed of in such a way as to avoid degrading the surrounding environment. In order to contain the waste, recycled asphalt material is mixed with the lead and then heated with microwave energy. This is an attempt to solidify and reduce the lead contaminants and use the final product as sub-base material in road pavement construction. The microwave heating of the specimens is carried out with 30%, 50%, 80% and 100% of power at 800W. The optimum power mode is used to compare with the conventional heating of asphalt with sulfur additive. The results are characterized by compact density, permeability, and subjected to toxicity test with regards to lead concentration. A mechanical test to evaluate the stability is also performed on the three methods of solidification and to prove that microwave zapping method allow to convert into an environmentally stable material for recycling without having to be deposited in a landfill site.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Psychological and social correlates of attrition in a longitudinal study of hazardous waste exposure
Resumo:
Illegal pedestrian behaviour is common and is reported as a factor in many pedestrian crashes. Since walking is being promoted for its health and environmental benefits, minimisation of its associated risks is of interest. The risk associated with illegal road crossing is unclear, and better information would assist in setting a rationale for enforcement and priorities for public education. An observation survey of pedestrian behaviour was conducted at signalised intersections in the Brisbane CBD (Queensland, Australia) on typical workdays, using behavioural categories that were identifiable in police crash reports. The survey confirmed high levels of crossing against the lights, or close enough to the lights that they should legally have been used. Measures of exposure for crossing legally, against the lights, and close to the lights were generated by weighting the observation data. Relative risk ratios were calculated for these categories using crash data from the observation sites and adjacent midblocks. Crossing against the lights and crossing close to the lights both exhibited a crash risk per crossing event approximately eight times that of legal crossing at signalised intersections. The implications of these results for enforcement and education are discussed, along with the limitations of the study.
Resumo:
Sewage and its microbiology, treatment and disposal are important to the topic of Antarctic wildlife health because disposal of untreated sewage effluent into the Antarctic marine environment is both allowed and commonplace. Human sewage contains enteric bacteria as normal flora, and has the potential to contain parasites, bacteria and viruses which may prove pathogenic to Antarctic wildlife. Treatment can reduce levels of micro-organisms in sewage effluent, but is not a requirement of the Environmental Protocol to the Antarctic Treaty (the Madrid Protocol). In contrast, the deliberate release of non-native organisms for any other reason is prohibited. Hence, disposal of sewage effluent to the marine environment is the only activity routinely undertaken in Antarctica knowing that it will likely result in the release of large numbers of potentially non-native species. When the Madrid Protocol was negotiated, the decision to allow release of untreated sewage effluent was considered the only pragmatic option, as a prohibition would have been costly, and may not have been achievable by many Antarctic operators. In addition, at that time the potential for transmission of pathogens to wildlife from sewage was not emphasised as a significant potential risk. Since then, the transmission of disease-causing agents between species is more widely recognised and it is now timely to consider the risks of continued discharge of sewage effluent in Antarctica and whether there are practical alternatives.
Resumo:
It has long been recognised that government and public sector services suffer an innovation deficit compared to private or market-based services. This paper argues that this can be explained as an unintended consequence of the concerted public sector drive toward the elimination of waste through efficiency, accountability and transparency. Yet in an evolving economy this can be a false efficiency, as it also eliminates the 'good waste' that is a necessary cost of experimentation. This results in a systematic trade0off in the public sector between the static efficiency of minimizing the misuse of public resources and the dynamic efficiency of experimentation. this is inherently biased against risk and uncertainty and therein, explains why governments find service innovation so difficult. In the drive to eliminate static inefficiencies, many political systems have susequently overshot and stifled policy innovation. I propose the 'Red Queen' solution of adaptive economic policy.