168 resultados para Exploit the images in the building


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As buildings have become more advanced and complex, our ability to understand how they are operated and managed has diminished. Modern technologies have given us systems to look after us but it appears to have taken away our say in how we like our environment to be managed. The aim of this paper is to discuss our research concerning spaces that are sensitive to changing needs and allow building-users to have a certain level of freedom to understand and control their environment. We discuss why, what we call the Active Layer, is needed in modern buildings; how building inhabitants are to interact with it; and the development of interface prototypes to test consequences of having the Active Layer in our environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article outlines the knowledge and skills students develop when they engage in digital media production and analysis in school settings. The metaphor of ‘digital building blocks’ is used to describe the material practices, conceptual understandings and production of knowledge that lead to the development of digital media literacy. The article argues that the two established approaches to media literacy education, critical reading and media production, do not adequately explain how students develop media knowledge. It suggests there has been too little focus on material practices and how these relate to the development of conceptual understanding in media learning. The article explores empirical evidence from a four-year investigation in a primary school in Queensland, Australia using actor–network theory to explore ‘moments of translation’ as students deploy technologies and concepts to materially participate in digital culture. A generative model of media learning is presented with four categories of building blocks that isolate the specific skills and knowledge that can be taught and learnt to promote participation in digital media contexts: digital materials, conceptual understandings, media production and media analysis. The final section of the article makes initial comments on how the model might become the basis for curriculum development in schools and argues that further empirical research needs to occur to confirm the model’s utility.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design of high-rise building is more often dictated by its serviceability rather than strength. Structural Engineers are always striving to overcome challenges of controlling lateral deflection and storey drifts as well as self weight of structure imposed on foundation. One of the most effective techniques is the use of outrigger and belt truss system in Composite structures that can astutely solve the above two issues in High-rise constructions. This paper investigates deflection control by effective utilisation of belt truss and outrigger system on a 60-storey composite building subjected to wind loads. A three dimensional Finite Element Analysis is performed with one, two and three outrigger levels. The reductions in deflection are 34 percent, 42 percent and 51 percent respectively as compared to a model without any outrigger system. There is an appreciable decline in the storey drifts with the introduction of these stiffer arrangements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National and international competition demands that Australian organisations become more competent at making the strategic technological decisions that impact their future in the international business economy. A new subject unit, Management of Technology is now offered in the popular Master of Project Management and Master of Business Administration programs at the Queensland University of Technology. This cross-disciplinary subject provides students with a theoretical foundation and practical tools to improve the efficiency and competitiveness of technically-oriented organisations. Applied case studies—shown to be the most appropriate mode of learning for mature-age students—form an integral component of the teaching program. In the first offerings of this subject during 1995 and 1996, American case studies were used. QUT has now supported the development of Australian case study packages for technology management through its Teaching and Learning Grants Scheme. The first case developed—Inland Oil Refiners’ Microstill Project—was completed in early 1996. A newly developed case—Automated Door Opening System for Wheelchair Access—is currently being completed. This case (comprising case study documentation and video presentation) tracks a cross-disciplinary product development driven by legislative and community pressures. It also reinforces the importance of personal relationships in the technology and business development that has taken this young Brisbane-based company from its embryonic beginnings on the Queensland Cultural Centre in 1994 to a national and export-focussed organisation in 1997. This paper reviews the need to develop Australian case material in Management of Technology, discusses the case study documentation and supporting video developed, and application of the case study approach in this teaching initiative in QUT’s Master of Project Management and Master of Business Administration programs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Malaysia, Industrialised Building Systems (IBS) are being promoted as a potential to enhance sustainability by the building industry and government. Known elsewhere as prefabricated construction, IBS employs a combination of ready-made components in the construction of buildings that promote quality of production, enhance simplification of construction processes and minimise on-site work. The components are manufactured in a factory either on or off site. They are then positioned and assembled into building structures. The unique characteristic of IBS has the potential to respond well to the sustainability challenge facing the construction industry. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications and some of the rating schemes fail to assess IBS towards sustainability deliverables. A holistic approach to improving IBS implementation is necessary to consider sustainability perceptions on IBS among key stakeholders. As IBS design is one of the most important development phases to incorporate sustainability requirements and expectations, a framework of embedding sustainability factors into IBS design is being developed through research. This paper presents an improved IBS design process focused on sustainability, showing where and how sustainability should be assessed to improve IBS construction. The framework being developed can provide guidance and decision making assistance to not only design consultants but all relevant stakeholders by integrating sustainability concepts into IBS applications. Outcome of the research will also provide a benchmark for developing countries in adopting prefabricated construction systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports on a current case study of green building initiatives implemented by the Western Australian government in the past decade. The intent is to provide a qualitative understanding of past R&D investments in the Australian built environment. The case method was selected to illustrate three sector-based investments, one of which is reported on here. The conceptual framework underpinning interview design and data analysis uses dynamic capability, absorptive capacity and open innovation theories to better understand the organisational environment in which these initiatives were implemented. Data has been thematically coded to criteria identified from the literature to illustrate organisational characteristics which may have contributed to dissemination and impact. The results will be combined with two further case studies (construction safety and digital modelling), to inform this research. This industry supported project will conclude by developing policy guidelines for future R&D investment in the built environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – This paper presents findings of a research study aimed at identifying critical sustainability factors for improved implementation of Industrialised Building Systems (IBS). It also highlights the importance of decision support, through the establishment of decision making guidelines, for sustainability deliverables in IBS development. Design/methodology/approach – A broad range of sustainability factors, as perceived by researchers and practitioners, are identified through a comprehensive literature study. A study of the survey and statistical data analysis is conducted to examine the criticality of these sustainability factors in IBS implementation. Findings – 18 sustainability factors are identified as critical to IBS implementation. Their interrelationships and driving forces are explored, which leads to the development of a conceptual model to map these factors for actions or potential solutions. The work provides a sound basis towards a set of decision making guidelines for sustainable IBS implementation. Originality/value – Compared with previous studies that focus on technical or economical aspects, this study extends existing knowledge on construction prefabrication by linking all aspects of sustainability issues with the design process. It also covers industry characteristics of developing countries, as represented by Malaysia’s scenarios.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.