584 resultados para Complex problems


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Generation Workshop Program 2010, a part of the Queensland Government Unlimited: Designing for the Asia Pacific Event Program, consisted of two one-day intensive design thinking workshops run on October 7-8, 2011 at The Edge, State Library of Queensland, for 100 senior secondary students and 20 secondary teachers self-selected from the subject areas of Visual Art, Graphics and Industrial Technology and Design. Participants were drawn from a database of Brisbane and regional Queensland private and public schools from the goDesign and Living City Workshop Programs. The workshop aimed to facilitate awareness in young people of the role of design in society and the value of design thinking skills in solving complex problems facing the Asia Pacific Region, and to inspire the generation of strategies for our future cities. It also aimed to encourage the collaboration of professional designers with secondary schools to inspire post-secondary pathways and idea generation for education. Inspired by international and national speakers Bunker Roy (Barefoot College) and Hael Kobayashi (Associate Producer on "Happy Feet" film for Australia's Animal Logic), the Unlimited showcase exhibition Make Change: Design Thinking in Action and ‘Idea Starters’/teaching resources provided, students worked with a teacher in ten random teams, to generate optimistic strategies for the Ideal City of tomorrow, each considering a theme – Food, Water, Transport, Ageing, Growth, Employment, Shelter, Health, Education and Energy. Each team of 6 was led by a professional designer (from the discipline of architecture, interior design, industrial design, urban design, graphic design or landscape architecture) who was a catalyst for driving the student creative thinking process. Assisted by illustrators, the teams prepared a visual presentation of their idea from art materials provided. The workshop culminated in a video-taped interactive design chatter to the larger group, which will be utilised as a toolkit and praxis for teachers as part of the State Library of Queensland Design Minds Project. Photos of student design work were published on the Unlimited website.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper aims to clarify the foundations of the discipline of project management (PM). Historically, PM has evolved from a conceptual approach based on a positivist paradigm. The author questions the appropriateness of such foundations for the kind of project management which claims to deal with complex problems. To answer this question, a brief history of project management emphasizes key concepts useful to the discussion. Comprehensive definitions of knowledge, competencies, performance and knowledge management are reviewed to provide a better understanding of the project environment in terms of its present positivist epistemological position. This paper explores the tensions and paradoxes encountered in PM practice, when set within the boundaries of a normative approach; it also highlights the polysemic nature of PM, for which an extended framework is proposed. Dialectic, qualitative and interpretative aspects of PM are presented alongside its quantitative body of Knowledge. The author finally introduces an innovative overview of project management, set in the greater context of the learning organization. Implications and applications of this perspective are discussed and lead to the presentation of the MAP metamethod, a systemic practical approach.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Organisations within the not-for-profit sector provide services to individuals and groups government and for-profit organisations cannot or will not consider. This response by the not-for-profit sector to market failure and government failure is a well understood contribution to society by the nonprofit sector. Over time, this response has resulted in the development of a vibrant and rich agglomeration of services and programs that operate under a myriad of philosophical stances, service orientations, client groupings and operational capacities. In Australia, these organisations and services provide social support and service assistance to many people in the community; often targeting their assistance to clients facing the most difficult of clients with complex problems. Initially, in undertaking this role, the not-for-profit sector received limited sponsorship from government, relying on primarily on public donations to fund the delivery of services. (Lyons 2001). Over time governments assumed greater responsibility in the form of service grants to particular groups: ‘the worthy poor’. More recently, government has engaged in widespread procurement of services from the not-for-profit sector, which specify the nature of the outcomes to be achieved and, to a degree, the way in which the services will be provided. A consequence of this growing shift to a more marketised model of service contracting, often offered-up under the label of enhanced collaborative practice, has been increased competitiveness between agencies that had previously worked well together (Keast and Brown, 2006). One of the challenges which emerge from the procurement of services by government from third sector organisations is that public values such as effectiveness, efficiency, transparency and professionalism can be neglected (Jørgensen and Bozeman 2002), although this is not always the case (Brown, Furneaux and Gudmundsson 2012). While some approaches to the examination of social procurement - the intentional purchasing of social outcomes (Furneaux and Barraket 2011) - assumes that public values are lost in social procurement arrangements (Bozeman 2002; Jørgensen and Bozeman 2002), alternative approach suggest such inevitability is not the case. Instead, social procurement is seen to involve a set of tensions (Brown, Potoski and Slyke 2006) or a set of trade offs (Charles et al. 2007), which must be managed, and through such management, public values can be potentially safeguarded (Bruin and Dicke 2006). The potential trade-offs of public values in social procurement is an area in need of further research, and one which carries both theoretical and practical significance. Additionally, the juxtaposition of policies – horizontal integration and vertical efficiency – results in a complex, crowded and contested policy and practice environment (Keast et al., 2007),, with the potential for set of unintentional consequences arising from these arrangements. Further the involvement of for-profit, non-profit, and hybrid organisations such as social enterprises, adds further complexity in the number of different organisational forms engaged in service delivery on behalf of government. To address this issue, this paper uses information gleaned from a state-wide survey of not-for-profit organisations in Queensland, Australia which included within its focus organisational size, operational scope, funding arrangements and governance/management approaches. Supplementing this information is qualitative data derived from 17 focus groups and 120 interviews conducted over ten years of study of this sector. The findings contribute to greater understanding of the practice and theory of the future provision of social services.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Fractional differential equation is used to describe a fractal model of mobile/immobile transport with a power law memory function. This equation is the limiting equation that governs continuous time random walks with heavy tailed random waiting times. In this paper, we firstly propose a finite difference method to discretize the time variable and obtain a semi-discrete scheme. Then we discuss its stability and convergence. Secondly we consider a meshless method based on radial basis functions (RBF) to discretize the space variable. By contrast to conventional FDM and FEM, the meshless method is demonstrated to have distinct advantages: calculations can be performed independent of a mesh, it is more accurate and it can be used to solve complex problems. Finally the convergence order is verified from a numerical example is presented to describe the fractal model of mobile/immobile transport process with different problem domains. The numerical results indicate that the present meshless approach is very effective for modeling and simulating of fractional differential equations, and it has good potential in development of a robust simulation tool for problems in engineering and science that are governed by various types of fractional differential equations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Information Technology (IT) education is in crisis. Enrolments have dropped by up to as much as 70% at some universities (Markoff, 2009). This coupled with traditionally high attrition and failure rates (Biggers et al, 2008) is resulting in the number of graduates nationwide being far lower than industry demand (Queensland Government SkillsInfo Report, 2009). This work reports on a radical redesign of the Bachelor of IT degree at QUT. The initial results are very promising with attrition in first year dropping from being one of the highest at QUT for an undergraduate degree to being one of the lowest. The redesign followed an action research model to reflect on issues and problems with the previous version of the degree and to introduce changes to attempt to rectify some of these problems. The resulting degree intends to produce "business savvy" graduates who are capable of using their IT knowledge and skills within cross-functional teams to solve complex problems.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Airports and cities inevitably recognise the value that each brings the other; however, the separation in decision-making authority for what to build, where, when and how provides a conundrum for both parties. Airports often want a say in what is developed outside of the airport fence, and cities often want a say in what is developed inside the airport fence. Defining how much of a say airports and cities have in decisions beyond their jurisdictional control is likely to be a topic that continues so long as airports and cities maintain separate formal decision-making processes for what to build, where, when and how. However, the recent Green and White Papers for a new National Aviation Policy have made early inroads to formalising relationships between Australia’s major airports and their host cities. At present, no clear indication (within practice or literature) is evident to the appropriateness of different governance arrangements for decisions to develop in situations that bring together the opposing strategic interests of airports and cities; thus leaving decisions for infrastructure development as complex decision-making spaces that hold airport and city/regional interests at stake. The line of enquiry is motivated by a lack of empirical research on networked decision-making domains outside of the realm of institutional theorists (Agranoff & McGuire, 2001; Provan, Fish & Sydow, 2007). That is, governance literature has remained focused towards abstract conceptualisations of organisation, without focusing on the minutia of how organisation influences action in real-world applications. A recent study by Black (2008) has provided an initial foothold for governance researchers into networked decision-making domains. This study builds upon Black’s (2008) work by aiming to explore and understand the problem space of making decisions subjected to complex jurisdictional and relational interdependencies. That is, the research examines the formal and informal structures, relationships, and forums that operationalise debates and interactions between decision-making actors as they vie for influence over deciding what to build, where, when and how in airport-proximal development projects. The research mobilises a mixture of qualitative and quantitative methods to examine three embedded cases of airport-proximal development from a network governance perspective. Findings from the research provide a new understanding to the ways in which informal actor networks underpin and combine with formal decision-making networks to create new (or realigned) governance spaces that facilitate decision-making during complex phases of development planning. The research is timely, and responds well to Isett, Mergel, LeRoux, Mischen and Rethemeyer’s (2011) recent critique of limitations within current network governance literature, specifically to their noted absence of empirical studies that acknowledge and interrogate the simultaneity of formal and informal network structures within network governance arrangements (Isett et al., 2011, pp. 162-166). The combination of social network analysis (SNA) techniques and thematic enquiry has enabled findings to document and interpret the ways in which decision-making actors organise to overcome complex problems for planning infrastructure. An innovative approach to using association networks has been used to provide insights to the importance of the different ways actors interact with one another, thus providing a simple yet valuable addition to the increasingly popular discipline of SNA. The research also identifies when and how different types of networks (i.e. formal and informal) are able to overcome currently known limitations to network governance (see McGuire & Agranoff, 2011), thus adding depth to the emerging body of network governance literature surrounding limitations to network ways of working (i.e. Rhodes, 1997a; Keast & Brown, 2002; Rethemeyer & Hatmaker, 2008; McGuire & Agranoff, 2011). Contributions are made to practice via the provision of a timely understanding of how horizontal fora between airports and their regions are used, particularly in the context of how they reframe the governance of decision-making for airport-proximal infrastructure development. This new understanding will enable government and industry actors to better understand the structural impacts of governance arrangements before they design or adopt them, particularly for factors such as efficiency of information, oversight, and responsiveness to change.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Bayesian networks (BNs) provide a statistical modelling framework which is ideally suited for modelling the many factors and components of complex problems such as healthcare-acquired infections. The methicillin-resistant Staphylococcus aureus (MRSA) organism is particularly troublesome since it is resistant to standard treatments for Staph infections. Overcrowding and understa�ng are believed to increase infection transmission rates and also to inhibit the effectiveness of disease control measures. Clearly the mechanisms behind MRSA transmission and containment are very complicated and control strategies may only be e�ective when used in combination. BNs are growing in popularity in general and in medical sciences in particular. A recent Current Content search of the number of published BN journal articles showed a fi�ve fold increase in general and a six fold increase in medical and veterinary science from 2000 to 2009. This chapter introduces the reader to Bayesian network (BN) modelling and an iterative modelling approach to build and test the BN created to investigate the possible role of high bed occupancy on transmission of MRSA while simultaneously taking into account other risk factors.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A fractional differential equation is used to describe a fractal model of mobile/immobile transport with a power law memory function. This equation is the limiting equation that governs continuous time random walks with heavy tailed random waiting times. In this paper, we firstly propose a finite difference method to discretize the time variable and obtain a semi-discrete scheme. Then we discuss its stability and convergence. Secondly we consider a meshless method based on radial basis functions (RBFs) to discretize the space variable. In contrast to conventional FDM and FEM, the meshless method is demonstrated to have distinct advantages: calculations can be performed independent of a mesh, it is more accurate and it can be used to solve complex problems. Finally the convergence order is verified from a numerical example which is presented to describe a fractal model of mobile/immobile transport process with different problem domains. The numerical results indicate that the present meshless approach is very effective for modeling and simulating fractional differential equations, and it has good potential in the development of a robust simulation tool for problems in engineering and science that are governed by various types of fractional differential equations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A control allocation system implements a function that maps the desired control forces generated by the vehicle motion controller into the commands of the different actuators. In this article, a survey of control allocation methods for over-actuated underwater vehicles is presented. The methods are applicable for both surface vessels and underwater vehicles. The paper presents a survey of control allocation methods with focus on mathematical representation and solvability of thruster allocation problems. The paper is useful for university students and engineers who want to get an overview of state-of-the art control allocation methods as well as advance methods to solve more complex problems.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Increasingly, the not-for-profit sector, as an emerging contributor to the creative economy, is creating a context for engaging creative practitioners in developing solutions to complex problems, triggering a demand for skills and knowledge needed to address this complexity. Across the university and community contexts alternative models of engagement are emerging to support this dynamic. This paper presents a case study of a creative project in which a value-based approach is used to foster a collaborative partnership between community partners and a multidisciplinary team of final year Creative Industries students who in the course of the project developed a range of communication resources, including a social media campaign, an interactive game and a series of short films to support volunteer engagement and leadership initiatives. The paper considers the implications this values approach has for the design of service learning curriculum for multidisciplinary creative teams and the potential it has to support meaningful collaboration between creatives and the not-for-profit sector. It further explores how it impact on student and partner engagement, learning outcomes and the benefits for the partner organisation. The paper concludes that a value-based approach to university-community engagement has the potential to support and enable a greater degree of reciprocity, deeper engagement between stakeholders and greater relevance of the final outcome.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Maintenance decisions for large-scale asset systems are often beyond an asset manager's capacity to handle. The presence of a number of possibly conflicting decision criteria, the large number of possible maintenance policies, and the reality of budget constraints often produce complex problems, where the underlying trade-offs are not apparent to the asset manager. This paper presents the decision support tool "JOB" (Justification and Optimisation of Budgets), which has been designed to help asset managers of large systems assess, select, interpret and optimise the effects of their maintenance policies in the presence of limited budgets. This decision support capability is realized through an efficient, scalable backtracking- based algorithm for the optimisation of maintenance policies, while enabling the user to view a number of solutions near this optimum and explore tradeoffs with other decision criteria. To assist the asset manager in selecting between various policies, JOB also provides the capability of Multiple Criteria Decision Making. In this paper, the JOB tool is presented and its applicability for the maintenance of a complex power plant system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As government and industry grapple with 21st century challenges, building the capacity to look at complex problems through fresh eyes is critical.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Engineers and asset managers must often make decisions on how to best allocate limited resources amongst different interrelated activities, including repair, renewal, inspection, and procurement of new assets. The presence of project interdependencies and the lack of sufficient information on the true value of an activity often produce complex problems and leave the decision maker guessing about the quality and robustness of their decision. In this paper, a decision support framework for uncertain interrelated activities is presented. The framework employs a methodology for multi-criteria ranking in the presence of uncertainty, detailing the effect that uncertain valuations may have on the priority of a particular activity. The framework employs employing semi-quantitative risk measures that can be tailored to an organisation and enable a transparent and simple-to-use uncertainty specification by the decision maker. The framework is then demonstrated on a real world project set from a major Australian utility provider.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This new work provides a comprehensive and theoretically rich discussion of the law on cross-border insolvency. It engages with several current multi-billion dollar insolvencies such as those of Nortel Networks and Lehman Brothers to provide the reader with state of the art knowledge of the complex problems posed by transnational insolvency. As the number of transnational insolvencies grows due to prevailing economic conditions, practitioners are increasingly required to navigate the mass of legal rules applicable to cross-border insolvency situations. The associated challenges are heightened by the diversity of legal structures employed by modern business entities and a patchwork of costly, inefficient, and unpredictable national legal rules. The response has been a proliferation of international legal instruments such as the UNCITRAL Model Law and the the EU Insolvency Regulation, supplemented by judicial practice, adding further layers of complexity. Writing from an Australian perspective, the authors analyse this network of legal rules and subsequent case law. In addition, they explain the theoretical underpinnings of these rules in an accessible manner to build a solid foundation for practice, facilitate advanced reasoning, and enable the development of sophisticated arguments for law reform. Comparative case law from jurisdictions such as the United States and United Kingdom is also included. This book is highly relevant to insolvency practitioners faced with the recovery of assets located in different jurisdictions, transactional lawyers for whom knowledge of potential insolvency pitfalls is essential, and academics. It is invaluable for students at both undergraduate and postgraduate level seeking a sound understanding of this challenging area of law.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Public dialogue regarding the high concentration of drug use and crime in inner city locations is frequently legitimised through visibility of drug-using populations and a perception of high crime rates. The public space known as the Brunswick Street Mall (Valley mall), located in the inner city Brisbane suburb of Fortitude Valley, has long provided the focal point for discussions regarding the problem of illicit drug use and antisocial behaviour in Brisbane. During the late 1990s a range of stakeholders in Fortitude Valley became mobilised to tackle crime and illicit drugs. In particular they wanted to dismantle popular perceptions of the area as representing the dark and unsafe side of Brisbane. The aim of this campaign was to instil a sense of safety in the area and dislodge Fortitude Valley from its reputation as a =symbolic location of danger‘. This thesis is a case study about an urban site that became contested by the diverse aims of a range of stakeholders who were invested in an urban renewal program and community safety project. This case study makes visible a number of actors that were lured from their existing roles in an indeterminable number of heterogeneous networks in order to create a community safety network. The following analysis of the community safety network emphasises some specific actors: history, ideas, technologies, materialities and displacements. The case study relies on the work of Foucault, Latour, Callon and Law to draw out the rationalities, background contingencies and the attempts to impose order and translate a number of entities into the community safety project in Fortitude Valley. The results of this research show that the community safety project is a case of ontological politics. Specifically the data indicates that both the (reality) problem of safety and the (knowledge) solution to safety were created simultaneously. This thesis explores the idea that while violence continues to occur in the Valley, evidence that community safety got done is located through mapping its displacement and eventual disappearance. As such, this thesis argues that community safety is a =collateral reality‘.