18 resultados para Cometas-1680
Resumo:
When a community already torn by a prolonged war is subsequently subjected to being hit by a natural disaster, the combined impact of such disasters can be extremely devastating. Affected communities often face enormous challenges during the long-term reconstruction, mainly due to the lack of a viable community involvement process. In post-war settings, affected communities are often conceived as being disabled and are hardly ever consulted when reconstruction projects are instigated. This lack of community involvement often leads to poor project planning, decreased community support and an unsustainable completed project. The impact of war, coupled with the tensions created by the poor housing provisions, often hinder the affected residents from integrating permanently into their home communities. This paper identifies a number of fundamental factors that act as barriers to community participation in reconstruction projects. The paper is based on a statistical analysis of a questionnaire survey administered in 2012 in Afghanistan.
Resumo:
Developing major infrastructure and construction (MIC) projects is complicated, since it involves multifaceted policy issues. As a result, appropriate participatory mechanisms have been increasingly employed to improve the legitimacy of the project decision process. Yet it cannot always guarantee a mutually acceptable solution since the expectations and requirements of multiple stakeholders involved can be diverse and even conflicting. Overcoming this necessitates a thorough identification and careful analysis of the expectations of various stakeholder groups in MIC projects. On the other hand, though most project stakeholder concerns are consistent across the globe, contextual differences may lead to diverse priority levels being attached to these factors. This research, therefore, aimed to examine the perceptual differences between paired stakeholder groups from mainland China mega-cities and Hong Kong in rating their concerns over MIC projects. The research findings are expected to benefit both the Central Government of China and the Government of Hong Kong SAR for coping better with the rapid expansion of MIC projects in the territory and the increasing expectations of social equality, and therefore achieving the much desired harmonious development of the community.
Resumo:
Construction and demolition (C&D) waste have negative impacts on the environment. As a significant proportion of C&D waste is related to the design stage of a project, there is an opportunity for architects to reduce the waste. However, research suggests that many architects often do not understand the impact of their design on waste generation. Training and education are proposed by current researchers to improve architects’ knowledge; however, this has not been adequately validated as a viable approach to solving waste issues. This research investigates architects’ perceptions towards waste management in the design phase, and determines whether they feel they are adequately skilled in reducing C&D waste. Questionnaire surveys were distributed to architects from 98 architectural firms and 25 completed surveys were returned. The results show that while architects are aware of the relationship between design and waste, ‘extra time’ and ‘lack of knowledge’ are the key barriers to implementing waste reduction strategies. In addition, the majority of respondents acknowledge their lack of skill to reduce waste through design evaluation. Therefore, training programmes can be a viable strategy to enable them to address the pressing issue of C&D waste reduction.