410 resultados para Choosing bus
Resumo:
The common approach to estimate bus dwell time at a BRT station platform is to apply the traditional dwell time methodology derived for suburban bus stops. Current dwell time models are sensitive towards bus type, fare collection policy along with the number of boarding and alighting passengers. However, they fall short in accounting for the effects of passenger/s walking on a relatively longer BRT station platform. Analysis presented in this paper shows that the average walking time of a passenger at BRT platform is 10 times more than that of bus stop. The requirement of walking to the bus entry door at the BRT station platform may lead to the bus experiencing a higher dwell time. This paper presents a theory for a BRT network which explains the loss of station capacity during peak period operation. It also highlights shortcomings of present available bus dwell time models suggested for the analysis of BRT operation.
Resumo:
IEC 61850 Process Bus technology has the potential to improve cost, performance and reliability of substation design. Substantial costs associated with copper wiring (designing, documentation, construction, commissioning and troubleshooting) can be reduced with the application of digital Process Bus technology, especially those based upon international standards. An IEC 61850-9-2 based sampled value Process Bus is an enabling technology for the application of Non-Conventional Instrument Transformers (NCIT). Retaining the output of the NCIT in its native digital form, rather than conversion to an analogue output, allows for improved transient performance, dynamic range, safety, reliability and reduced cost. In this paper we report on a pilot installation using NCITs communicating across a switched Ethernet network using the UCAIug Implementation Guideline for IEC 61850-9-2 (9-2 Light Edition or 9-2LE). This system was commissioned in a 275 kV Line Reactor bay at Powerlink Queensland’s Braemar substation in 2009, with sampled value protection IEDs 'shadowing' the existing protection system. The results of commissioning tests and twelve months of service experience using a Fibre Optic Current Transformer (FOCT) from Smart Digital Optics (SDO) are presented, including the response of the system to fault conditions. A number of remaining issues to be resolved to enable wide-scale deployment of NCITs and IEC 61850-9-2 Process Bus technology are also discussed.
Resumo:
Bus Rapid Transit (BRT), because of its operational flexibility and simplicity, is rapidly gaining popularity with urban designers and transit planners. Earlier BRTs were bus shared lane or bus only lane, which share the roadway with general and other forms of traffic. In recent time, more sophisticated designs of BRT have emerged, such as busway, which has separate carriageway for buses and provides very high physical separation of buses from general traffic. Line capacities of a busway are predominately dependent on bus capacity of its stations. Despite new developments in BRT designs, the methodology of capacity analysis is still based on traditional principles of kerbside bus stop on bus only lane operations. Consequently, the tradition methodology lacks accounting for various dimensions of busway station operation, such as passenger crowd, passenger walking and bus lost time along the long busway station platform. This research has developed a purpose made bus capacity analysis methodology for busway station analysis. Extensive observations of kerbside bus stops and busway stations in Brisbane, Australia were made and differences in their operation were studied. A large scale data collection was conducted using the video recording technique at the Mater Hill Busway Station on the South East Busway in Brisbane. This research identified new parameters concerning busway station operation, and through intricate analysis identified the elements and processes which influence the bus dwell time at a busway station platform. A new variable, Bus lost time, was defined and its quantitative descriptions were established. Based on these finding and analysis, a busway station platform bus capacity methodology was developed, comprising of new models for busway station lost time, busway station dwell time, busway station loading area bus capacity, and busway station platform bus capacity. The new methodology not only accounts for passenger boarding and alighting, but also covers platform crowd and bus lost time in station platform bus capacity estimation. The applicability of this methodology was shown through demonstrative examples. Additionally, these examples illustrated the significance of the bus lost time variable in determining station capacities.
Resumo:
Ethernet is a key component of the standards used for digital process buses in transmission substations, namely IEC 61850 and IEEE Std 1588-2008 (PTPv2). These standards use multicast Ethernet frames that can be processed by more than one device. This presents some significant engineering challenges when implementing a sampled value process bus due to the large amount of network traffic. A system of network traffic segregation using a combination of Virtual LAN (VLAN) and multicast address filtering using managed Ethernet switches is presented. This includes VLAN prioritisation of traffic classes such as the IEC 61850 protocols GOOSE, MMS and sampled values (SV), and other protocols like PTPv2. Multicast address filtering is used to limit SV/GOOSE traffic to defined subsets of subscribers. A method to map substation plant reference designations to multicast address ranges is proposed that enables engineers to determine the type of traffic and location of the source by inspecting the destination address. This method and the proposed filtering strategy simplifies future changes to the prioritisation of network traffic, and is applicable to both process bus and station bus applications.
Resumo:
This work examines the effect of landmark placement on the efficiency and accuracy of risk-bounded searches over probabilistic costmaps for mobile robot path planning. In previous work, risk-bounded searches were shown to offer in excess of 70% efficiency increases over normal heuristic search methods. The technique relies on precomputing distance estimates to landmarks which are then used to produce probability distributions over exact heuristics for use in heuristic searches such as A* and D*. The location and number of these landmarks therefore influence greatly the efficiency of the search and the quality of the risk bounds. Here four new methods of selecting landmarks for risk based search are evaluated. Results are shown which demonstrate that landmark selection needs to take into account the centrality of the landmark, and that diminishing rewards are obtained from using large numbers of landmarks.
Resumo:
Australian women make decisions about return to paid work and care for their child within a policy environment that presents mixed messages about maternal employment and child care standards. Against this background an investigation of first-time mothers’ decision-making about workforce participation and child care was undertaken. Four women were studied from pregnancy through the first postnatal year using interview and diary methods. Inductive analyses identified three themes, all focused on dimensions of family security: financial security relating to family income, emotional security relating to child care quality, and pragmatic security relating to child care access. The current policy changes that aim to increase child care quality standards in Australia present a positive step toward alleviating family insecurities but are insufficient to alleviate the evidently high levels of tension between workforce participation and family life experienced by women transitioning back into the workforce in Australia.
Resumo:
This letter presents a technique to assess the overall network performance of sampled value process buses based on IEC 61850-9-2 using measurements from a single location in the network. The method is based upon the use of Ethernet cards with externally synchronized time stamping, and characteristics of the process bus protocol. The application and utility of the method is demonstrated by measuring latency introduced by Ethernet switches. Network latency can be measured from a single set of captures, rather than comparing source and destination captures. Absolute latency measures will greatly assist the design testing, commissioning and maintenance of these critical data networks.
Resumo:
New substation automation applications, such as sampled value process buses and synchrophasors, require sampling accuracy of 1 µs or better. The Precision Time Protocol (PTP), IEEE Std 1588, achieves this level of performance and integrates well into Ethernet based substation networks. This paper takes a systematic approach to the performance evaluation of commercially available PTP devices (grandmaster, slave, transparent and boundary clocks) from a variety of manufacturers. The ``error budget'' is set by the performance requirements of each application. The ``expenditure'' of this error budget by each component is valuable information for a system designer. The component information is used to design a synchronization system that meets the overall functional requirements. The quantitative performance data presented shows that this testing is effective and informative. Results from testing PTP performance in the presence of sampled value process bus traffic demonstrate the benefit of a ``bottom up'' component testing approach combined with ``top down'' system verification tests. A test method that uses a precision Ethernet capture card, rather than dedicated PTP test sets, to determine the Correction Field Error of transparent clocks is presented. This test is particularly relevant for highly loaded Ethernet networks with stringent timing requirements. The methods presented can be used for development purposes by manufacturers, or by system integrators for acceptance testing. A sampled value process bus was used as the test application for the systematic approach described in this paper. The test approach was applied, components were selected, and the system performance verified to meet the application's requirements. Systematic testing, as presented in this paper, is applicable to a range of industries that use, rather than develop, PTP for time transfer.
Resumo:
The International Baccalaureate’s branding and reputation targets academic high achievers aiming for university entrance. This is an empirical examination of the growing popularity of this transnational secondary credential amongst local populations in Australia, focusing on its uptake across the community, and the discourses underpinning its spread and popularity. This paper reports on online surveys of 179 parents and 231 students in schools offering the IB as an alternative to Australian state curricula. It sets out to understand the social ecology of who chooses the IB and who it chooses. Statistically significant differences between IB and non-IB choosers were found in terms of family income, parent education, student aspirations, transnational lifestyles, and neoconservative, neoliberal and cosmopolitan beliefs. The analysis demonstrates how the reproduction of advantage is accomplished through choice behaviours in stratified educational markets.
Resumo:
Process bus networks are the next stage in the evolution of substation design, bringing digital technology to the high voltage switchyard. Benefits of process buses include facilitating the use of Non-Conventional Instrument Transformers, improved disturbance recording and phasor measurement and the removal of costly, and potentially hazardous, copper cabling from substation switchyards and control rooms. This paper examines the role a process bus plays in an IEC 61850 based Substation Automation System. Measurements taken from a process bus substation are used to develop an understanding of the network characteristics of "whole of substation" process buses. The concept of "coherent transmission" is presented and the impact of this on Ethernet switches is examined. Experiments based on substation observations are used to investigate in detail the behavior of Ethernet switches with sampled value traffic. Test methods that can be used to assess the adequacy of a network are proposed, and examples of the application and interpretation of these tests are provided. Once sampled value frames are queued by an Ethernet switch the additional delay incurred by subsequent switches is minimal, and this allows their use in switchyards to further reduce communications cabling, without significantly impacting operation. The performance and reliability of a process bus network operating with close to the theoretical maximum number of digital sampling units (merging units or electronic instrument transformers) was investigated with networking equipment from several vendors, and has been demonstrated to be acceptable.
Resumo:
New substation technology, such as non-conventional instrument transformers,and a need to reduce design and construction costs, are driving the adoption of Ethernet based digital process bus networks for high voltage substations. Protection and control applications can share a process bus, making more efficient use of the network infrastructure. This paper classifies and defines performance requirements for the protocols used in a process bus on the basis of application. These include GOOSE, SNMP and IEC 61850-9-2 sampled values. A method, based on the Multiple Spanning Tree Protocol (MSTP) and virtual local area networks, is presented that separates management and monitoring traffic from the rest of the process bus. A quantitative investigation of the interaction between various protocols used in a process bus is described. These tests also validate the effectiveness of the MSTP based traffic segregation method. While this paper focusses on a substation automation network, the results are applicable to other real-time industrial networks that implement multiple protocols. High volume sampled value data and time-critical circuit breaker tripping commands do not interact on a full duplex switched Ethernet network, even under very high network load conditions. This enables an efficient digital network to replace a large number of conventional analog connections between control rooms and high voltage switchyards.
Resumo:
Powerlink Queensland has undertaken an aggressive program of research, development and implementation of IEC 61850-based system solutions. The intent is to move towards an IEC 61850 process bus using a two-step approach.
Resumo:
Dhaka, which is the capital of Bangladesh, is facing serious traffic congestion and whole traffic situation in Dhaka is in chaos. Government has initiated some projects; such as BRT, MRT and elevated expressway; to improve the situation. Road pricing is very popular concept, which can be implemented in Dhaka with BRT and MRT as an integrated manner. Even though it is very popular concept not many countries except some developed countries implemented road pricing practically. None of the developing countries adopted this policy. For success of road pricing it has to be acceptable among the stakeholders. Public are the main stakeholders for road pricing. This paper will explore whether road pricing will be acceptable in Dhaka considering only work trip in Dhaka. A sample of workers had been surveyed randomly. They were asked some demographic questions, such as age, gender, income and educational qualification; how they travelled to work; and whether they would accept road pricing; and if they would not accept road pricing the reasons behind that. Also respondents were given several hypothetical choices to see how respondents react with different road charge by choosing travel mode for their work trip. The methodological approach taken for analysis is qualitative and quantitative analysis. For quantitative analysis Binary Logit Regression analysis was carried out to find out the significant factors for accepting or not accepting road pricing.
Resumo:
Widespread adoption by electricity utilities of Non-Conventional Instrument Transformers, such as optical or capacitive transducers, has been limited due to the lack of a standardised interface and multi-vendor interoperability. Low power analogue interfaces are being replaced by IEC 61850 9 2 and IEC 61869 9 digital interfaces that use Ethernet networks for communication. These ‘process bus’ connections achieve significant cost savings by simplifying connections between switchyard and control rooms; however the in-service performance when these standards are employed is largely unknown. The performance of real-time Ethernet networks and time synchronisation was assessed using a scale model of a substation automation system. The test bed was constructed from commercially available timing and protection equipment supplied by a range of vendors. Test protocols have been developed to thoroughly evaluate the performance of Ethernet networks and network based time synchronisation. The suitability of IEEE Std 1588 Precision Time Protocol (PTP) as a synchronising system for sampled values was tested in the steady state and under transient conditions. Similarly, the performance of hardened Ethernet switches designed for substation use was assessed under a range of network operating conditions. This paper presents test methods that use a precision Ethernet capture card to accurately measure PTP and network performance. These methods can be used for product selection and to assess ongoing system performance as substations age. Key findings on the behaviour of multi-function process bus networks are presented. System level tests were performed using a Real Time Digital Simulator and transformer protection relay with sampled value and Generic Object Oriented Substation Events (GOOSE) capability. These include the interactions between sampled values, PTP and GOOSE messages. Our research has demonstrated that several protocols can be used on a shared process bus, even with very high network loads. This should provide confidence that this technology is suitable for transmission substations.