189 resultados para Bay Area Rapid Transit System.
Resumo:
The Government of Bangladesh is planning to develop and implement Bus Rapid Transit (BRT) in Dhaka city. This paper presents a stated choice survey conducted to understand workers’ attitudes toward BRT in Dhaka. The survey data are analysed using a multinomial logit (MNL) model to scrutinize social and economic factors’ impact on participant’s mode choices. Analysis results reveal that males, workers of higher age, education qualification, and income have a greater tendency towards choosing BRT.
Resumo:
Transit agencies across the world are increasingly shifting their fare collection mechanisms towards fully automated systems like the smart card. One of the objectives in implementing such a system is to reduce the boarding time per passenger and hence reduce the overall dwell time for the buses at the bus stops/bus rapid transit (BRT) stations. TransLink, the transit authority responsible for public transport management in South East Queensland, has introduced ‘GoCard’ technology using the Cubic platform for fare collection on its public transport system. In addition to this, three inner city BRT stations on South East Busway spine are operating as pre-paid platforms during evening peak time. This paper evaluates the effects of these multiple policy measures on operation of study busway station. The comparison between pre and post policy scenarios suggests that though boarding time per passenger has decreased, while the alighting time per passenger has increased slightly. However, there is a substantial reduction in operating efficiency was observed at the station.
Resumo:
In this paper a new approach is proposed for interpreting of regional frequencies in multi machine power systems. The method uses generator aggregation and system reduction based on coherent generators in each area. The reduced system structure is able to be identified and a kalman estimator is designed for the reduced system to estimate the inter-area modes using the synchronized phasor measurement data. The proposed method is tested on a six machine, three area test system and the obtained results show the estimation of inter-area oscillations in the system with a high accuracy.
Resumo:
Bus Rapid Transit (BRT), because of its operational flexibility and simplicity, is rapidly gaining popularity with urban designers and transit planners. Earlier BRTs were bus shared lane or bus only lane, which share the roadway with general and other forms of traffic. In recent time, more sophisticated designs of BRT have emerged, such as busway, which has separate carriageway for buses and provides very high physical separation of buses from general traffic. Line capacities of a busway are predominately dependent on bus capacity of its stations. Despite new developments in BRT designs, the methodology of capacity analysis is still based on traditional principles of kerbside bus stop on bus only lane operations. Consequently, the tradition methodology lacks accounting for various dimensions of busway station operation, such as passenger crowd, passenger walking and bus lost time along the long busway station platform. This research has developed a purpose made bus capacity analysis methodology for busway station analysis. Extensive observations of kerbside bus stops and busway stations in Brisbane, Australia were made and differences in their operation were studied. A large scale data collection was conducted using the video recording technique at the Mater Hill Busway Station on the South East Busway in Brisbane. This research identified new parameters concerning busway station operation, and through intricate analysis identified the elements and processes which influence the bus dwell time at a busway station platform. A new variable, Bus lost time, was defined and its quantitative descriptions were established. Based on these finding and analysis, a busway station platform bus capacity methodology was developed, comprising of new models for busway station lost time, busway station dwell time, busway station loading area bus capacity, and busway station platform bus capacity. The new methodology not only accounts for passenger boarding and alighting, but also covers platform crowd and bus lost time in station platform bus capacity estimation. The applicability of this methodology was shown through demonstrative examples. Additionally, these examples illustrated the significance of the bus lost time variable in determining station capacities.
Resumo:
Dhaka, the capital of Bangladesh, is facing severe traffic congestion. Owing to the flaws in past land use and transport planning decisions, uncontrolled population growth and urbanization, Dhaka’s traffic condition is worsening. Road space is widely regarded in the literature as a utility, so a common view of transport economists is that its usage ought to be charged. Road pricing policy has proven to be effective in managing travel demand, in order to reduce traffic congestion from road networks in a number of cities including London, Stockholm and Singapore. Road pricing as an economic mechanism to manage travel demand can be more effective and user-friendly when revenue is hypothecated into supply alternatives such as improvements to the transit system. This research investigates the feasibility of adopting road pricing in Dhaka with respect to a significant Bus Rapid Transit (BRT) project. Because both are very new concepts for the population of Dhaka, public acceptability would be a principal issue driving their success or failure. This paper explores the travel behaviour of workers in Dhaka and public perception toward Road Pricing with regards to work trips- based on worker’s travel behaviour. A revealed preference and stated preference survey has been conducted on sample of workers in Dhaka. They were asked limited demographic questions, their current travel behaviour and at the end they had been given several hypothetical choices of integrated BRT and road pricing to choose from. Key finding from the survey is the objective of integrated road pricing; subsidies Bus rapid Transit by road pricing to get reduced BRT fare; cannot be achieved in Dhaka. This is because most of the respondent stated that they would choose the cheapest option Walk-BRT-Walk, even though this would be more time consuming and uncomfortable as they have to walk from home to BRT station and also from BRT station to home. Proper economic analysis has to be carried out to find out the appropriate fare of BRT and road charge with some incentive for the low income people.
Resumo:
This report is a technical assessment of the hydrological environment of the southern Moreton Bay islands and follows the terms of reference supplied by the then Queensland Department of Natural Resources and Water. The terms of reference describe stage 1 as a condition assessment and stage 2 as an assessment of the implications of water planning scenarios on future condition. This report is the first stage of a two-stage investigation whose primary purpose is to identify and assess groundwater dependent ecosystems (GDEs) and the groundwater flow regimes necessary to support them. Within this context, the groundwaters themselves are also considered and comment made on their condition. Information provided in this report will inform an amendment to the Logan Basin Water Resource Plan to incorporate the southern Moreton Bay islands. The study area is the water resource plan amendment area, which includes North and South Stradbroke islands and the smaller islands between these and the mainland, including the inhabited smaller rocky islands—namely, Macleay, Russell, Karragarra, Lamb and Coochiemudlo islands. This assessment is largely a desktop study based on existing information, but incorporates some field observations, input from experts in specific areas and community representatives, and the professional experience and knowledge of the authors. This report reviews existing research and information on the southern Moreton Bay area with an emphasis on North Stradbroke Island, as it represents the largest and most regionally significant groundwater resource in southern Moreton Bay. The report provides an assessment of key waterrelated environmental features, their condition and their degree of dependence on groundwater. This report also assesses the condition and status of ecosystems within this region. In addition, the report identifies information gaps, uncertainties and potential impacts; reviews groundwater models that have been developed for North Stradbroke Island; and makes recommendations on monitoring and research needs.
Resumo:
This paper describes the work being conducted in the baseline rail level crossing project, supported by the Australian rail industry and the Cooperative Research Centre for Rail Innovation. The paper discusses the limitations of near-miss data for analysis obtained using current level crossing occurrence reporting practices. The project is addressing these limitations through the development of a data collection and analysis system with an underlying level crossing accident causation model. An overview of the methodology and improved data recording process are described. The paper concludes with a brief discussion of benefits this project is expected to provide the Australian rail industry.
Resumo:
Collisions between pedestrians and vehicles continue to be a major problem throughout the world. Pedestrians trying to cross roads and railway tracks without any caution are often highly susceptible to collisions with vehicles and trains. Continuous financial, human and other losses have prompted transport related organizations to come up with various solutions addressing this issue. However, the quest for new and significant improvements in this area is still ongoing. This work addresses this issue by building a general framework using computer vision techniques to automatically monitor pedestrian movements in such high-risk areas to enable better analysis of activity, and the creation of future alerting strategies. As a result of rapid development in the electronics and semi-conductor industry there is extensive deployment of CCTV cameras in public places to capture video footage. This footage can then be used to analyse crowd activities in those particular places. This work seeks to identify the abnormal behaviour of individuals in video footage. In this work we propose using a Semi-2D Hidden Markov Model (HMM), Full-2D HMM and Spatial HMM to model the normal activities of people. The outliers of the model (i.e. those observations with insufficient likelihood) are identified as abnormal activities. Location features, flow features and optical flow textures are used as the features for the model. The proposed approaches are evaluated using the publicly available UCSD datasets, and we demonstrate improved performance using a Semi-2D Hidden Markov Model compared to other state of the art methods. Further we illustrate how our proposed methods can be applied to detect anomalous events at rail level crossings.
Resumo:
Impact forces develop at the wheel/rail interface due to the presence of defects in the running surface of the wheel and/ or the railhead. This paper reports on wheel impacts, caused by permanently dipped rail joints, that are characterised by high-frequency impact forces generated by high amplifications of the static load that occur for a very short duration (P1 forces), followed by relatively low frequency, lower amplitude forces (P2 forces) that occur for a longer duration. These impact forces are affected by the design of components adjacent to the wheel and rail, namely the bogie’s primary suspension and rail seat pads; the influences of stiffness and damping characteristics of these components are investigated. A modified three-dimensional simulation model of the dynamics of the wagon/track system that includes defects in the track is created and is used to obtain the time series of the impact force. This is converted into impact force factors that are compared with a set of field-measured data reported in the literature. A simplified equation for the determination of impact force factors due to dipped rail joints is also proposed and validated.
Resumo:
Stations on Bus Rapid Transit (BRT) lines ordinarily control line capacity because they act as bottlenecks. At stations with passing lanes, congestion may occur when buses maneuvering into and out of the platform stopping lane interfere with bus flow, or when a queue of buses forms upstream of the station blocking inflow. We contend that, as bus inflow to the station area approaches capacity, queuing will become excessive in a manner similar to operation of a minor movement on an unsignalized intersection. This analogy was used to treat BRT station operation and to analyze the relationship between station queuing and capacity. We conducted microscopic simulation to study and analyze operating characteristics of the station under near steady state conditions through output variables of capacity, degree of saturation and queuing. In the first of two stages, a mathematical model was developed for all stopping buses potential capacity with bus to bus interference and the model was validated. Secondly, a mathematical model was developed to estimate the relationship between average queue and degree of saturation and calibrated for a specified range of controlled scenarios of mean and coefficient of variation of dwell time.
Resumo:
In 2009, the area of the Moreton Bay Marine Park was increased from 0.5 per cent of the Bay area to 16 per cent. During the planning process, opposition by commercial and recreational fishers alike was raised, arguing that loss of fishing grounds would lead to substantial loss in economic benefits. The commercial sector was compensated through a buyback of fishing effort, but the recreational sector received no compensation. In this paper, we develop a travel cost model to estimate the potential economic impact on the recreational sector from the marine park rezoning. The results suggest that, counter to initial claims, non-market recreational fishing benefits may have increased by between $1.3m and $2.5m a year, with a current total annual value of around $20m. Keywords: Travel cost model; Economic valuation; Moreton Bay Marine Park; Recreational fishing
Resumo:
People suffering from pain due to osteoarthritic or rheumatoidal changes in the joints are still waiting for a better treatment. Although some studies have achieved success in repairing small cartilage defects, there is no widely accepted method for complete repair of osteochondral defects. Also joint replacements have not yet succeeded in replacing of natural cartilage without complications. Therefore, there is room for a new medical approach, which outperforms currently used methods. The aim of this study is to show potential of using a tissue engineering approach for regeneration of osteochondral defects. The critical review of currently used methods for treatment of osteochondral defects is also provided. In this study, two kinds of hybrid scaffolds developed in Hutmacher's group have been analysed. The first biphasic scaffold consists of fibrin and PCL. The fibrin serves as a cartilage phase while the porous PCL scaffold acts as the subchondral phase. The second system comprises of PCL and PCL-TCP. The scaffolds were fabricated via fused deposition modeling which is a rapid prototyping system. Bone marrow-derived mesenchymal cells were isolated from New Zealand White rabbits, cultured in vitro and seeded into the scaffolds. Bone regenerations of the subchondral phases were quantified via micro CT analysis and the results demonstrated the potential of the porous PCL and PCL-TCP scaffolds in promoting bone healing. Fibrin was found to be lacking in this aspect as it degrades rapidly. On the other hand, the porous PCL scaffold degrades slowly hence it provides an effective mechanical support. This study shows that in the field of cartilage repair or replacement, tissue engineering may have big impact in the future. In vivo bone and cartilage engineering via combining a novel composite, biphasic scaffold technology with a MSC has been shown a high potential in the knee defect regeneration in the animal models. However, the clinical application of tissue engineering requires the future research work due to several problems, such as scaffold design, cellular delivery and implantation strategies.
Resumo:
The common approach to estimate bus dwell time at a BRT station is to apply the traditional dwell time methodology derived for suburban bus stops. In spite of being sensitive to boarding and alighting passenger numbers and to some extent towards fare collection media, these traditional dwell time models do not account for the platform crowding. Moreover, they fall short in accounting for the effects of passenger/s walking along a relatively longer BRT platform. Using the experience from Brisbane busway (BRT) stations, a new variable, Bus Lost Time (LT), is introduced in traditional dwell time model. The bus lost time variable captures the impact of passenger walking and platform crowding on bus dwell time. These are two characteristics which differentiate a BRT station from a bus stop. This paper reports the development of a methodology to estimate bus lost time experienced by buses at a BRT platform. Results were compared with the Transit Capacity and Quality of Servce Manual (TCQSM) approach of dwell time and station capacity estimation. When the bus lost time was used in dwell time calculations it was found that the BRT station platform capacity reduced by 10.1%.
Resumo:
The common approach to estimate bus dwell time at a BRT station platform is to apply the traditional dwell time methodology derived for suburban bus stops. Current dwell time models are sensitive towards bus type, fare collection policy along with the number of boarding and alighting passengers. However, they fall short in accounting for the effects of passenger/s walking on a relatively longer BRT station platform. Analysis presented in this paper shows that the average walking time of a passenger at BRT platform is 10 times more than that of bus stop. The requirement of walking to the bus entry door at the BRT station platform may lead to the bus experiencing a higher dwell time. This paper presents a theory for a BRT network which explains the loss of station capacity during peak period operation. It also highlights shortcomings of present available bus dwell time models suggested for the analysis of BRT operation.
Resumo:
The topic of fault detection and diagnostics (FDD) is studied from the perspective of proactive testing. Unlike most research focus in the diagnosis area in which system outputs are analyzed for diagnosis purposes, in this paper the focus is on the other side of the problem: manipulating system inputs for better diagnosis reasoning. In other words, the question of how diagnostic mechanisms can direct system inputs for better diagnosis analysis is addressed here. It is shown how the problem can be formulated as decision making problem coupled with a Bayesian Network based diagnostic mechanism. The developed mechanism is applied to the problem of supervised testing in HVAC systems.