This research investigated students' construction of knowledge about the topics of magnetism and electricity emergent from a visit to an interactive science centre and subsequent classroom-based activities linked to the science centre exhibits. The significance of this study is that it analyses critically an aspect of school visits to informal learning centres that has been neglected by researchers in the past, namely the influence of post-visit activities in the classroom on subsequent learning and knowledge construction. Employing an interpretive methodology, the study focused on three areas of endeavour. Firstly, the establishment of a set of principles for the development of post-visit activities, from a constructivist framework, to facilitate students' learning of science. Secondly, to describe and interpret students' scientific understandings : prior t o a visit t o a science museum; following a visit t o a science museum; and following post-visit activities that were related to their museum experiences. Finally, to describe and interpret the ways in which students constructed their understandings: prior to a visit to a science museum; following a visit to a science museum; and following post-visit activities directly related to their museum experiences. The study was designed and implemented in three stages: 1) identification and establishment of the principles for design and evaluation of post-visit activities; 2) a pilot study of specific post-visit activities and data gathering strategies related to student construction of knowledge; and 3) interpretation of students' construction of knowledge from a visit to a science museum and subsequent completion of post-visit activities, which constituted the main study. Twelve students were selected from a year 7 class to participate in the study. This study provides evidence that the series of post-visit activities, related to the museum experiences, resulted in students constructing and reconstructing their personal knowledge of science concepts and principles represented in the science museum exhibits, sometimes towards the accepted scientific understanding and sometimes in different and surprising ways. Findings demonstrate the interrelationships between learning that occurs at school, at home and in informal learning settings. The study also underscores for teachers and staff of science museums and similar centres the importance of planning pre- and post-visit activities, not only to support the development of scientific conceptions, but also to detect and respond to alternative conceptions that may be produced or strengthened during a visit to an informal learning centre. Consistent with contemporary views of constructivism, the study strongly supports the views that : 1) knowledge is uniquely structured by the individual; 2) the processes of knowledge construction are gradual, incremental, and assimilative in nature; 3) changes in conceptual understanding are can be interpreted in the light of prior knowledge and understanding; and 4) knowledge and understanding develop idiosyncratically, progressing and sometimes appearing to regress when compared with contemporary science. This study has implications for teachers, students, museum educators, and the science education community given the lack of research into the processes of knowledge construction in informal contexts and the roles that post-visit activities play in the overall process of learning.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Green energy is one of the key factors, driving down electricity bill and zero carbon emission generating electricity to green building. However, the climate change and environmental policies are accelerating people to use renewable energy instead of coal-fired (convention type) energy for green building that energy is not environmental friendly. Therefore, solar energy is one of the clean energy solving environmental impact and paying less in electricity fee. The method of solar energy is collecting sun from solar array and saves in battery from which provides necessary electricity to whole house with zero carbon emission. However, in the market a lot of solar arrays suppliers, the aims of this paper attempted to use superiority and inferiority multi-criteria ranking (SIR) method with 13 constraints establishing I-flows and S-flows matrices to evaluate four alternatives solar energies and determining which alternative is the best, providing power to sustainable building. Furthermore, SIR is well-known structured approach of multi-criteria decision support tools and gradually used in construction and building. The outcome of this paper significantly gives an indication to user selecting solar energy.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Resumo: Esse artigo apresenta os resultados parciais de uma pesquisa em andamento que, a partir do método etnográfico, investiga os projetos de comunicação comunitária, jornalismo e fotojornalismo desenvolvidos por duas organizações não-governamentais na cidade do Rio de Janeiro. O trabalho de campo, realizado durante três meses nas favelas cariocas, forneceu questões teóricas relevantes para os estudos do jornalismo, destacando-se as problematizações sobre a noção de valores-notícia. Voltados para a produção de narrativas centradas no cotidiano das comunidades, os fotojornalistas populares consideram fundamental discutir os valores-notícia formulados pela grande imprensa e propor “contra-valores”.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main purpose of this article is to gain an insight into the relationships between variables describing the environmental conditions of the Far Northern section of the Great Barrier Reef, Australia. Several of the variables describing these conditions had different measurement levels and often they had non-linear relationships. Using non-linear principal component analysis, it was possible to acquire an insight into these relationships. Furthermore, three geographical areas with unique environmental characteristics could be identified.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The rising problems associated with construction such as decreasing quality and productivity, labour shortages, occupational safety, and inferior working conditions have opened the possibility of more revolutionary solutions within the industry. One prospective option is in the implementation of innovative technologies such as automation and robotics, which has the potential to improve the industry in terms of productivity, safety and quality. The construction work site could, theoretically, be contained in a safer environment, with more efficient execution of the work, greater consistency of the outcome and higher level of control over the production process. By identifying the barriers to construction automation and robotics implementation in construction, and investigating ways in which to overcome them, contributions could be made in terms of better understanding and facilitating, where relevant, greater use of these technologies in the construction industry so as to promote its efficiency. This research aims to ascertain and explain the barriers to construction automation and robotics implementation by exploring and establishing the relationship between characteristics of the construction industry and attributes of existing construction automation and robotics technologies to level of usage and implementation in three selected countries; Japan, Australia and Malaysia. These three countries were chosen as their construction industry characteristics provide contrast in terms of culture, gross domestic product, technology application, organisational structure and labour policies. This research uses a mixed method approach of gathering data, both quantitative and qualitative, by employing a questionnaire survey and an interview schedule; using a wide range of sample from management through to on-site users, working in a range of small (less than AUD0.2million) to large companies (more than AUD500million), and involved in a broad range of business types and construction sectors. Detailed quantitative (statistical) and qualitative (content) data analysis is performed to provide a set of descriptions, relationships, and differences. The statistical tests selected for use include cross-tabulations, bivariate and multivariate analysis for investigating possible relationships between variables; and Kruskal-Wallis and Mann Whitney U test of independent samples for hypothesis testing and inferring the research sample to the construction industry population. Findings and conclusions arising from the research work which include the ranking schemes produced for four key areas of, the construction attributes on level of usage; barrier variables; differing levels of usage between countries; and future trends, have established a number of potential areas that could impact the level of implementation both globally and for individual countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The decision as to which procurement system to adopt is a complex and challenging task for clients of construction projects. Despite a plethora of tools and techniques available for selecting a procurement method, clients are still uncertain about what method to adopt for a given construction project to achieve success. This paper examines ‘how and why’ procurement methods are selected by public sector clients in Queensland (QLD) and Western Australia (WA). Findings from workshops with senior managers in procurement selection revealed that traditional lump sum methods (TLS) are preferred even though alternative forms could be better suited for a given project. Participants of the workshops agreed that alternative procurement forms should be considered for projects but an embedded culture of uncertainty avoidance meant the selection of TLS methods. It was perceived that only a limited number of contractors operating in the marketplace have the resources and experience to deliver projects using the non-traditional methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Manufacture, construction and use of buildings and building materials make a significant environmental impact internally (inside the building), locally (neighbourhood) and globally. Life cycle assessment (LCA) methodology is being applied for evaluating the environmental impact of building/or building materials. One of the major applications of LCA is to identify key issues of a product system from cradle to grave. Key issues identified in an LCA lead one to the right direction in assessing the environmental aspects of a product system and help to identify the areas for improvement of the environmental performance of a product as well. The purpose of this paper is to suggest two methods for identifying key issues using an integrated tool (LCADesign), which has been developed to provide a method of determining the best alternative for reducing environmental impacts from a building or building materials, and compare both methods in the case study. This paper assists the designers or marketers related to building or building materials in their decision making by giving information on activities or alternatives which are identified as key issues for environmental impacts.