285 resultados para enterprise project management
Resumo:
With the increase in complexity of engineering projects and design quality in the construction industry, the traditional two-dimensional "Information Island" approach to design is becoming less able to meet current design needs due to its lack of coordination and information sharing. Collaborative design using a Build Information Modeling (BIM) technology platform promises to provide an effective means of designing and communicating through networking and real-time data sharing. This paper first analyzes the shortcomings of the two-dimensional design process and the potential application of collaborative design. By combining the attributes of BIM, a preliminary BIM-based building design collaborative platform is developed to improve the design approach and support a more collaborative design process. A real-life case is presented to demonstrate the feasibility and validity of the platform and its use in practice. From this, it is shown that BIM has the potential to realize effective information sharing and reduce errors, thereby improving design quality. The BIM-based building design collaborative platform presented is expected to provide the support needed for the extensive application of BIM in collaborative design and promote a new attitude to project management.
Resumo:
Recent literature acknowledges the need for new career development models to support the way that careers evolve in the 21st century workplace (Bloch 2005). This is particularly so within temporary organisation forms, and for those pursuing a career in project management (Hölzle 2010). Our research, explores how project managers working on projects and within temporary organisation forms and those working on project-linked contracts access the development opportunities they require to remain employable in an era of project-by-project employment. Set in Australia where a project-based economy (Crawford, French and Lloyd-Walker 2013) and contract work have led to casualisation of the workforce (Connell & Burgess, 2006; McKeown & Hanley (2009) the results suggest new approaches to career development may be required.
Resumo:
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.
Resumo:
Rapid urbanization in developing countries such as China has been creating unprecedented opportunities for the adoption of sustainable construction (SC). Owner, as a key driver of urbanization, plays an influential role for other stakeholders to undertake SC practices. However, lacking their demands and requirements of owners were regarded as the main barriers for the adoption of SC. Notwithstanding the diversity of previous studies on the barriers to SC, there is a dearth of research from the owner’s perspective. This paper presents an empirical study identifying the critical factors impeding the adoption of SC from the owners’ point of view. A list of 25 factors was preliminarily identified through extensive literature review and interviews with industry professionals. This was followed by a questionnaire survey to collect owners’ opinions on the relative importance of these factors. Using factor analysis, seven most critical factors are identified, namely, economic feasibility, awareness, support from project stakeholders, legislation and regulation, operability of SC, resource risk, and project management model. The research findings show that economic feasibility, awareness, legislation and regulation are the most important factors impeding owners in adopting SC practices. This implied that the government plays a vital role in removing the barriers impeding the greater adoption of SC by building owners in China. This is helpful for a transition to the low carbon urbanization.
Resumo:
The quality of environmental decisions are gauged according to the management objectives of a conservation project. Management objectives are generally about maximising some quantifiable measure of system benefit, for instance population growth rate. They can also be defined in terms of learning about the system in question, in such a case actions would be chosen that maximise knowledge gain, for instance in experimental management sites. Learning about a system can also take place when managing practically. The adaptive management framework (Walters 1986) formally acknowledges this fact by evaluating learning in terms of how it will improve management of the system and therefore future system benefit. This is taken into account when ranking actions using stochastic dynamic programming (SDP). However, the benefits of any management action lie on a spectrum from pure system benefit, when there is nothing to be learned about the system, to pure knowledge gain. The current adaptive management framework does not permit management objectives to evaluate actions over the full range of this spectrum. By evaluating knowledge gain in units distinct to future system benefit this whole spectrum of management objectives can be unlocked. This paper outlines six decision making policies that differ across the spectrum of pure system benefit through to pure learning. The extensions to adaptive management presented allow specification of the relative importance of learning compared to system benefit in management objectives. Such an extension means practitioners can be more specific in the construction of conservation project objectives and be able to create policies for experimental management sites in the same framework as practical management sites.
Resumo:
While the growth in the number of IT investments remains strong, research in the IT investment field is limited, resulting in suboptimal practical guidance on effectively governing IT investments. Based on resource-based theory, this paper reports the initial work involved in developing a construct names IT investment governance (ITIG), because it can be used to measure organizations' capability to govern their IT investments. This paper then empirically examines the association of ITIG and corporate performance. The preliminary result is a four-factor, 16-item instrument for assessing the ITIG construct. This method's factors are IT investment value governance, IT investment value monitoring, IT investment appraisals and IT investment project management. The impact of ITIG on corporate performance was demonstrated with a significant and positive relationship found to exist between the ITIG construct and corporate performance, thus supporting the effectiveness of the ITIG construct. Corporations with higher levels of ITIG capability are more likely to maximize the contribution of their IT investments to firm value.
Resumo:
The purpose of this article is to contribute, from a research practitioner perspective, to the theory–practice gap debate in organization studies, focusing on pluralistic contexts such as project organizing. The current debate is introduced; then the features of the two main philosophical traditions (i.e., modernism and postmodernism) are critically summarized. Then, propositions to reconnect theory and practice according to the Aristotelian premodern ethical and practical philosophy are discussed. Some key implications in the following areas are outlined: roles played by practitioners and scholars; emancipatory praxeological style of reasoning; closing the “phronetic gap”; and the development of “good practice,” ethics, and politics.
Resumo:
Broad knowledge is required when a business process is modeled by a business analyst. We argue that existing Business Process Management methodologies do not consider business goals at the appropriate level. In this paper we present an approach to integrate business goals and business process models. We design a Business Goal Ontology for modeling business goals. Furthermore, we devise a modeling pattern for linking the goals to process models and show how the ontology can be used in query answering. In this way, we integrate the intentional perspective into our business process ontology framework, enriching the process description and enabling new types of business process analysis. © 2008 IEEE.
Resumo:
There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.
Resumo:
There is widespread agreement that entrepreneurial skills are crucial for young people today, yet there are few studies of high school students engaging in entrepreneurship education that might prepare them for music industry careers. This study has been developed in response to these challenges. It explores a group of high school students (15 – 17 years) who alongside their teacher, have co-designed, developed and driven a new business venture, Youth Music Industries (YMI) since 2010. This venture staged cycles of differently scaled events featuring young artists for a young audience. The project was designed to give students a real business situation for developing their project management skills and a broader understanding of working in the music industry. Informed by concepts of social capital and communities of practice, the study examines the process of learning with and through others. This high-stakes environment increased their sense of presence and participation and made it possible for these young people to distribute expertise and learn from each other in a reciprocal and more democratic way. The ongoing success of this organisation can be attributed to the entrepreneurial competencies students developed. The resulting model and design principles talk to an ongoing challenge that has been identified in music education, and creative industries more generally. These principles offer a way forward for other music and creative industries educators or researchers interested in developing models of, and designs for, nurturing an entrepreneurial mindset.
Resumo:
The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.
Resumo:
Anticipating the number and identity of bidders has significant influence in many theoretical results of the auction itself and bidders’ bidding behaviour. This is because when a bidder knows in advance which specific bidders are likely competitors, this knowledge gives a company a head start when setting the bid price. However, despite these competitive implications, most previous studies have focused almost entirely on forecasting the number of bidders and only a few authors have dealt with the identity dimension qualitatively. Using a case study with immediate real-life applications, this paper develops a method for estimating every potential bidder’s probability of participating in a future auction as a function of the tender economic size removing the bias caused by the contract size opportunities distribution. This way, a bidder or auctioner will be able to estimate the likelihood of a specific group of key, previously identified bidders in a future tender.
Resumo:
Clarification performance and flocculant dosage is strongly linked to the mud solids loading in the feed entering the clarifier. The recycle of filtrate can represent an extra ~10-15% mud solids loading on the clarifier, thereby reducing its effective capacity. Filtrate recycling may cause significant increase in turbidity, complexed calcium ion formation, phosphate, proteins and polysaccharides in mixed juice that impact on evaporator scale formation and molasses exhaustion. The paper details the results obtained from laboratory, pilot scale and factory trials of filtrate clarification using both sedimentation and flotation methods. Clarified filtrate could be produced of similar quality to ESJ. Filtrate clarification was able to significantly remove insoluble solids, turbidity, phosphate, and polysaccharides content with slight reductions in minerals content of the filtrate. On the basis of improved filtrate quality, the clarified filtrate could be directed to ESJ, instead of the normal practice of directing the mud filtrate to mixed juice. The potential impacts of implementing filtrate clarification are discussed in respect to improved performance and throughput of the clarification station.
Resumo:
Construction and demolition (C&D) waste have negative impacts on the environment. As a significant proportion of C&D waste is related to the design stage of a project, there is an opportunity for architects to reduce the waste. However, research suggests that many architects often do not understand the impact of their design on waste generation. Training and education are proposed by current researchers to improve architects’ knowledge; however, this has not been adequately validated as a viable approach to solving waste issues. This research investigates architects’ perceptions towards waste management in the design phase, and determines whether they feel they are adequately skilled in reducing C&D waste. Questionnaire surveys were distributed to architects from 98 architectural firms and 25 completed surveys were returned. The results show that while architects are aware of the relationship between design and waste, ‘extra time’ and ‘lack of knowledge’ are the key barriers to implementing waste reduction strategies. In addition, the majority of respondents acknowledge their lack of skill to reduce waste through design evaluation. Therefore, training programmes can be a viable strategy to enable them to address the pressing issue of C&D waste reduction.
Resumo:
"Safety of RMAA works is an almost uncharted topic of rising importance internationally. Small construction contractors are particularly dependant on RMAA work, especially during times of recession, and they undertake more risks on these jobs than large companies do. This book is based on unique international research and consultancy projects which detail, investigate, and suggest solutions to the specific challenges of safety in RMAA works, based on case studies. Starting with an overview of safety in the wider construction industries of developed countries, the first half of this book also provides a comprehensive summary of relevant rules, regulations, and the resulting safety performances. The systems in the UK, US and Hong Kong are described and contrasted, giving the reader an understanding of how different regulatory approaches have yielded a variety of results. From this solid introduction, specific problems observed in RMAA work are examined through case studies, with reference to the underlying cultural and demographic factors, and a variety of practical engineering and management solutions are explored. This important and practical international work is essential reading for postgraduate students of health and safety in construction, construction project management, or construction in developing countries, as well as policy-makers and construction project managers."--Publisher website