276 resultados para Buried infrastructure
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.
Resumo:
The Distributed Network Protocol v3.0 (DNP3) is one of the most widely used protocols to control national infrastructure. The move from point-to-point serial connections to Ethernet-based network architectures, allowing for large and complex critical infrastructure networks. However, networks and con- figurations change, thus auditing tools are needed to aid in critical infrastructure network discovery. In this paper we present a series of intrusive techniques used for reconnaissance on DNP3 critical infrastructure. Our algorithms will discover DNP3 outstation slaves along with their DNP3 addresses, their corresponding master, and class object configurations. To validate our presented DNP3 reconnaissance algorithms and demonstrate it’s practicality, we present an implementation of a software tool using a DNP3 plug-in for Scapy. Our implementation validates the utility of our DNP3 reconnaissance technique. Our presented techniques will be useful for penetration testing, vulnerability assessments and DNP3 network discovery.
Resumo:
There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.
Resumo:
A comprehensive study was conducted on potential systems of integrated building utilities and transport power solutions that can simultaneously contain rising electricity, hot water and personal transport costs for apartment residents. The research developed the Commuter Energy and Building Utilities System (CEBUS) and quantified the economic, social and environmental benefits of incorporating such a system in future apartment developments. A decision support tool was produced to assist the exploration of the CEBUS design variants. A set of implementation guidelines for CEBUS was also developed for the property development industry.
Resumo:
Field instrumentation of an in-service cast iron gas pipe buried in a residential area is detailed in this paper. The aim of the study was to monitor the long-term pipe behavior to understand the mechanisms of pipe bending in relation to ground movement as a result of seasonal fluctuation of soil moisture content. Field data showed that variation of soil temperature, suction, and moisture content are closely related to the prevailing climate. Change of soil temperature is generally related to the ambient air temperature, with a variation of approximately −3°C −3°C per meter depth from the ground surface in summer (decrease with depth) and winter (increase with depth). Seasonal cyclic variation in moisture content was observed with maxima in February and March, and a minimum around September. The pipe top was under tensile strain during summer and subsequently subjected to compressive strain as soil swelling occurred as a result of increase in moisture content. The study suggests that downward pipe bending occurs in summer because of soil shrinkage, while upward pipe bending occurs in winter when the soil swells.
Resumo:
Construction firms that employ collaborative procurement approaches develop operating routines through joint learning so as to improve infrastructure project performance. This paper reports a study based on a survey sample of 320 construction practitioners which were involved in collaborative infrastructure delivery in Australia. The study developed valid and reliable scales for measuring collaborative learning capability (CLC), and used the scales to evaluate the CLC of contractor and consultant firms within the sample. The evaluation suggests that whilst these firms explore knowledge from both internal and external sources, transform both explicit and tacit knowledge, and apply and internalise new knowledge, they can improve the extent to which these routines are applied to optimise project performance.