410 resultados para Expansion decision
Resumo:
Guardianship laws in most Western societies provide decision-making mechanisms for adults with impaired capacity. Since the inception of these laws, the principle of autonomy and recognition of human rights for those coming within guardianship regimes has gained prominence. A new legal model has emerged, which seeks to incorporate ‘assisted decision-making’ models into guardianship laws. Such models legally recognise that an adult’s capacity may be maintained through assistance or support provided by another person, and provide formal recognition of the person in that ‘assisting’ role. This article situates this latest legal innovation within a historical context, examining the social and legal evolution of guardianship laws and determining whether modern assisted decision-making models remain consistent with guardianship reform thus far. It identifies and critically analyses the different assisted decision-making models which exist internationally. Finally, it discusses a number of conceptual, legal and practical concerns that remain unresolved. These issues require serious consideration before assisted decisionmaking models are adopted in guardianship regimes in Australia.
Resumo:
We study the difference in the result of two different risk elicitation methods by linking estimates of risk attitudes to gender, age, personality traits, a decision in a dilemma situation, and physiological states measured by heart rate variability (HRV). Our results indicate that differences between the methods can partly be explained by gender, but not by personality traits. Furthermore, HRV is linked to risktaking in the experiment for at least one of the methods, indicating that more stressed individuals display more risk aversion. Finally, we and that risk attitudes are not predictive of the ability to decide in a dilemma, but personality traits are. Surprisingly, there is also no apparent relationship between the physiological state during the dilemma situation and the ability to make a decision.
Resumo:
Australia lacks a satisfactory, national paradigm for assessing competence and capacity in the context of testamentary, enduring power of attorney and advance care directive documents. Competence/capacity assessments are currently conducted on an ad hoc basis by legal and/or medical professionals. The reliability of the assessment process is subject to the skill set and mutual understanding of the legal and/or medical professional conducting the assessment. There is a growth in the prevalence of diseases such as dementia. Such diseases impact upon cognition which increasingly necessitates collaboration between the legal and medical professions when assessing the effect of mentally disabling conditions upon competency/capacity. Miscommunication and lack of understanding between legal and medical professionals involved could impede the development of a satisfactory paradigm. A qualitative study seeking the views of legal and medical professionals who practise in this area has been conducted. This incorporated surveys and interviews of 10 legal and 20 medical practitioners. Some of the results are discussed here. Practitioners were asked whether there is a standard approach and whether national guidelines were desirable. There was general agreement that uniform guidelines for the assessment of competence/capacity would be desirable. The interviews also canvassed views as to the state of the relationship between the professions. The results of the empirical research support the hypothesis that relations between the professions could be improved. The development of a national paradigm would promote consistency and transparency of process, helping to improve the professional relationship and maximising the principles of autonomy, participation and dignity.
Resumo:
Geographical market expansion is included in various definitions of entrepreneurship as it entails the opening up of new markets (for example, Davidsson 2003). Expansion into new international markets and launch of new products in international markets are also consistent with definitions of entrepreneurship which center on the pursuit of opportunities {e.g.\Stevenson, 1983 #922;Gartner, 1993 #931}. Accordingly, the decision by managers of small, internationally active businesses to continue to internationalize can be viewed as an entrepreneurial act. In spite of the fact that both start-ups and existing firms can behave entrepreneurially by expanding into new international markets, the attention of entrepreneurship researchers interested in international activities has largely focused on international new ventures (INVs); that is, business organizations that internationalize from inception (Oviatt, and McDougall 1994; Oviatt, and McDougall 1997). Consequently, pursuit of international opportunities by established small and medium-sized enterprises (SMEs) lacks theoretical understanding and empirical investigation through an entrepreneurship lens. This paper contributes to the body of knowledge at the entrepreneurship-internationalization interface by testing whether Stevenson’s opportunity-based conceptualization of entrepreneurial management (Stevenson 1983; Stevenson and Gumpert 1985; Stevenson and Jarillo 1990) can explain the attainment of continued entrepreneurial outcomes by SMEs operating in foreign markets. We choose Stevenson’s conceptualization as it gauges firm-level characteristics that are theorized to facilitate the pursuit of entrepreneurial opportunities, which arguably is at the heart of SMEs’ continued venturing into international markets.
Resumo:
Sweden’s protest against the Vietnam War was given tangible form in 1969 through the decision to give economic aid to the Government of North Vietnam. The main outcome was an integrated pulp and paper mill in the Vinh Phu Province north-west of Hanoi. Known as Bai Bang after its location, the mill became the most costly, one of the longest lasting and the most controversial project in the history of Swedish development cooperation. In 1996 Bai Bang produced at its full capacity. Today the mill is exclusively managed and staffed by the Vietnamese and there are plans for future expansion. At the same time a substantial amount of money has been spent to reach these achievements. Looking back at the cumbersome history of the project the results are against many’s expectations. To learn more about the conditions for sustainable development Sida commissioned two studies of the Bai Bang project. Together they touch upon several important issues in development cooperation over a period of almost 30 years: the change of aid paradigms over time, the role of foreign policy in development cooperation, cultural obstacles, recipient responsibility versus donor led development etc. The two studies were commissioned by Sida’s Department for Evaluation and Internal Audit which is an independent department reporting directly to Sida’s Board of Directors. One study assesses the financial and economic viability of the pulp and paper mill and the broader development impact of the project in Vietnam. It has been carried out by the Centre for International Economics, an Australian private economic research agency. The other study analyses the decision-making processes that created and shaped the project over a period of two decades, and reflects on lessons from the project for development cooperation in general. This study has been carried out by the Chr. Michelsen Institute, a Norweigan independent research institution.
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
This research investigates the decision making process of individuals from revealed preferences in extreme environments or life-and-death situations, from a behavioral economics perspective. The empirical analysis of revealed behavioral preferences shows how the individual decision making process can deviate from the standard self-interested or “homo economicus” model in non-standard situations. The environments examined include: elite athletes in FIFA World and Euro Cups; climbing on Everest and the Himalaya; communication during 9/11 and risk seeking after the 2011 Brisbane floods. The results reveal that the interaction of culture and environment has a significant impact on the decision process, as social behaviors and institutions are intimately intertwined, which govern the processes of human behavior and interaction. Additionally, that risk attitudes are not set and that immediate environmental factors can induce a significant shift in an individuals risk seeking behaviors.
Resumo:
Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.
Resumo:
Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.
Resumo:
Multi-Objective optimization for designing of a benchmark cogeneration system known as CGAM cogeneration system has been performed. In optimization approach, the thermoeconomic and Environmental aspects have been considered, simultaneously. The environmental objective function has been defined and expressed in cost terms. One of the most suitable optimization techniques developed using a particular class of search algorithms known as; Multi-Objective Particle Swarm Optimization (MOPSO) algorithm has been used here. This approach has been applied to find the set of Pareto optimal solutions with respect to the aforementioned objective functions. An example of fuzzy decision-making with the aid of Bellman-Zadeh approach has been presented and a final optimal solution has been introduced.
Resumo:
Today, the majority of semiconductor fabrication plants (fabs) conduct equipment preventive maintenance based on statistically-derived time- or wafer-count-based intervals. While these practices have had relative success in managing equipment availability and product yield, the cost, both in time and materials, remains high. Condition-based maintenance has been successfully adopted in several industries, where costs associated with equipment downtime range from potential loss of life to unacceptable affects to companies’ bottom lines. In this paper, we present a method for the monitoring of complex systems in the presence of multiple operating regimes. In addition, the new representation of degradation processes will be used to define an optimization procedure that facilitates concurrent maintenance and operational decision-making in a manufacturing system. This decision-making procedure metaheuristically maximizes a customizable cost function that reflects the benefits of production uptime, and the losses incurred due to deficient quality and downtime. The new degradation monitoring method is illustrated through the monitoring of a deposition tool operating over a prolonged period of time in a major fab, while the operational decision-making is demonstrated using simulated operation of a generic cluster tool.
Resumo:
Background The expansion of cell colonies is driven by a delicate balance of several mechanisms including cell motility, cell-to-cell adhesion and cell proliferation. New approaches that can be used to independently identify and quantify the role of each mechanism will help us understand how each mechanism contributes to the expansion process. Standard mathematical modelling approaches to describe such cell colony expansion typically neglect cell-to-cell adhesion, despite the fact that cell-to-cell adhesion is thought to play an important role. Results We use a combined experimental and mathematical modelling approach to determine the cell diffusivity, D, cell-to-cell adhesion strength, q, and cell proliferation rate, ?, in an expanding colony of MM127 melanoma cells. Using a circular barrier assay, we extract several types of experimental data and use a mathematical model to independently estimate D, q and ?. In our first set of experiments, we suppress cell proliferation and analyse three different types of data to estimate D and q. We find that standard types of data, such as the area enclosed by the leading edge of the expanding colony and more detailed cell density profiles throughout the expanding colony, does not provide sufficient information to uniquely identify D and q. We find that additional data relating to the degree of cell-to-cell clustering is required to provide independent estimates of q, and in turn D. In our second set of experiments, where proliferation is not suppressed, we use data describing temporal changes in cell density to determine the cell proliferation rate. In summary, we find that our experiments are best described using the range D = 161 - 243 ?m2 hour-1, q = 0.3 - 0.5 (low to moderate strength) and ? = 0.0305 - 0.0398 hour-1, and with these parameters we can accurately predict the temporal variations in the spatial extent and cell density profile throughout the expanding melanoma cell colony. Conclusions Our systematic approach to identify the cell diffusivity, cell-to-cell adhesion strength and cell proliferation rate highlights the importance of integrating multiple types of data to accurately quantify the factors influencing the spatial expansion of melanoma cell colonies.
Resumo:
Using a quasi-natural voting experiment encompassing a 160-year period (1848–2009) in Switzerland, we investigate whether a higher level of complexity leads to increased reliance on trusted parliamentary representatives. We find that when more referenda are held on the same day, constituents are more likely to refer to parliamentary recommendations when making their decisions. This finding holds true even when we narrow our focus to referenda with a relatively lower voter turnout on days on which more than one referendum is held. We also demonstrate that when constituents face a higher level of complexity, they follow the parliamentary recommendations rather than those of interest groups. "Viewed as a geometric figure, the ant’s path is irregular, complex, hard to describe. But its complexity is really a complexity in the surface of the beach, not a complexity in the ant." ([1] p. 51)