515 resultados para Construction management


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to explore the process, and analyse the implementation of constructability improvement and innovation result during the planning and design for sea water intake structure of fertilizer plant project. Design/methodology/approach The research methodology approach is case study method at project level. This constructability improvement process was investigated by using constructability implementation check lists, direct observation, documented lesson learned analysis and key personnel interviews. Findings The case study shows that the implementation of constructability during planning and design stage for this sea water intake structure has increased the project performance as well as improved the schedule by 5 months (14.21%) and reduced the project cost by 15.35%. Research limitations/implications This case study was limited to three (3) previous sea water intake projects as references and one (1) of new method sea water intake structure at fertilizer plant project. Practical implications A constructability improvement check list using theory and lesson learned for the specific construction project was documented. Originality/value The findings support the relevant study of constructability and provide specific lesson learned for three (3) previous project and one (1) of the new innovation method of the construction project and documented by the company.

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Project selection is a decision-making process that is not merely influenced by technical aspects but also by the people who involved in the process. Organisational culture is described as a set of values and norms that are shared by people within the organisation that affects the way they interact with each other and with stakeholders from outside the organisation. The aim of this paper is to emphasize the importance of organisational culture on improving the quality of decisions in the project selection process, in addition to the influence of technical aspects of a project. The discussion is based on an extensive literature review and, as such, represents the first part of a research agenda investigating the impact of organisational culture on the project selection process applicable specifically to road infrastructure contracts. Four existing models of organisational culture (Denison 1990; Cameron and Quinn 2006; Hofstede 2001; Glaser et al 1987) are discussed and reviewed in view of their use in the larger research project to investigate the impact of culture on identified critical elements of decision-making. An understating of the way organisational culture impacts on project selection will increase the likelihood in future of relevant government departments selecting projects that achieve their stated organisational goals.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sustainability concerns every citizen. Housing affordability and sustainable solutions are being highlighted in research and practice in many parts of the world. This paper discusses the development of a Commuter Energy and Building Utilities System (CEBUS) in sustainable housing projects as a means of bridging the gap between current median house pricing and target affordable house pricing for low income earners. Similar scales of sustainable housing development cannot be achieved through independent application of current best practice methods in ecologically sustainable development strategies or transit oriented development master plans. This paper presents the initial stage of research on first capital and ongoing utilities and transport cost savings available from these sustainable design methods. It also outlines further research and development of a CEBUS Dynamic Simulation Model and Conceptual Framework for the Australian property development and construction industry.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

campaign to oppose projects proposed in their local community. The social constructionist perspective advocates that these motivations are driven by activists’ interpretation of reality, such that activists will assign multiple meanings to and frame environmental issues in a way that reflects their view of reality. Past research suggest that these are also influenced by patterns of shared meaning and interpretation that develop over time in protest movements that shape activists’ perceptions of the environmental risks and impacts associated with construction activity. This paper explores the role of gender distinctions in shaping perceptions of environmental risk and how this affects their framing of the environmental, social, cultural/ historical impacts associated with a construction project. Using Snow and Benford’s (1988) 3-prong analytical tool for framing: diagnostic framing, prognostic framing and motivational framing, this paper presents findings from the content analysis of in-depth interviews of 24 activists protesting against a highly controversial housing project in the greater Sydney metropolitan area. The research adopts a single case study approach, and is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24-hour community picket in Australia.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Using a thematic story telling approach which draws on ethnographic method, a grounded theory of protest movement continuity is presented. The grounded theory draws from theories and activist stories relating to the facilitative role of movement networks, social contagion theory and the cultural experience of activism. It highlights the contagious influence of protest networks in maintaining protest continuity over time and how this leads to common perceptions of development risk and opportunity within communities. It also reveals how communities use collective values and identity, social capital, emotional dynamics and symbolic artifacts to maintain protest continuity.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Local communities are vulnerable to the potential environmental risks associated with construction activity. Currently, little is understood about how perceptions of environmental risks are shaped and spread within a community. A better understanding of this process can help bridge the gap between developers and communities and bring about more sustainable development practices. This paper reports a research methodology which uses social contagion theory to investigate this process. The research adopts a single case study approach of a highly controversial housing project in the greater Sydney metropolitan area. The case study is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24 hour community picket in the New South Wales.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The widespread development of Decision Support System (DSS) in construction indicate that the evaluation of software become more important than before. However, it is identified that most research in construction discipline did not attempt to assess its usability. Therefore, little is known about the approach on how to properly evaluate a DSS for specific problem. In this paper, we present a practical framework that can be guidance for DSS evaluation. It focuses on how to evaluate software that is dedicatedly designed for consultant selection problem. The framework features two main components i.e. Sub-system Validation and Face Validation. Two case studies of consultant selection at Malaysian Department of Irrigation and Drainage were integrated in this framework. Some inter-disciplinary area such as Software Engineering, Human Computer Interaction (HCI) and Construction Project Management underpinned the discussion of the paper. It is anticipated that this work can foster better DSS development and quality decision making that accurately meet the client’s expectation and needs

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.