321 resultados para software management infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Women undergoing Cesarean Section (CS) are vulnerable to the adverse effects associated with perioperative core temperature drop, in part due to the tendency for CS to be performed under neuraxial anesthesia, blood and fluid loss, and vasodilation. Inadvertent perioperative hypothermia (IPH) is a common condition that affects patients undergoing surgery of all specialties and is detrimental to all age groups, including neonates. Previous systematic reviews on IPH prevention largely focus on either adult or all ages populations, and have mainly overlooked pregnant or CS patients as a distinct group. Not all recommendations made by systematic reviews targeting all adult patients may be transferable to CS patients. Alternative, effective methods for preventing or managing hypothermia in this group would be valuable. Objectives To synthesize the best available evidence in relation to preventing and/or treating hypothermia in mothers after CS surgery. Types of participants Adult patients over the age of 18 years, of any ethnic background, with or without co-morbidities, undergoing any mode of anesthesia for any type of CS (emergency or planned) at healthcare facilities who have received interventions to limit or manage perioperative core heat loss were included. Types of intervention(s) Active or passive warming methods versus usual care or placebo, that aim to limit or manage core heat loss as applied to women undergoing CS were included. Types of studies Randomized controlled trials (RCTs) that met the inclusion criteria, with reduction of perioperative hypothermia a primary or secondary outcome were considered. Types of outcomes Primary outcome: maternal core temperature measured during the preoperative, intraoperative and postoperative phases of care Secondary outcomes: newborn core temperature at birth, umbilical pH obtained immediately after birth, Apgar scores, length of Post Anesthetic Care Unit (PACU) stay, maternal thermal comfort. Search strategy A comprehensive search was undertaken of the following databases from their inception until May 2012: ProQuest, Web of Science, Scopus, Dissertation and Theses PQDT (via ProQuest), Current Contents, CENTRAL, Mednar, OpenGrey, Clinical Trials. There were no language restrictions. Methodological quality Retrieved papers were assessed for methodological quality by two independent reviewers prior to inclusion using JBI software. Disagreements were resolved via consultation with the third reviewer. An assessment of quality of the included papers was also made in relation to five key quality factors. Data collection Two independent reviewers extracted data from the included papers using a previously piloted customized data extraction tool. Results 12 studies with a combined total of 719 participants were included. Three broad intervention groups were identified; intravenous (IV) fluid warming, warming devices, leg wrapping. IV fluid warming, whether administered intraoperatively or preoperatively, was found to be effective at maintaining maternal (but not neonatal) temperature and preventing shivering, but does not improve thermal comfort. The effectiveness of IV fluid warming on Apgar scores and umbilical pH remains unclear. Warming devices, including forced air warming and under body carbon polymer mattresses, were effective at preventing hypothermia and reduced shivering, however were most effective if applied preoperatively. The effectiveness of warming devices to improve thermal comfort remains unclear. Preoperative forced air warming appears to aid maintenance of neonatal temperature, while intraoperative forced air warming does not. Forced air warming was not effective at improving Apgar scores and the effects for umbilical pH remain unclear. Conclusions Intravenous fluid warming, by any method, improves maternal temperature and reduces shivering for women undergoing CS. Preoperative body warming devices also improve maternal temperature, in addition to reducing shivering.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Between mid 2010 and early 2013, Queensland road related infrastructures were devastated by flood and cyclone related natural disasters. Responding to these recent events and in preparing for more regular and intense climate-change induced events in future, the Queensland Government is now reviewing how post-disaster road infrastructure recovery projects are planned and delivered. In particular, there is awareness that rebuilding such infrastructure need sustainable strategies across economic, environmental and social dimensions. A comprehensive sustainability assessment framework for pre and post disaster situations can minimize negative impact on our communities, economy and environment. This research is underway to develop a comprehensive sustainability element frame work for post disaster management in road infrastructures in Queensland, Australia. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of natural disasters. This research can contribute to strategic planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes in Queensland. Within this context, this paper provides an overview of the qualitative mixed-method research approach involving literature reviews and case studies to explore and evaluate a number of sustainability elements with a view to develop operational strategies for disaster recovery road projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is only in recent years that the critical role that spatial data can play in disaster management and strengthening community resilience has been recognised. The recognition of this importance is singularly evident from the fact that in Australia spatial data is considered as soft infrastructure. In the aftermath of every disaster this importance is being increasingly strengthened with state agencies paying greater attention to ensuring the availability of accurate spatial data based on the lessons learnt. For example, the major flooding in Queensland during the summer of 2011 resulted in a comprehensive review of responsibilities and accountability for the provision of spatial information during such natural disasters. A high level commission of enquiry completed a comprehensive investigation of the 2011 Brisbane flood inundation event and made specific recommendations concerning the collection of and accessibility to spatial information for disaster management and for strengthening community resilience during and after a natural disaster. The lessons learnt and processes implemented were subsequently tested by natural disasters during subsequent years. This paper provides an overview of the practical implementation of the recommendations of the commission of enquiry. It focuses particularly on the measures adopted by the state agencies with the primary role for managing spatial data and the evolution of this role in Queensland State, Australia. The paper concludes with a review of the development of the role and the increasing importance of spatial data as an infrastructure for disaster planning and management which promotes the strengthening of community resilience.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an illustrative demonstration of the qualitative data analysis tool NVivo (version 2.0), as employed across a multi-method research design as a comprehensive tool in support of overall research management. The paper will be of interest to (a) novice researchers, as a reference in their research design efforts; (b) academics, involved in research training, where this narrative can be used as a rich teaching case and; potentially to (c) vendors, of similar software tools, who may identify potential new tool applications and valuable tool enhancements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Agent-based modelling (ABM), like other modelling techniques, is used to answer specific questions from real world systems that could otherwise be expensive or impractical. Its recent gain in popularity can be attributed to some degree to its capacity to use information at a fine level of detail of the system, both geographically and temporally, and generate information at a higher level, where emerging patterns can be observed. This technique is data-intensive, as explicit data at a fine level of detail is used and it is computer-intensive as many interactions between agents, which can learn and have a goal, are required. With the growing availability of data and the increase in computer power, these concerns are however fading. Nonetheless, being able to update or extend the model as more information becomes available can become problematic, because of the tight coupling of the agents and their dependence on the data, especially when modelling very large systems. One large system to which ABM is currently applied is the electricity distribution where thousands of agents representing the network and the consumers’ behaviours are interacting with one another. A framework that aims at answering a range of questions regarding the potential evolution of the grid has been developed and is presented here. It uses agent-based modelling to represent the engineering infrastructure of the distribution network and has been built with flexibility and extensibility in mind. What distinguishes the method presented here from the usual ABMs is that this ABM has been developed in a compositional manner. This encompasses not only the software tool, which core is named MODAM (MODular Agent-based Model) but the model itself. Using such approach enables the model to be extended as more information becomes available or modified as the electricity system evolves, leading to an adaptable model. Two well-known modularity principles in the software engineering domain are information hiding and separation of concerns. These principles were used to develop the agent-based model on top of OSGi and Eclipse plugins which have good support for modularity. Information regarding the model entities was separated into a) assets which describe the entities’ physical characteristics, and b) agents which describe their behaviour according to their goal and previous learning experiences. This approach diverges from the traditional approach where both aspects are often conflated. It has many advantages in terms of reusability of one or the other aspect for different purposes as well as composability when building simulations. For example, the way an asset is used on a network can greatly vary while its physical characteristics are the same – this is the case for two identical battery systems which usage will vary depending on the purpose of their installation. While any battery can be described by its physical properties (e.g. capacity, lifetime, and depth of discharge), its behaviour will vary depending on who is using it and what their aim is. The model is populated using data describing both aspects (physical characteristics and behaviour) and can be updated as required depending on what simulation is to be run. For example, data can be used to describe the environment to which the agents respond to – e.g. weather for solar panels, or to describe the assets and their relation to one another – e.g. the network assets. Finally, when running a simulation, MODAM calls on its module manager that coordinates the different plugins, automates the creation of the assets and agents using factories, and schedules their execution which can be done sequentially or in parallel for faster execution. Building agent-based models in this way has proven fast when adding new complex behaviours, as well as new types of assets. Simulations have been run to understand the potential impact of changes on the network in terms of assets (e.g. installation of decentralised generators) or behaviours (e.g. response to different management aims). While this platform has been developed within the context of a project focussing on the electricity domain, the core of the software, MODAM, can be extended to other domains such as transport which is part of future work with the addition of electric vehicles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The advances made within the aviation industry over the past several decades have significantly improved the availability, affordability and convenience of air travel and have been greatly beneficial in both social and economic terms. Air transport has developed into an irreplaceable service being relied on by millions of people each day and as such airports have become critical elements of national infrastructure to facilitate the movement of people and goods. As components of critical infrastructure (CI), airports are integral parts of a national economy supporting regional as well as national trade, commercial activity and employment. Therefore, any disruption or crisis which impacts the continuity of operations at airports can have significant negative consequences for the airport as a business, for the local economy and other nodes of transport infrastructure as well as for society. Due to the highly dynamic and volatile environment in which airports operate in, the aviation industry has faced many different challenges over the years ranging from terrorist attacks such as September 11, to health crises such as the SARS epidemic to system breakdowns such as the recent computer system outage at Virgin Blue Airlines in Australia. All these events have highlighted the vulnerability of airport systems to a range of disturbances as well as the gravity and widespread impact of any kind of discontinuity in airport functions. Such incidents thus emphasise the need for increasing resilience and reliability of airports and ensuring business continuity in the event of a crisis...

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The policies and regulations governing the practice of state asset management have emerged as an urgent question among many countries worldwide for there is heightened awareness of the complex and crucial role that state assets play in public service provision. Indonesia is an example of such country, introducing a ‘big-bang’ reform in state asset management laws, policies, regulations, and technical guidelines. Indonesia exemplified its enthusiasm in reforming state asset management policies and practices through the establishment of the Directorate General of State Assets in 2006. The Directorate General of State Assets have stressed the new direction that it is taking state asset management laws and policies through the introduction of Republic of Indonesia Law Number 38 Year 2008, which is an amended regulation overruling Republic of Indonesia Law Number 6 Year 2006 on Central/Regional Government State Asset Management. Law number 38/2008 aims to further exemplify good governance principles and puts forward a ‘the highest and best use of assets’ principle in state asset management. The purpose of this study is to explore and analyze specific contributing influences to state asset management practices, answering the question why innovative state asset management policy implementation is stagnant. The methodology of this study is that of qualitative case study approach, utilizing empirical data sample of four Indonesian regional governments. Through a thematic analytical approach this study provides an in-depth analysis of each influencing factors to state asset management reform. Such analysis suggests the potential of an ‘excuse rhetoric’; whereby the influencing factors identified are a smoke-screen, or are myths that public policy makers and implementers believe in, as a means to ex-plain stagnant implementation of innovative state asset management practice. Thus this study offers deeper insights of the intricate web that influences state as-set management innovative policies to state asset management policy makers; to be taken into consideration in future policy writing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Providing mobility corridors for communities, enabling freight networks to transport goods and services, and a pathway for emergency services and disaster relief operations, roads are a vital component of our societal system. In the coming decades, a number of modern issues will face road agencies as a result of climate change, resource scarcity and energy related challenges that will have implications for society. To date, these issues have been discussed on a case by case basis, leading to a fragmented approach by state and federal agencies in considering the future of roads – with potentially significant cost and risk implications. Within this context, this paper summarises part of a research project undertaken within the ‘Greening the Built Environment’ program of the Sustainable Built Environment National Research Centre (SBEnrc, Australia), which identified key factors or ‘trends’ affecting the future of roads and key strategies to ensure that road agencies can continue to deliver road infrastructure that meets societal needs in an environmentally appropriate manner. The research was conducted over two years, including a review of academic and state agency literature, four stakeholder workshops in Western Australia and Queensland, and industry consultation. The project was supported financially and through peer review and contribution, by Main Roads Western Australia, QLD Department of Transport and Main Roads, Parsons Brinckerhoff, John Holland Group, and the Australian Green Infrastructure Council (AGIC). The project highlighted several potential trends that are expected to affect road agencies in the future, including predicted resource and materials shortages, increases in energy and natural resources prices, increased costs related to greenhouse gas emissions, changing use and expectations of roads, and changes in the frequency and intensity of weather events. Exploring the implications of these potential futures, the study then developed a number of strategies in order to prepare transport agencies for the associated risks that such trends may present. An unintended outcome of the project was the development of a process for enquiring into future scenarios, which will be explored further in Stage 2 of the project (2013-2014). The study concluded that regardless of the type and scale of response by the agency, strategies must be holistic in approach, and remain dynamic and flexible.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis investigated both the potential for Business Continuity Management to enhance organisational reliability, and appropriate levels of Business Continuity Management capability resident in a number of Australian international and regional airports. Findings indicated that a host of regulatory and business processes including Business Continuity Management can assist in creating reliability in aviation infrastructure systems in Australia. Further, the thesis developed a multi-level maturity assessment framework for defining the depth of implementation of Business Continuity Management capabilities in airports, along with other recommendations to improve functional reliability of airport operations.