731 resultados para security model


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic Small and micro-enterprises are believed to play a significant part in economic growth and poverty allevition in developing countries. However, there are a range of issues that arise when looking at the support required for local enterprise development, the role of micro finance and sustainability. This paper explores the issues associated with the establishment and resourcing of micro-enterprise develoment and proposes a model of sustainable support of enterprise development in very poor developing economies, particularly in Africa. The purpose of this paper is to identify and address the range of issues raised by the literature and empirical research in Africa, regarding micro-finance and small business support, and to develop a model for sustainable support for enterprise development within a particular cultural and economic context. Micro-finance has become big business with a range of models - from those that operate on a strictly business basis to those that come from a philanthropic base. The models used grow from a range of philosophical and cultural perspectives. Entrepreneurship training is provided around the world. Success is often measured by the number involved and the repayment rates - which are very high, largely because of the lending models used. This paper will explore the range of options available and propose a model that can be implemented and evaluated in rapidly changing developing economies. Methodology/Key Propositions The research draws on entrepreneurial and micro-finance literature and empirical research undertaken in Mozambique, which lies along the Indian ocean sea border of Southern Africa. As a result of war and natural disasters over a prolonged period, there is little industry, primary industries are primitive and there is virtually no infrastructure. Mozambique is ranked as one of the poorest countries in the world. The conditions in Mozambique, though not identical, reflect conditions in many other parts of Africa. A numebr of key elements in the development of enterprises in poor countries are explored including: Impact of micro-finance Sustainable models of micro-finance Education and training Capacity building Support mechanisms Impact on poverty, families and the local economy Survival entrepreneurship versus growth entrepreneurship Transitions to the formal sector. Results and Implications The result of this study is the development of a model for providing intellectual and financial resources to micro-entrepreneurs in poor developing countries in a sustainable way. The model provides a base for ongoing research into the process of entrepreneurial growth in African developing economies. The research raises a numeber of issues regarding sustainability including the nature of the donor/recipient relationship, access to affordable resources, the impact of individual entrepreneurial activity on the local economny and the need for ongoing research to understand the whole process and its impact, intended and unintended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report documents work carried out in order to develop and prove a model for predicting the lifetime of painted metal components, with a particular emphasis on Colorbond® due to its prominent use throughout Australia. This work continues on from previous developments reported in 2002-059-B No. 12 [1]. Extensions of work included the following research: (1) Experimental proving of the leaching of chromate inhibitors from Colorbond® materials. (2) Updated models for the accumulation of salts and the time of wetness for gutters, based upon field observations. (3) Electrochemical Impedance Spectroscopy investigations aimed at correlating the corrosion rates of weathered Colorbond® with those predicted by modeling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Collaborative Cohort Model (CCM) for research supervision was developed and piloted as an alternative to the Apprentice Master Model (AMM), which is currently used with most doctoral dissertations. The CCM was developed in response to concerns about completion rates and the quality of research supervision. The feedback from the initial cohort of doctoral students who have experienced the model is presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper will report on the evaluation of a new undergraduate legal workplace unit, LWB421 Learning in Professional Practice. LWB421 was developed in response to the QUT’s strategic planning and a growing view that work experience is essential to developing the skills that law graduates need in order to be effective legal practitioners (Stuckey, 2007). Work integrated learning provides a context for students to develop their skills, to see the link between theory and practice and support students in making the transition from university to practice (Shirley, 2006). The literature in Australian legal education has given little consideration to the design of legal internship subjects (as distinct from legal clinic programs). Accordingly the design of placement subjects needs to be carefully considered to ensure alignment of learning objectives, learning tasks and assessment. Legal placements offer students the opportunity to develop their professional skills in practice, reflect on their own learning and job performance and take responsibility for their career development and planning. This paper will examine the literature relating to the design of placement subjects, particularly in a legal context. It will propose a collaborative model to facilitate learning and assessment of legal work placement subjects. The basis of the model is a negotiated learning contract between the student, workplace supervisor and academic supervisor. Finally the paper will evaluate the model in the context of LWB421. The evaluation will be based on data from surveys of students and supervisors and focus group sessions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The adoption of e-business by Small and Medium Enterprises (SMEs) in construction lags from other service and product businesses within the building sector. This paper develops a model to facilitate the uptake of electronic business, especially in relation to SMEs within the Australian construction sector. Ebusiness is defined here as “the undertaking of business-related transactions, communications and information exchanges utilising electronic medium and environment”, the elicited model highlights significant changes needed including skills development, social, economic and cultural issues. The model highlights barriers for SMEs to migrate towards e-transactions, e-bidding, e-tendering and ecollaboration and provides learning and skills development components. The model is derived from case study fieldwork and is to inform diffusion and awareness models for best practice. Empirical techniques included ‘focus group’ interviews and one to one ‘interviews’. Data was transcribed and analysed using cluster analyses. Preliminary results reveal that current models for e-business adoption are not effective within the construction context as they have emerged from other service and product industries - such as retail or tourism. These generic models have largely ignored the nature of the construction industry, and some modifications appears to be required. This paper proposes an alternative adoption model which is more sensitive to the nature of the industry – particularly for e-business uptake in building SME’s.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an extended case-based reasoning model that addresses the notion of situatedness in designing through constructive memory. The model is illustrated through an application for predicting the corrosion rate for a specific material on a specific building.