535 resultados para architectural determinism


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design for the Gladstone Sustainable Home was an invited commission which contributed to the Queenland Governments Smart and Sustainable Homes Program, a legacy borne out of the 2004 Year of the Built Environment. The Sustainable Homes Program involved the partnering of the Queensland Government and Design/Building industry to promote and engage with sustainable housing. The Gladstone Sustainable Home incorporated 3 principles of sustainability - social, economic and environmental, and is listed within the Government Sustainable Homes website.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

What is the secret mesmerism that death possesses and under the operation of which a modern architect – strident, confident, resolute – becomes rueful, pessimistic, or melancholic?1 Five years before Le Corbusier’s death at sea in 1965, the architect reluctantly agreed to adopt the project for L’Église Saint-Pierre de Firminy in Firminy-Vert (1960–2006), following the death of its original architect, André Sive, from leukemia in 1958.2 Le Corbusier had already developed, in 1956, the plan for an enclave in the new “green” Firminy town, which included his youth and culture center and a stadium and swimming pool; the church and a “boîte à miracles” near the youth center were inserted into the plan in the ’60s. (Le Corbusier was also invited, in 1962, to produce another plan for three Unités d’Habitation outside Firminy-Vert.) The Saint-Pierre church should have been the zenith of the quartet (the largest urban concentration of works by Le Corbusier in Europe, and what the architect Henri Ciriani termed Le Corbusier’s “acropolis”3) but in the early course of the project, Le Corbusier would suffer the diocese’s serial objections to his vision for the church – not unlike the difficulties he experienced with Notre Dame du Haut at Ronchamp (1950–1954) and the resistance to his proposed monastery of Sainte-Marie de la Tourette (1957–1960). In 1964, the bishop of Saint-Étienne requested that Le Corbusier relocate the church to a new site, but Le Corbusier refused and the diocese subsequently withdrew from the project. (With neither the approval, funds, nor the participation of the bishop, by then the cardinal archbishop of Lyon, the first stone of the church was finally laid on the site in 1970.) Le Corbusier’s ambivalence toward the project, even prior to his quarrels with the bishop, reveals...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the late 1880s a pre-fabricated Japanese house was shipped from Kobe, Japan, to Brisbane, Australia, and erected in the up-market suburb of New Farm by Japanese tradesmen. This paper is developed from a broader project researching the life of G W Paul, the man who had the house built and subsequently lived in it for the remainder of his life. Paul’s motivation in importing the house represented a unique, but unfulfilled effort to develop a future, hybrid culture for Queensland. This effort took the form of a commercial venture to construct Japanese houses as desirable and climatically suitable dwellings. Against the backdrop of this ambition, this paper presents new research to elucidate and extend previous knowledge, assesses the reception of the house by its nineteenth century Brisbane audience, and considers possible reasons for the limited response which signalled the cancellation of the commercial venture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In a study aimed at better understanding how staff and students adapt to new blended studio learning environments (BSLE’s), a group of 165 second year architecture students at a large school of architecture in Australia were separated into two different design studio learning environments. 70% of students were allocated to a traditional studio design learning environment (TSLE) and 30% to a new, high technology embedded, prototype digital learning laboratory. The digital learning laboratory was purpose designed for the case-study users, adapted Student-Centred Active Learning Environment for Undergraduate Programs (SCALE-UP) principles, and built as part of a larger university research project. The architecture students attended the same lectures, followed the same studio curriculum and completed the same pieces of assessment; the only major differences were the teaching staff and physical environment within which the studios were conducted. At the end of the semester, the staff and students were asked to complete a questionnaire about their experiences and preferences within the two respective learning environments. Following this, participants were invited to participate in focus groups, where a synergistic approach was effected. Using a dual method qualitative approach, the questionnaire and survey data were coded and extrapolated using both thematic analysis and grounded theory methodology. The results from these two different approaches were compared, contrasted and finally merged, to reveal six distinct emerging themes, which were instrumental in offering resistance or influencing adaptation to, the new BLSE. This paper reports on the study, discusses the major contributors to negative resistance and proposes points for consideration, when transitioning from a TSLE to a BLSE.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is a review of painter Andrzej Zielinski's exhibition at gallery 9 in Sydney. It highlights the artist's expressionistic style and strong colour sense as well as his association with American painterly traditions. The artist application of acrylic modelling paste and his paintings also gives them a sculptural and architectural dimension, and on a conceptual level play with notions of mimesis and material form.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introduction Buildings, which account for approximately half of all annual energy and greenhouse gas emissions, are an important target area for any strategy addressing climate change. Whilst new commercial buildings increasingly address sustainability considerations, incorporating green technology in the refurbishment process of older buildings is technically, financially and socially challenging. This research explores the expectations and experiences of commercial office building tenants, whose building was under-going green refurbishment. Methodology Semi-structured in-depth interviews with seven residents and neighbours of a large case-study building under-going green refurbishment in Melbourne, Australia. Built in 1979, the 7,008m² ‘B’ grade building consists of 11 upper levels of office accommodation, ground floor retail, and a basement area leased as a licensed restaurant. After refurbishment, which included the installation of chilled water pumps, solar water heating, waterless urinals, insulation, disabled toilets, and automatic dimming lights, it was expected that the environmental performance of the building would move from a non-existent zero ABGR (Australian Building Greenhouse Rating) star rating to 3.5 stars, with a 40% reduction in water consumption and 20% reduction in energy consumption. Interviews were transcribed, with responses analysed using a thematic approach, identifying categories, themes and patterns. Results Commercial property tenants are on a journey to sustainability - they are interested and willing to engage in discussions about sustainability initiatives, but the process, costs and benefits need to be clear. Critically, whilst sustainability was an essential and non-negotiable criterion in building selection for government and larger corporate tenants, sustainability was not yet a core business value for smaller organisations – whilst they could see it as an emerging issue, they wanted detailed cost-benefit analyses, pay-back calculations of proposed technologies and, ideally, wished they could trial the technology first-hand in some way. Although extremely interested in learning more, most participants reported relatively minimal knowledge of specific sustainability features, designs or products. In discussions about different sustainable technologies (e.g., waterless urinals, green-rated carpets), participants frequently commented that they knew little about the technology, had not heard of it or were not sure exactly how it worked. Whilst participants viewed sustainable commercial buildings as the future, they had varied expectations about the fate of existing older buildings – most felt that they would have to be retrofitted at some point to meet market expectations and predicted the emergence of a ‘non-sustainability discount’ for residing in a building without sustainable features. Discussion This research offers a beginning point for understanding the difficulty of integrating green technology in older commercial buildings. Tenants currently have limited understandings of technology and potential building performance outcomes, which ultimately could impede the implementation of sustainable initiatives in older buildings. Whilst the commercial property market is interested in learning about sustainability in the built environment, the findings highlight the importance of developing a strong business case, communication and transition plan for implementing sustainability retrofits in existing commercial buildings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research explores the quality and importance of the physical environment of two early learning centres on the Sunshine Coast in Queensland, utilising qualitative interviews with parents (n=4) and educators (n=4) to understand how design might impact on children’s development and a quantitative rating (the Early Childhood Physical Environment Rating Scale; ECPERS) to assess the quality of the physical built environment and infrastructure. With an average ECPERS quality rating, thematic analysis of the interviews revealed that educators and parents viewed the physical environment as important to a child’s development, although the quality of staff was predominant. Early learning centres should be ‘homely’, inviting, bright and linked to the outdoors, with participants describing how space “welcomes the child, makes them feel safe and encourages learning”. Four key themes characterised views: Emotional Connection (quality of staff and physical environment), Experiencing Design (impact of design on child development), Hub for Community Integration (relationships and resources) and Future Vision (ideal physical environment, technology and ratings). With participants often struggling to clearly articulate their thoughts on design issues, a collaborative and jargon-free approach to designing space is required. These findings will help facilitate discussion about the role and design of the physical environment in early childhood centres, with the tangible examples of ‘ideal space’ enhancing communication between architects and educators about how best to design and reconfigure space to enhance learning outcomes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The University of Queensland has recently established a new design-focused, studio-based computer science degree. The Bachelor of Information Environments degree augments the core courses from the University's standard CS degree with a stream of design courses and integrative studio-based projects undertaken every semester. The studio projects integrate and reinforce learning by requiring students to apply the knowledge and skills gained in other courses to open-ended real-world design projects. The studio model is based on the architectural studio and involves teamwork, collaborative learning, interactive problem solving, presentations and peer review. This paper describes the degree program, its curriculum and rationale, and reports on experiences in the first year of delivery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Emerging from the challenge to reduce energy consumption in buildings is a need for research and development into the more effective use of simulation as a decision-support tool. Despite significant research, persistent limitations in process and software inhibit the integration of energy simulation in early architectural design. This paper presents a green star case study to highlight the obstacles commonly encountered with current integration strategies. It then examines simulation-based design in the aerospace industry, which has overcome similar limitations. Finally, it proposes a design system based on this contrasting approach, coupling parametric modelling and energy simulation software for rapid and iterative performance assessment of early design options.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The reinvention of existing housing stock to suit current and future needs within the suburban beachside context was the contextual background for this project. Adaptation, consolidation, understanding and reinterpretation of existing and potential architectural possibilities were demonstrated in this work to enhance the discussion and perceptions of value through enhancement of the existing suburban fabric.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

X + Y has attitude, enigma and re-establishes a venue drenched in a Valley persona etched over seven decades and surrounded by bars of a new generation. This is a bar without judgement, dress codes and without absolute refinement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A more considered approach to existing housing stock on highly desirable lots is the more sustainable option of adaptation as opposed to demolition particularly if the designed outcome demonstrates flexible, liveable and affordable space that capitalizes on the infrastructure and location.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a need for decision support tools that integrate energy simulation into early design in the context of Australian practice. Despite the proliferation of simulation programs in the last decade, there are no ready-to-use applications that cater specifically for the Australian climate and regulations. Furthermore, the majority of existing tools focus on achieving interaction with the design domain through model-based interoperability, and largely overlook the issue of process integration. This paper proposes an energy-oriented design environment that both accommodates the Australian context and provides interactive and iterative information exchanges that facilitate feedback between domains. It then presents the structure for DEEPA, an openly customisable system that couples parametric modelling and energy simulation software as a means of developing a decision support tool to allow designers to rapidly and flexibly assess the performance of early design alternatives. Finally, it discusses the benefits of developing a dynamic and concurrent performance evaluation process that parallels the characteristics and relationships of the design process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a growing need for parametric design software that communicates building performance feedback in early architectural exploration to support decision-making. This paper examines how the circuit of design and analysis process can be closed to provide active and concurrent feedback between architecture and services engineering domains. It presents the structure for an openly customisable design system that couples parametric modelling and energy analysis software to allow designers to assess the performance of early design iterations quickly. Finally, it discusses how user interactions with the system foster information exchanges that facilitate the sharing of design intelligence across disciplines.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Emerging from the challenge to reduce energy consumption in buildings is the need for energy simulation to be used more effectively to support integrated decision making in early design. As a critical response to a Green Star case study, we present DEEPA, a parametric modeling framework that enables architects and engineers to work at the same semantic level to generate shared models for energy simulation. A cloud-based toolkit provides web and data services for parametric design software that automate the process of simulating and tracking design alternatives, by linking building geometry more directly to analysis inputs. Data, semantics, models and simulation results can be shared on the fly. This allows the complex relationships between architecture, building services and energy consumption to be explored in an integrated manner, and decisions to be made collaboratively.