733 resultados para Urban Plan


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The public transport corridor bordering the study site runs NW to SE and is perceived as a source of noise and pollution. The key urban planning strategies adopted by this team were: • Acoustic separation from transport corridor noise source, • A regular grid pattern of urban blocks, and • A clear hierarchy of accessible open space throughout the development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The case study site is physically disconnected from its surrounding community by the rail corridor and future bus lanes and is unlikely to be able to sustain its own commercial retail centre. As a result, it may also be socially disconnected from surrounding suburbs. However, it does offer proximity and access to an extensive „natural‟ area, and this is seen as key opportunity for the proposed development to develop a strong relationship with surrounding suburbs...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Subtropical Design Handbook for Planners is primarily intended to provide advice in developing planning schemes to achieve the South East Queensland Regional Plan’s vision. This calls for ‘development which is sustainable and well-designed, and where the subtropical character of the region is recognised and reinforced’.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On the case study site, using these strategies, the site density achieved was approximately 180 dwellings per hectare. According to ASK consulting engineers‟ acoustic report (in Ecolateral‟s report) the design gives solid consideration to the environmental noise issues associated with the site. The subject structure not only provides significant shielding of transport corridor noise to the suburb, it also minimises the potential for adverse impact on residential amenity within the building itself...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Malaysian urban river corridors are facing major physical transformations in the 21st century. The effects of rapid development exacerbated by the competition between two key industry sectors, commercial base and tourism development in conjunction with urbanisation and industrialisation, have posted a high demand for the uses of these spaces. The political scenario and lack on consideration of ecological principles in its design solution have sparked stiff environmental and cultural constraint towards its landscape character as well as the ecological system. Therefore, a holistic approach towards improving the landscape design processes is extremely necessary to protect values of these places. Limited research has been carried out and further has created an urgent need to explore better ways to improve the landscape design processes of Malaysian urban river corridor developments that encompass the needs and aspirations of its multi-ethnic society without making any drastic changes to the landscape character of the rivers. This paper provides a brief introduction to address this significant gap and hence serves to contribute to the literature review.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The draft Year 1 Literacy and Numeracy Checkpoints Assessments were in open and supported trial during Semester 2, 2010. The purpose of these trials was to evaluate the Year 1 Literacy and Numeracy Checkpoints Assessments (hereafter the Year 1 Checkpoints) that were designed in 2009 as a way to incorporate the use of the Year 1 Literacy and Numeracy Indicators as formative assessment in Year 1 in Queensland Schools. In these trials there were no mandated reporting requirements. The processes of assessment were related to future teaching decisions. As such the trials were trials of materials and the processes of using those materials to assess students, plan and teach in year 1 classrooms. In their current form the Year 1 Checkpoints provide assessment resources for teachers to use in February, June and October. They aim to support teachers in monitoring children's progress and making judgments about their achievement of the targeted P‐3 Literacy and Numeracy Indicators by the end of Year 1 (Queensland Studies Authority, 2010 p. 1). The Year 1 Checkpoints include support materials for teachers and administrators, an introductory statement on assessment, work samples, and a Data Analysis Assessment Record (DAAR) to record student performance. The Supported Trial participants were also supported with face‐to‐face and on‐line training sessions, involvement in a moderation process after the October Assessments, opportunities to participate in discussion forums as well as additional readings and materials. The assessment resources aim to use effective early years assessment practices in that the evidence is gathered from hands‐on teaching and learning experiences, rather than more formal assessment methods. They are based in a model of assessment for learning, and aim to support teachers in the “on‐going process of determining future learning directions” (Queensland Studies Authority, 2010 p. 1) for all students. Their aim is to focus teachers on interpreting and analysing evidence to make informed judgments about the achievement of all students, as a way to support subsequent planning for learning and teaching. The Evaluation of the Year 1 Literacy and Numeracy Checkpoints Assessments Supported Trial (hereafter the Evaluation) aimed to gather information about the appropriateness, effectiveness and utility of the Year 1 Checkpoints Assessments from early years’ teachers and leaders in up to one hundred Education Queensland schools who had volunteered to be part of the Supported Trial. These sample schools represent schools across a variety of Education Queensland regions and include schools with:  - A high Indigenous student population; - Urban, rural and remote school locations; - Single and multi‐age early phase classes; - A high proportion of students from low SES backgrounds. The purpose of the Evaluation was to: Evaluate the materials and report on the views of school‐based staff involved in the trial on the process, materials, and assessment practices utilised. The Evaluation has reviewed the materials, and used surveys, interviews, and observations of processes and procedures to collect relevant data to help present an informed opinion on the Year 1 Checkpoints as assessment for the early years of schooling. Student work samples and teacher planning and assessment documents were also collected. The evaluation has not evaluated the Year 1 Checkpoints in any other capacity than as a resource for Year 1 teachers and relevant support staff.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In December 2006, the Engineering and Technology Group of Queensland’s Department of Main Roads entered into a three-year skid resistance management research project with QUT Faculty of Built Environment and Engineering researchers and the QUT-based CRC for Integrated Engineering Asset Management (CIEAM). CIEAM undertakes a broad range of asset management research in the areas of defence, utilities, transportation and industrial processes. “The research project is an important activity of Main Roads’ Skid Resistance Management Plan published in June 2006.” said Main Roads project leader Mr Justin Weligamage. “The intended project output is a decision-support model for use by Road Asset Managers throughout a road network. The research objective is to enable road asset managers to better manage the surfacing condition of the road asset with specific focus on skid resistance,” said QUT project leader Professor Arun Kumar. The research project will review existing skid resistance investigatory levels, develop a risk-based method to establish skid resistance investigatory levels and improve the decision support methodology in order to minimise crashes. The new risk-based approach will be used to identify locations on the Queensland state-controlled road network that may have inadequate skid resistance. Once a high risk site is identified, the appropriate remedial action will be decided on. This approach will allow road asset managers to target optimal remedial actions, reducing the incidence and severity of crashes where inadequate skid resistance is a contributing cause.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vehicular traffic in urban areas may adversely affect urban water quality through the build-up of traffic generated semi and non volatile organic compounds (SVOCs and NVOCs) on road surfaces. The characterisation of the build-up processes is the key to developing mitigation measures for the removal of such pollutants from urban stormwater. An in-depth analysis of the build-up of SVOCs and NVOCs was undertaken in the Gold Coast region in Australia. Principal Component Analysis (PCA) and Multicriteria Decision tools such as PROMETHEE and GAIA were employed to understand the SVOC and NVOC build-up under combined traffic scenarios of low, moderate, and high traffic in different land uses. It was found that congestion in the commercial areas and use of lubricants and motor oils in the industrial areas were the main sources of SVOCs and NVOCs on urban roads, respectively. The contribution from residential areas to the build-up of such pollutants was hardly noticeable. It was also revealed through this investigation that the target SVOCs and NVOCs were mainly attached to particulate fractions of 75 to 300 µm whilst the redistribution of coarse fractions due to vehicle activity mainly occurred in the >300 µm size range. Lastly, under combined traffic scenario, moderate traffic with average daily traffic ranging from 2300 to 5900 and average congestion of 0.47 was found to dominate SVOC and NVOC build-up on roads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The effects of rapid development have increased pressures on these places exacerbated by the competition between two key industry sectors, commercial base and tourism development. This, in supplement with urbanisation and industrialisation, has posted a high demand for the uses of these spaces. The political scenario and lack of adaptation on ecological principles and public participations in its design approach have sparked stiff environmental, historical and cultural constraint towards its landscape character as well as the ecological system. Therefore, a holistic approach towards improving the landscape design process is extremely necessary to protect human well being, cultural, environmental and historical values of these places. Limited research also has been carried out to overcome this situation. This further has created an urgent need to explore better ways to improve the landscape design process of Malaysian heritage urban river corridor developments that encompass the needs and aspirations of the Malaysian multi-ethnic society without making any drastic changes to the landscape character of the rivers. This paper presents a methodology to develop an advanced Landscape Character Assessment (aLCA) framework for evaluating the landscape character of the places, derived from the perception of two keys yet oppositional stakeholders: urban design team and special interest public. The triangulation of subjectivist paradigm methodologies: the psychophysical approach; the psychological approach; and, the phenomenological approach will be employed. The outcome will be used to improve the present landscape design process for future development of these places. Unless a range of perspectives can be brought to bear on enhancing the form and function of their future development and management, urban river corridors in the Malaysian context will continue to decline.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Geant4 based simulation tool has been developed to perform Monte Carlo modelling of a 6 MV VarianTM iX clinac. The computer aided design interface of Geant4 was used to accurately model the LINAC components, including the Millenium multi-leaf collimators (MLCs). The simulation tool was verified via simulation of standard commissioning dosimetry data acquired with an ionisation chamber in a water phantom. Verification of the MLC model was achieved by simulation of leaf leakage measurements performed using GafchromicTM film in a solid water phantom. An absolute dose calibration capability was added by including a virtual monitor chamber into the simulation. Furthermore, a DICOM-RT interface was integrated with the application to allow the simulation of treatment plans in radiotherapy. The ability of the simulation tool to accurately model leaf movements and doses at each control point was verified by simulation of a widely used intensity-modulated radiation therapy (IMRT) quality assurance (QA) technique, the chair test.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Countless factors affect the inner workings of a city, so in an attempt to gain an understanding of place and making sound decisions, planners need to utilize decision support systems (DSS) or planning support systems (PSS). PSS were originally developed as DSS in academia for experimental purposes, but like many other technologies, they became one of the most innovative technologies in parallel to rapid developments in software engineering as well as developments and advances in networks and hardware. Particularly, in the last decade, the awareness of PSS have been dramatically heightened with the increasing demand for a better, more reliable and furthermore a transparent decision-making process (Klosterman, Siebert, Hoque, Kim, & Parveen, 2003). Urban planning as an act has quite different perspective from the PSS point of view. The unique nature of planning requires that spatial dimension must be considered within the context of PSS. Additionally, the rapid changes in socio-economic structure cannot be easily monitored or controlled without an effective PSS.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, with the impact of the global knowledge economy, a more comprehensive urban development approach, so called 'knowledge-based urban development', has gained significant popularity. This paper discusses the critical connections among knowledge-based urban development strategies, knowledge-intensive industries and information and communication technology infrastructures. In particular, the research focuses on investigating the application of the knowledge-based urban development concept by discussing one of the South East Asia's large scale knowledge-based urban development manifestations of Malaysia's Multimedia Super Corridor. The paper scrutinises Malaysia's experience in the development and evolution of the Multimedia Super Corridor from the angle of knowledge-based urban development policy implementation, infrastructural implications, and actors involved in its development and management. This paper provides a number of lessons learned from the Multimedia Super Corridor on the orchestration of knowledge-based development that is a necessity for cities seeking successful knowledge city and knowledge economy transformations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Urban water quality can be significantly impaired by the build-up of pollutants such as heavy metals and volatile organics on urban road surfaces due to vehicular traffic. Any control strategy for the mitigation of traffic related build-up of heavy metals and volatile organic pollutants should be based on the knowledge of their build-up processes. In the study discussed in this paper, the outcomes of a detailed experiment investigation into build-up processes of heavy metals and volatile organics are presented. It was found that traffic parameters such as average daily traffic, volume over capacity ratio and surface texture depth had similar strong correlations with the build-up of heavy metals and volatile organics. Multicriteria decision analyses revealed that the 1 - 74 um particulate fraction of total suspended solids (TSS) could be regarded as a surrogate indicator for particulate heavy metals in build-up and this same fraction of total organic carbon could be regarded as a surrogate indicator for particulate volatile organics build-up. In terms of pollutants affinity, TSS was found to be the predominant parameter for particulate heavy metals build-up and total dissolved solids was found to be the predominant parameter for he potential dissolved particulate fraction in heavy metals build-up. It was also found that land use did not play a significant role in the build-up of traffic generated heavy metals and volatile organics.