342 resultados para Grant funded projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

10,000 Steps Rockhampton is a multi-strategy health promotion program which aims to develop sustainable community-based strategies to increase physical activity.The central coordinating focus of the project is the use of pedometers to raise awareness of and provide motivation for physical activity, around the theme of '10,000 steps/day - Every step counts.' To date, five key strategies have been implemented: (1) a media-based awareness raising campaign; (2) promotion of physical activity by health professionals; (3) improving social support for physical activity through group-based programs; (4) working with local council to improve environmental support for physical activity, and; (5) establishment of a ‘micro-grants’ fund to which community groups could apply for assistance with small, innovative physical activity enhancing projects. Strategies were introduced on a rolling basis beginning in February 2002 with 'layering' of interventions designed to address the multi-level individual social and environmental determinants of physical activity. The project was quasi-experimental in design, involving collection of baseline and two year follow-up data from community based surveys in Rockhampton and in a matched regional Queensland town. In August 2001,the baseline CATI survey (N=1281)found that 47.9% of men and 33.0% of women were meeting the national guidelines for physical activity. In August 2002, a smaller survey (N=400) found an increase in activity levels among women (39.7% active) but not in men (48.5%). Data from the two year follow up survey, to be conducted in August 2003, will be presented, with discussion of the major successes and challenges of this landmark physical activity intervention. Acknowledgement: This project is supported by a grant from Health Promotion Queensland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

10,000 Steps Rockhampton is a multi-strategy health promotion program which aims to develop sustainable community-based strategies to increase physical activity.The central coordinating focus of the project is the use of pedometers to raise awareness of and provide motivation for physical activity, around the theme of '10,000 steps/day - Every step counts.' To date, five key strategies have been implemented: (1) a media-based awareness raising campaign; (2) promotion of physical activity by health professionals; (3) improving social support for physical activity through group-based programs; (4) working with local council to improve environmental support for physical activity, and; (5) establishment of a ‘micro-grants’ fund to which community groups could apply for assistance with small, innovative physical activity enhancing projects. Strategies were introduced on a rolling basis beginning in February 2002 with 'layering' of interventions designed to address the multi-level individual social and environmental determinants of physical activity. The project was quasi-experimental in design, involving collection of baseline and two year follow-up data from community based surveys in Rockhampton and in a matched regional Queensland town. In August 2001,the baseline CATI survey (N=1281)found that 47.9% of men and 33.0% of women were meeting the national guidelines for physical activity. In August 2002, a smaller survey (N=400) found an increase in activity levels among women (39.7% active) but not in men (48.5%). Data from the two year follow up survey, to be conducted in August 2003, will be presented, with discussion of the major successes and challenges of this landmark physical activity intervention. Acknowledgement: This project is supported by a grant from Health Promotion Queensland

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public engagement is an essential process for major municipal infrastructure and construction projects as it serves to identify the interests and concerns of citizens before the planning and design are finalised and thus ensures the schemes are beneficial to all sectors of the community. However, the success of public engagement depends on a number of factors, not least the suitability of the engagement methods used, representativeness and activeness of participants, time pressure, financial constraint and so on. In Hong Kong, the community has experienced discontent with several major projects recently, suggesting the need to examine the effectiveness of its current public engagement mechanism. This paper reports the results of a series of interviews with a variety of stakeholders – indicating the need for a carefully considered public engagement plan to be established at the beginning to drive the process and more experienced people to lead and facilitate the engagement process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose My aim is to introduce, in the project management field, an Aristotelian ethics lens moving beyond the classical deontological and consequentialism approaches underlying the current ethical practices and codes of ethics and professional conducts. In doing so, I wish to pose the premises of a debate on the implications of a conscious ethical perspective for the structure and agency relationship within the project management field Design/methodology/approach Project management is a knowledge field on its own right. However the current perspectives applied to make sense and develop the field (modernism vs. postmodernism) leads to dichotomous thinking rather than recognizing the merits and contextual validity of both sides. I call for Aristotelian Ethics as a way of moving beyond this dichotomous thinking. I introduce briefly Aristotelian Ethics and its consequences in term of relation theory – practice, means and ends, facts and values, and finally politics (i.e. being part of a community of practitioners). Then I illustrate some consequences for the field taking PMI Code of Ethics and Professional Conduct and APM Code of Professional Conduct as supports for discussion Findings I suggest a need for revisiting and/or redesigning the codes of ethics and professional conducts for project management according to an Aristotelian perspective, in order to move beyond the normative limitations of classical deontological (conflict between competing duties, exemplified by PMI Code) or consequentialism (focusing on the "right" outcome to the detriment of duties, exemplified by APM Code) approaches (both, in fact, leading to a disconnection means and ends, and facts and values). This implicates shifting our view from the question "what is my duty?" to the questions "why should I undertake my duty?" and "how ought I act in this situation?" Practical implications Raising Professional Bodies, Industry and Education institutions awareness and consciousness and leading them to rethink about codes of ethics and the implications for the way they conceive practice and research, bodies of knowledge, credentialing, education... Originality/value To the best of my knowledge, this kind of discussion has not yet been conducted within the project management field, and considering the implication of project management in our life and for the well being of the society, an ethical debate may present some value(s)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a post-disaster environment, housing reconstruction projects frequently face enormous difficulties due to the various, often apparently ill-considered, internal and external factors. Non-Governmental Organisations (NGOs) operating in post-disaster settings such as in Afghanistan continue to face blame over the failure of reconstruction projects, and worse, they are sometimes even viewed as being corrupt entities. While it is not always possible for NGOs to eliminate or reduce the impact of factors that are outside their control, they certainly can increase the chances of project success by placing considerable emphasis on working more effectively with the affected communities. To achieve maximum community participation in reconstruction projects , this research develops a specific logical framework to guide the process of community participation in post-disaster housing reconstruction in Afghanistan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State and local governments frequently look to flagship cultural projects to improve the city image and catalyze tourism but, in the process, often overlook their potential to foster local arts development. To better understand this role, the article examines if and how cultural institutions in Los Angeles and San Francisco attract and support arts-related activity. The analysis reveals that cultural flagships have mixed success in generating arts-based development and that their ability may be improved through attention to the local context, facility and institutional characteristics, and the approach of the sponsoring agencies. Such knowledge is useful for planners to enhance their revitalization efforts, particularly as the economic development potential of arts organizations and artists has become more apparent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Occupational segregation is a major source of labour market rigidity and economic inefficiency due to a waste of human resources. Organisations are repeatedly recognised as gendered constructs exhibiting sustained work segregation, income and status inequality, as well as cultural and individual images of gender, and these are perpetuated through their processes, practices and pressures (Acker, 1990). A large percentage of Australia’s workforce is now employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. For a continued strong performance in this economy, organisations that employ project personnel will need to consider how they address inclusivity and equality in diversity in project based temporary organisations to ensure the supply of high quality project professionals into the future. This paper investigates the inclusion processes experienced and exercised by men and women working in temporary organisations in project situations through a review of reports on the inclusion processes experienced by 60 project managers and project workers in three project based industries in Australia. Results indicate that temporary organisations are not implementing equality and diversity management strategies at the macro level and project workers are accepting this lack of recognition. However inclusivity and equality at the micro level of the team is seen as vital.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A collection of design projects accepted for exhibition at the 2013 ACSA Fall Conference.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.