578 resultados para Fashion Industry
Resumo:
In this chapter I look at the question of design and ethics in a situation where design as a set of related economic practices has been re-positioned as a key identifier for a new kind of ideas-driven industry - the creative industries. Previously marginal to cultural policy in the form of applied arts, in the creative industries agenda design became a privileged meeting place, or indeed broker, for art and industry, economy and commerce. I explore the new kinds of ethical challenges this brings.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
A significant reduction in carbon emissions is a global mission and the construction industry has an indispensable role to play as a major carbon dioxide (CO2) generator. Over the years, various building environmental assessment (BEA) models and concepts have been developed to promote environmentally responsible design and construction. However, limited attention has been placed on assessing and benchmarking the carbon emitted throughout the lifecycle of building facilities. This situation could undermine the construction industry’s potential to reduce its dependence on raw materials, recognise the negative impacts of producing new materials, and intensify the recycle and reuse process. In this paper, current BEA approaches adopted by the construction industry are first introduced. The focus of these models and concepts is then examined. Following a brief review of lifecycle analysis, the boundary in which a lifecycle carbon emission analysis should be set for a construction project is identified. The paper concludes by highlighting the potential barriers of applying lifecycle carbon emissions analysis in the construction industry. It is proposed that lifecycle carbon emission analysis can be integrated with existing BEA models to provide a more comprehensive and accurate evaluation on the cradle-to-grave environmental performance of a construction facility. In doing so, this can assist owners and clients to identify the optimum solution to maximise emissions reduction opportunities.
Resumo:
Project management in the construction industry involves coordination of many tasks and individuals, affected by complexity and uncertainty, which increases the need for efficient cooperation. Procurement is crucial since it sets the basis for cooperation between clients and contractors. This is true whether the project is local, regional or global in scope. Traditionally, procurement procedures are competitive, resulting in conflicts, adversarial relationships and less desirable project results. The purpose of this paper is to propose and empirically test an alternative procurement model based on cooperative procurement procedures that facilitates cooperation between clients and contractors in construction projects. The model is based on four multi-item constructs – incentive-based compensation, limited bidding options, partner selection and cooperation. Based on a sample of 87 client organisations, the model was empirically tested and exhibited strong support, including content, nomological, convergent and discriminant validity, as well as reliability. Our findings indicate that partner selection based on task related attributes mediates the relationship between two important pre-selection processes (incentive-based compensation and limited bid invitation) and preferred outcome of cooperation. The contribution of the paper is identifying valid and reliable measurement constructs and confirming a unique sequential order for achieving cooperation. Moreover, the findings are applicable for many types of construction projects because of the similarities in the construction industry worldwide.
Resumo:
Individuals, community organisations and industry have always been involved to varying degrees in efforts to address the Queensland road toll. Traditionally, road crash prevention efforts have been led by state and local government organisations. While community and industry groups have sometimes become involved (e.g. Driver Reviver campaign), their efforts have largely been uncoordinated and under-resourced. A common strength of these initiatives lies in the energy, enthusiasm and persistence of community-based efforts. Conversely, a weakness has sometimes been the lack of knowledge, awareness or prioritisation of evidence-based interventions or their capacity to build on collaborative efforts. In 2000, the Queensland University of Technology’s Centre for Accident Research and Road Safety – Queensland (CARRS-Q) identified this issue as an opportunity to bridge practice and research and began acknowledging a selection of these initiatives, in partnership with the RACQ, through the Queensland Road Safety Awards program. After nine years it became apparent there was need to strengthen this connection, with the Centre establishing a Community Engagement Workshop in 2009 as part of the overall Awards program. With an aim of providing community participants opportunities to see, hear and discuss the experiences of others, this event was further developed in 2010, and with the collaboration of the Queensland Department of Transport and Main Roads, the RACQ, Queensland Police Service and Leighton Contractors Pty Ltd, a stand-alone Queensland Road Safety Awards Community Engagement Workshop was held in 2010. Each collaborating organisation recognised a need to mobilise the community through effective information and knowledge sharing, and recognised that learning and discussion can influence lasting behaviour change and action in this often emotive, yet not always evidence-based, area. This free event featured a number of speakers representing successful projects from around Australia and overseas. Attendees were encouraged to interact with the speakers, to ask questions, and most importantly, build connections with other attendees to build a ‘community road safety army’ all working throughout Australia on projects underpinned by evaluated research. The workshop facilitated the integration of research, policy and grass-roots action enhancing the success of community road safety initiatives. For collaboration partners, the event enabled them to transfer their knowledge in an engaged approach, working within a more personal communication process. An analysis of the success factors for this event identified openness to community groups and individuals, relevance of content to local initiatives, generous support with the provision of online materials and ongoing communication with key staff members as critical and supports the view that the university can directly provide both the leadership and the research needed for effective and credible community-based initiatives to address injury and death on the roads.
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.
Resumo:
This thesis investigates profiling and differentiating customers through the use of statistical data mining techniques. The business application of our work centres on examining individuals’ seldomly studied yet critical consumption behaviour over an extensive time period within the context of the wireless telecommunication industry; consumption behaviour (as oppose to purchasing behaviour) is behaviour that has been performed so frequently that it become habitual and involves minimal intentions or decision making. Key variables investigated are the activity initialised timestamp and cell tower location as well as the activity type and usage quantity (e.g., voice call with duration in seconds); and the research focuses are on customers’ spatial and temporal usage behaviour. The main methodological emphasis is on the development of clustering models based on Gaussian mixture models (GMMs) which are fitted with the use of the recently developed variational Bayesian (VB) method. VB is an efficient deterministic alternative to the popular but computationally demandingMarkov chainMonte Carlo (MCMC) methods. The standard VBGMMalgorithm is extended by allowing component splitting such that it is robust to initial parameter choices and can automatically and efficiently determine the number of components. The new algorithm we propose allows more effective modelling of individuals’ highly heterogeneous and spiky spatial usage behaviour, or more generally human mobility patterns; the term spiky describes data patterns with large areas of low probability mixed with small areas of high probability. Customers are then characterised and segmented based on the fitted GMM which corresponds to how each of them uses the products/services spatially in their daily lives; this is essentially their likely lifestyle and occupational traits. Other significant research contributions include fitting GMMs using VB to circular data i.e., the temporal usage behaviour, and developing clustering algorithms suitable for high dimensional data based on the use of VB-GMM.
Resumo:
Unpacking the Entrepreneurial Process: A Step-by-Step Guide to a Successful Venture in the Entertainment Industry introduces a step-by-step guide to either students, entrepreneurs and intrapreneurs to fully understand the necessary steps to both unleash their entrepreneurial capabilities and to foster the development of new ones.
Resumo:
This paper draws on a major study the authors conducted for the Australian Government in 2009. It focuses on the diffusion issues surrounding the uptake of sustainable building and construction products in Australia. Innovative sustainable products can minimise the environmental impact during construction, while maximising asset performance, durability and re-use. However, there are significant challenges faced by designers and clients in the selection of appropriate sustainable products in consideration of the integrated design solution, including overall energy efficiency, water conservation, maintenance and durability, low-impact use and consumption. The paper is a review of the current state of sustainable energy and material product innovations in Australia. It examines the system dynamics surrounding these innovations as well as the drivers and obstacles to their diffusion throughout the Australian construction industry. The case product types reviewed comprise: solar energy technology, small wind turbines, advanced concrete technology, and warm-mixed asphalt. The conclusions highlight the important role played by Australian governments in facilitating improved adoption rates. This applies to governments in their various roles, but particularly as clients/owners, regulators, and investors in education, training, research and development. In their role as clients/owners, the paper suggests that government can better facilitate innovation within the construction industry by adjusting specification policies to encourage the uptake of sustainable products. In the role as regulators, findings suggest governments should be encouraging the application of innovative finance options and positive end-user incentives to promote sustainable product uptake. Also, further education for project-based firms and the client/end users about the long-term financial and environmental benefits of innovative sustainable products is required. As more of the economy’s resources are diverted away from business-as-usual and into the use of sustainable products, some project-based firms may face short-term financial pain in re-shaping their businesses. Government policy initiatives can encourage firms make the necessary adjustments to improve innovative sustainable product diffusion throughout the industry.
Resumo:
Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.
Resumo:
The Frock Paper Scissors magazine (and accompanying web site, www.frockpapersissors.com ) has been the focus of assessment in a Fashion and Style Journalism unit from 2006 to 2011 (current). The research has focused on the ways in which synergies across disciplines can be developed through student engagement on authentic projects (with a public audience). Up to 80 students from the Fashion Design, Journalism, Media Communication, Creative Industries, Business, Creative Writing and Communication Design discipline areas in the Creative Industries Faculty at Queensland University of Technology (QUT) work on the content, production, layout and funding for the Frock Paper Scissors magazine (and web site). Research focusses on how this authentic assessment task has been integrated into the classes; discussing the approaches taken by teaching staff, the challenges faced, and the ways in which student learning outcomes have been improved and their career outcomes enhanced. The final output requires staff to curate a professional hard copy fashion magazine(and website) where 5,000 copies are distributed annually throughout south east Queensland, Sydney, Melbourne, London, New York and Amsterdam.
Resumo:
The concept of ‘strategic dalliances’– defined as non-committal relationships that companies can ‘dip in and out of,’ or dally with, while simultaneously maintaining longer-term strategic partnerships with other firms and suppliers – has emerged as a promising strategy by which organizations can create discontinuous innovations. But does this approach work equally well for every sector? Moreover, how can these links be effectively used to foster the process of discontinuous innovation? Toward assessing the role that industry clockspeed plays in the success or failure of strategic dalliances, we provide case study evidence from Twister BV, an upstream oil and gas technology provider, and show that strategic dalliances can be an enabler for the discontinuous innovation process in slow clockspeed industries. Implications for research and practice are discussed, and conclusions from our findings are drawn.
Resumo:
Some evidence in the area of make-buy decisions for new technologies suggests that it is a good idea for a company to pursue a fairly rigorous ''make'' policy in the early days of a potentially disruptive innovation. Other studies prescribe exactly the opposite, promoting instead a ''buy'' strategy. This paper seeks to bridge the gap between these perspectives by suggesting that both strategies are valid, but that they are most successfully applied in different market environments. The ''make'' prescription may be more suited to either extremely fast or extremely slow rates of technological change, while a ''buy'' strategy might be more appropriate in market sectors where technologies evolve at a medium pace. This paper highlights the importance of industry clockspeed and supplier relationships in make-buy decisions for new technologies, and puts forward two new hypotheses that require empirical testing.