393 resultados para Construction Industry
Resumo:
This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.
Resumo:
This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.
Resumo:
The rate of water reform in Australia is gathering pace with Federal and State initiatives promoting a more integrated approach to water management. This approach encompasses a more competitive environment and a greater role for the private sector. There is a growing recognition of the importance of water recycling in these initiatives and the need to provide opportunities for its development. In March 2008 the Productivity Commission published its discussion paper on urban water reform (Productivity Commission, 2008). The paper cited inadequate institutional arrangements for the management of Australian urban water resources and noted the benefits to be gained from a comprehensive public review of urban water management. This development can be supported through the promotion of a sewer mining industry. This industry, offers flexible and innovative solutions to water recycling demands in a variety of situations and structures. In addition it has the capability of satisfying government competition and private sector policy initiatives.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.
Resumo:
In August 2005, House of Representatives Standing Committee on Environment and Heritage released the Sustainable Cities report. The Australian Sustainable Built Environment Council (ASBEC) wrote to the Committee endorsing Recommendations 1 to 3, and Recommendation 31. In particular Recommendation 31 states: The committee recommends that, with reference to the Swedish model of environmental objectives, the Australian Government:
Resumo:
As ‘The Architect’s Handbook of Professional Practice’ (cited by Riskus (2007) suggests, Building Information Modelling, or BIM, is “the use of virtual building information models to develop building design solutions, design documentation, and to analyse construction processes”. We would suggest such a definition, while useful, should be extended to include the operational phases of built assets (such as maintenance and decommissioning), and also be applied to the whole area of infrastructure. As a set of technologies, BIM holds promise to deliver benefits for the property, construction, and infrastructure management industries – particularly improved efficiencies and effectiveness through enhanced collaboration at all stages of the construction cycle. There are several important qualifiers, barriers, enablers, and some disadvantages with this suite of technologies. This report outlines the costs and benefits enablers and barriers associated with BIM, and makes suggestions about how these issues may be addressed.
Resumo:
In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.
Resumo:
Recent developments in networked three dimensional (3D) virtual worlds, and the proliferation of high bandwidth communications technology, have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a construction project in which the models for the project are developed and revised. The project investigates three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology. The third aspect of the project, listed above, led by the University of Newcastle, explores the domain of People and the extent to which they contribute to the effectiveness of virtual teams. This report relates, primarily, to this aspect.
Resumo:
Recent developments in networked three dimensional (3D) virtual worlds and the proliferation of high bandwidth communications technology have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a design/construction project in which models for a project are developed and revised. We have investigated three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology.
Resumo:
Current software tools for documenting and developing models of buildings focus on supporting a single user who is a specialist in the specific software used within their own discipline. Extensions to these tools for use by teams maintain the single discipline view and focus on version and file management. There is a perceived need in industry to have tools that specifically support collaboration among individuals from multiple disciplines with both a graphical representation of the design and a persistent data model. This project involves the development of a prototype of such a software tool. We have identified multi-user 3D virtual worlds as an appropriate software base for the development of a collaborative design tool. These worlds are inherently multi-user and therefore directly support collaboration through a sense of awareness of others in the virtual world, their location within the world, and provide various channels for direct and indirect communication. Such software platforms also provide a 3D building and modelling environment that can be adapted to the needs of the building and construction industry. DesignWorld is a prototype system for collaborative design developed by augmenting the Second Life (SL) commercial software platform1 with a collection web-based tools for communication and design. Agents manage communication between the 3D virtual world and the web-based tools. In addition, agents maintain a persistent external model of designs in the 3D world which can be augmented with data such as relationships, disciplines and versions not usually associated with 3D virtual worlds but required in design scenarios.
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
The application of Information and Communication Technology (ICT) in construction industry has been recognised widely by some practitioners and researchers for the last several years. During the 1990s the international construction industry started using with the increasing confidence information and communication technology. The use of e-mail became usual and web-sites were established for marketing purposes. Intranets and extranets were also established to facilitate communication within companies and throughout their branches. One of the important applications of the ICT in construction industry was the use of mobile computing devices to achieve better communication and data transmission between construction sites and offices.
Resumo:
Technology is continually changing, and evolving, throughout the entire construction industry; and particularly in the design process. One of the principal manifestations of this is a move away from team working in a shared work space to team working in a virtual space, using increasingly sophisticated electronic media. Due to the significant operating differences when working in shared and virtual spaces adjustments to generic skills utilised by members is a necessity when moving between the two conditions. This paper reports an aspect of a CRC-CI research project based on research of ‘generic skills’ used by individuals and teams when engaging with high bandwidth information and communication technologies (ICT). It aligns with the project’s other two aspects of collaboration in virtual environments: ‘processes’ and ‘models’. The entire project focuses on the early stages of a project (i.e. design) in which models for the project are being developed and revised. The paper summarises the first stage of the research project which reviews literature to identify factors of virtual teaming which may affect team member skills. It concludes that design team participants require ‘appropriate skills’ to function efficiently and effectively, and that the introduction of high band-width technologies reinforces the need for skills mapping and measurement.