255 resultados para -capped complex


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Innovation enables organisations to endure by responding to emergence and to improve efficiency. Innovation in a complex organisation can be difficult due to complexities contributing to slow decision-making. Complex projects fail due to an inability to respond to emergence which consumes finances and impacts on resources and organisational success. Therefore, for complex organisations to improve on performance and resilience, it would be advantageous to understand how to improve the management of innovation and thus, the ability to respond to emergence. The benefits to managers are an increase in the number of successful projects and improved productivity. This study will explore innovation management in a complex project based organisation. The contribution to the academic literature will be an in-depth, qualitative exploration of innovation in a complex project based organisation using a comparative case study approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the fields of organic electronics and biotechnology, applications for organic polymer thin films fabricated using low-temperature non-equilibrium plasma techniques are gaining significant attention because of the physical and chemical stability of thin films and the low cost of production. Polymer thin films were fabricated from non-synthetic terpinen-4-ol using radiofrequency polymerization (13.56 MHz) on low loss dielectric substrates and their permittivity properties were ascertained to determine potential applications for these organic films. Real and imaginary parts of permittivity as a function of frequency were measured using the variable angle spectroscopic ellipsometer. The real part of permittivity (k) was found to be between 2.34 and 2.65 in the wavelength region of 400–1100 nm, indicating a potential low-k material. These permittivity values were confirmed at microwave frequencies. Dielectric properties of polyterpenol films were measured by means of split post dielectric resonators (SPDRs) operating at frequencies of 10 GHz and 20 GHz. Permittivity increased for samples deposited at higher RF energy – from 2.65 (25 W) to 2.83 (75 W) measured by a 20-GHz SPDR and from 2.32 (25 W) to 2.53 (100 W) obtained using a 10-GHz SPDR. The error in permittivity measurement was predominantly attributed to the uncertainty in film thickness measurement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As for other complex diseases, linkage analyses of schizophrenia (SZ) have produced evidence for numerous chromosomal regions, with inconsistent results reported across studies. The presence of locus heterogeneity appears likely and may reduce the power of linkage analyses if homogeneity is assumed. In addition, when multiple heterogeneous datasets are pooled, inter-sample variation in the proportion of linked families (alpha) may diminish the power of the pooled sample to detect susceptibility loci, in spite of the larger sample size obtained. We compare the significance of linkage findings obtained using allele-sharing LOD scores (LOD(exp))-which assume homogeneity-and heterogeneity LOD scores (HLOD) in European American and African American NIMH SZ families. We also pool these two samples and evaluate the relative power of the LOD(exp) and two different heterogeneity statistics. One of these (HLOD-P) estimates the heterogeneity parameter alpha only in aggregate data, while the second (HLOD-S) determines alpha separately for each sample. In separate and combined data, we show consistently improved performance of HLOD scores over LOD(exp). Notably, genome-wide significant evidence for linkage is obtained at chromosome 10p in the European American sample using a recessive HLOD score. When the two samples are combined, linkage at the 10p locus also achieves genome-wide significance under HLOD-S, but not HLOD-P. Using HLOD-S, improved evidence for linkage was also obtained for a previously reported region on chromosome 15q. In linkage analyses of complex disease, power may be maximised by routinely modelling locus heterogeneity within individual datasets, even when multiple datasets are combined to form larger samples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Health and hospital system reforms prioritise efficiency. However, initiatives can impact on people with new or existing disabilities who require time to maximise functional independence. With greater demands for shorter hospital stays social workers face increasing pressure to facilitate discharge. This paper reports findings from research identifying factors contributing to extended stays for adults with disabilities. We sought to better understand patient characteristics and discharge planning challenges by analysing a clinical data set of 80 patients and qualitative interviews with five experienced hospital social workers. Three key factors are identified: issues around rehabilitation services; assessment and planning for community care; and availability of and access to discharge options. Strategies to reduce length of stay are reported. We argue that building collaborative partnerships and working across multiple, complex systems and disciplines are vital to ensure these patients access appropriate community-based resources within the current health reform environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work reports on the fabrication of a superhydrophobic nylon textile based on the organic charge transfer complex CuTCNAQ (TCNAQ = 11,11,12,12-tetracyanoanthraquinodimethane). The nylon fabric that is metallized with copper undergoes a spontaneous chemical reaction with TCNAQ dissolved in acetonitrile to form nanorods of CuTCNAQ that are intertwined over the entire surface of the fabric. This creates the necessary micro and nanoscale roughness that is required for the Cassie-Baxter state thereby achieving a superhydrophobic/superoleophilic surface without the need for a fluorinated surface. The material is characterised with SEM, FT-IR and XPS spectroscopy and investigated for its ability to separate oil and water in two modes, namely under gravity and as an absorbent. It is found that the fabric can separate dichloromethane, olive oil and crude oil from water and in fact reduce the water content of the oil during the separation process. The fabric is reusable and tolerant to conditions such as seawater, hydrochloric acid and extensive time periods on the shelf. Given that CuTCNAQ is a copper based semiconductor may also open up the possibility of other applications in areas such as photocatalysis and antibacterial applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public rental housing (PRH) projects are the mainstream of China's new affordable housing policies, and their integrated sustainability has a far-reaching effect on medium-low income families' well-being and social stability. However, there are few quantitative researches on the integrated sustainability of PRH projects. Our study tries to fill this gap through proposing an assessment model of the integrated sustainability for PRH projects. First, this paper defines what the sustainability of a PRH project is. Second, after constructing the sustainable system of a PRH project from the perspective of complex eco-system, the paper explores the internal operation mechanism and the coupling mechanism among the ecological, economic and social subsystems. Third, it identifies fourteen indices to represent the sustainability system of a PRH project, including six indices of ecological subsystem, five of economic subsystem and three of social subsystem. Fourth, it qualifies the weights of three subsystems and their internal representative indices. In addition, an assessment model is established through expert surveys and analytic network process (ANP). Finally, the paper carries out an empirical research on a PRH project in Nanjing city of China, followed by suggestions to enhance the integrated sustainability. The sustainability system and its evaluation model proposed in this paper are concise and easy to understand and can provide a theoretical foundation and a scientific basis for the evaluation and optimization of PRH projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Title insurance companies originating from America, have, in the past 15 years become part of the Australian conveyancing landscape. However for most residential freehold owners, their activities would be a mystery. A purchaser does not routinely obtain title insurance, with the companies presently focussing on servicing the mortgagee sector. While the lack of penetration in the residential purchaser market may be attributed to the consumer’s lack of knowledge, evidence from Ontario and New Zealand illustrates that title insurance is likely to become an additional cost in the conveyancing process in Australia. In this article we highlight the reasons why, and demonstrate how title insurers have, by working with the legal profession been able to subtly move the risk of responsibility for compensation for loss, (at least in the first instance) from the state to the insurer, but with the added benefit for the state and the conveyancing agents that the cost of the insurance is ultimately borne by the consumer. In New Zealand this development is being accelerated by the introduction of capped conveyancing title insurance. Whether title insurance will become part of the conveyancing process is no longer the relevant question for Australia, (it undoubtedly will), but the unknown issue is just how title insurance companies will work with conveyancing agents to infiltrate the market, and what response this infiltration will have in terms of the state’s view as to their continued role in the provision of assurance. We suggest that developments from New Zealand in relation to capped conveyancing insurance are likely to be replicated in Australia in the near future, and that the state’s role in providing an assurance fund will continue, though the state may seek to expand the areas in which the right to compensation is restricted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is a development of a methodology to predict the radio transmitter signal attenuation, via vertical density profiling of digitised objects, through the use of Light Detection and Ranging (LiDaR) measurements. The resulting map of indexed signal attenuation is useful for dynamic radio transmitter placement within the geospatial data set without expensive and tedious radio measurements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper will discuss the complexities of the role of contemporary dancer in this current epoch, with a particular focus on the multiple identities dancers embody within dance practice and how these accumulate to form a creative self-in-process or ‘moving identity’. Wider issues, such as training will be explored questioning how technical skills can be imparted alongside autonomous learning approaches to ensure that dancers are prepared to negotiate the entrepreneurial ecology of various dance sectors. Furthermore, the paper will examine the shifting relationship between choreographer and dancer from hierarchical to co-creative including how, in spite of the often collaborative nature of dance creation, the marketplace continues to celebrate the singular authorial position of the choreographer. Each of these elements will reflect back the complex issues of agency and creative self-hood that dancers must negotiate in an increasingly diverse and changeable arts environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Le Corbusier participated in an urban dialogue with the first group in France to call itself fascist: the journalist Georges Valois’s militant Faisceau des Combattants et Producteurs (1925-1927), the “Blue Shirts,” inspired by the Italian “Fasci” of Mussolini. Le Corbusier’s portrait photograph materialised on the front cover of the January 1927 issue of the Faisceau League’s newspaper Le Nouveau Siècle edited by the former anarcho-syndicalist journalist Georges Valois, its leader, who fashioned himself as the French Mussolini. Le Corbusier was described in the Revue as one of les animateurs (the “organisers”) of the Party1 – meaning a member of the technical elite who would drive the Faisceau’s plans. On 1 May 1927, the Nouveau Siècle printed a full-page feature “Le Plan Voisin” on Le Corbusier’s 1922 redesign of Paris : the architect’s single-point perspective sketch appeared below an extract lifted from the architect’s original polemic Le Centre de Paris on the pages of Le Corbusier’s second book Urbanisme published two years earlier, a treatise on urbanism.2 Three weeks later, Le Corbusier presented a slide show of his urban plans at a fascist rally for the inauguration of the Faisceau’s new headquarters on the rue du faubourg Poissonniere, thereby crystalising the architect’s hallowed status in the league...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this chapter we consider biosecurity surveillance as part of a complex system comprising many different biological, environmental and human factors and their interactions. Modelling and analysis of surveillance strategies should take into account these complexities, and also facilitate the use and integration of the many types of different information that can provide insight into the system as a whole. After a brief discussion of a range of options, we focus on Bayesian networks for representing such complex systems. We summarize the features of Bayesian networks and describe these in the context of surveillance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This workshop aims at discussing alternative approaches to resolving the problem of health information fragmentation, partially resulting from difficulties of health complex systems to semantically interact at the information level. In principle, we challenge the current paradigm of keeping medical records where they were created and discuss an alternative approach in which an individual's health data can be maintained by new entities whose sole responsibility is the sustainability of individual-centric health records. In particular, we will discuss the unique characteristics of the European health information landscape. This workshop is also a business meeting of the IMIA Working Group on Health Record Banking.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Palu Metamorphic Complex (PMC) is exposed in a late Cenozoic orogenic belt in NW Sulawesi, Indonesia. It is a composite terrane comprising a gneiss unit of Gondwana origin, a schist unit composed of meta-sediments deposited along the SE Sundaland margin in the Late Cretaceous and Early Tertiary, and one or more slivers of amphibolite with oceanic crust characteristics. The gneiss unit forms part of the West Sulawesi block underlying the northern and central sections of the Western Sulawesi Province. The presence of Late Triassic granitoids and recycled Proterozoic zircons in this unit combined with its isotopic signature suggests that the West Sulawesi block has its origin in the New Guinea margin from which it rifted in the late Mesozoic. It docked with Sundaland sometime during the Late Cretaceous. U–Th–Pb dating results for monazite suggest that another continental fragment may have collided with the Sundaland margin in the earliest Miocene. High-pressure (HP) and ultrahigh-pressure (UHP) rocks (granulite, peridotite, eclogite) are found as tectonic slices within the PMC, mostly along the Palu–Koro Fault Zone, a major strike-slip fault that cuts the complex. Mineralogical and textural features suggest that some of these rocks resided at depths of 60–120 km during a part of their histories. Thermochronological data (U–Th–Pb zircon and 40Ar/39Ar) from the metamorphic rocks indicate a latest Miocene to mid-Pliocene metamorphic event, which was accompanied by widespread granitoid magmatism and took place in an extensional tectonic setting. It caused recrystallization of, and new overgrowths on, pre-existing zircon crystals, and produced andalusite–cordierite–sillimanite–staurolite assemblages in pelitic protoliths, indicating HT–LP (Buchan-type) metamorphism. The PMC was exhumed as a core complex at moderate rates (c. 0.7–1.0 mm/yr) accompanied by rapid cooling in the Plio-Pleistocene. Some of the UHP rocks were transported to the surface at significantly higher rates (⩾16 mm/yr). The results of our study do not support recent plate tectonic reconstructions that propose a NW Australia margin origin for the West Sulawesi block (e.g. Hall et al., 2009).