300 resultados para european projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A commitment in 2010 by the Australian Federal Government to spend $466.7 million dollars on the implementation of personally controlled electronic health records (PCEHR) heralded a shift to a more effective and safer patient centric eHealth system. However, deployment of the PCEHR has met with much criticism, emphasised by poor adoption rates over the first 12 months of operation. An indifferent response by the public and healthcare providers largely sceptical of its utility and safety speaks to the complex sociotechnical drivers and obstacles inherent in the embedding of large (national) scale eHealth projects. With government efforts to inflate consumer and practitioner engagement numbers giving rise to further consumer disillusionment, broader utilitarian opportunities available with the PCEHR are at risk. This paper discusses the implications of establishing the PCEHR as the cornerstone of a holistic eHealth strategy for the aggregation of longitudinal patient information. A viewpoint is offered that the real value in patient data lies not just in the collection of data but in the integration of this information into clinical processes within the framework of a commoditised data-driven approach. Consideration is given to the eHealth-as-a-Service (eHaaS) construct as a disruptive next step for co-ordinated individualised healthcare in the Australian context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public engagement is an essential process for major municipal infrastructure and construction projects as it serves to identify the interests and concerns of citizens before the planning and design are finalised and thus ensures the schemes are beneficial to all sectors of the community. However, the success of public engagement depends on a number of factors, not least the suitability of the engagement methods used, representativeness and activeness of participants, time pressure, financial constraint and so on. In Hong Kong, the community has experienced discontent with several major projects recently, suggesting the need to examine the effectiveness of its current public engagement mechanism. This paper reports the results of a series of interviews with a variety of stakeholders – indicating the need for a carefully considered public engagement plan to be established at the beginning to drive the process and more experienced people to lead and facilitate the engagement process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Phishing and related cybercrime is responsible for billions of dollars in losses annually. Gartner reported more than 5 million U.S. consumers lost money to phishing attacks in the 12 months ending in September 2008 (Gartner 2009). This paper asks whether the majority of organised phishing and related cybercrime originates in Eastern Europe rather than elsewhere such as China or the USA. The Russian “Mafiya” in particular has been popularised by the media and entertainment industries to the point where it can be hard to separate fact from fiction but we have endeavoured to look critically at the information available on this area to produce a survey. We take a particular focus on cybercrime from an Australian perspective, as Australia was one of the first places where Phishing attacks against Internet banks were seen. It is suspected these attacks came from Ukrainian spammers. The survey is built from case studies both where individuals from Eastern Europe have been charged with related crimes or unsolved cases where there is some nexus to Eastern Europe. It also uses some earlier work done looking at those early Phishing attacks, archival analysis of Phishing attacks in July 2006 and new work looking at correlation between the Corruption Perception Index, Internet penetration and tertiary education in Russia and the Ukraine. The value of this work is to inform and educate those charged with responding to cybercrime where a large part of the problem originates and try to understand why.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a post-disaster environment, housing reconstruction projects frequently face enormous difficulties due to the various, often apparently ill-considered, internal and external factors. Non-Governmental Organisations (NGOs) operating in post-disaster settings such as in Afghanistan continue to face blame over the failure of reconstruction projects, and worse, they are sometimes even viewed as being corrupt entities. While it is not always possible for NGOs to eliminate or reduce the impact of factors that are outside their control, they certainly can increase the chances of project success by placing considerable emphasis on working more effectively with the affected communities. To achieve maximum community participation in reconstruction projects , this research develops a specific logical framework to guide the process of community participation in post-disaster housing reconstruction in Afghanistan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State and local governments frequently look to flagship cultural projects to improve the city image and catalyze tourism but, in the process, often overlook their potential to foster local arts development. To better understand this role, the article examines if and how cultural institutions in Los Angeles and San Francisco attract and support arts-related activity. The analysis reveals that cultural flagships have mixed success in generating arts-based development and that their ability may be improved through attention to the local context, facility and institutional characteristics, and the approach of the sponsoring agencies. Such knowledge is useful for planners to enhance their revitalization efforts, particularly as the economic development potential of arts organizations and artists has become more apparent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Occupational segregation is a major source of labour market rigidity and economic inefficiency due to a waste of human resources. Organisations are repeatedly recognised as gendered constructs exhibiting sustained work segregation, income and status inequality, as well as cultural and individual images of gender, and these are perpetuated through their processes, practices and pressures (Acker, 1990). A large percentage of Australia’s workforce is now employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. For a continued strong performance in this economy, organisations that employ project personnel will need to consider how they address inclusivity and equality in diversity in project based temporary organisations to ensure the supply of high quality project professionals into the future. This paper investigates the inclusion processes experienced and exercised by men and women working in temporary organisations in project situations through a review of reports on the inclusion processes experienced by 60 project managers and project workers in three project based industries in Australia. Results indicate that temporary organisations are not implementing equality and diversity management strategies at the macro level and project workers are accepting this lack of recognition. However inclusivity and equality at the micro level of the team is seen as vital.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A collection of design projects accepted for exhibition at the 2013 ACSA Fall Conference.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.