213 resultados para constructive heuristic algorithm


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study presents a comprehensive mathematical formulation model for a short-term open-pit mine block sequencing problem, which considers nearly all relevant technical aspects in open-pit mining. The proposed model aims to obtain the optimum extraction sequences of the original-size (smallest) blocks over short time intervals and in the presence of real-life constraints, including precedence relationship, machine capacity, grade requirements, processing demands and stockpile management. A hybrid branch-and-bound and simulated annealing algorithm is developed to solve the problem. Computational experiments show that the proposed methodology is a promising way to provide quantitative recommendations for mine planning and scheduling engineers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A5-GMR-1 is a synchronous stream cipher used to provide confidentiality for communications between satellite phones and satellites. The keystream generator may be considered as a finite state machine, with an internal state of 81 bits. The design is based on four linear feedback shift registers, three of which are irregularly clocked. The keystream generator takes a 64-bit secret key and 19-bit frame number as inputs, and produces an output keystream of length between $2^8$ and $2^{10}$ bits. Analysis of the initialisation process for the keystream generator reveals serious flaws which significantly reduce the number of distinct keystreams that the generator can produce. Multiple (key, frame number) pairs produce the same keystream, and the relationship between the various pairs is easy to determine. Additionally, many of the keystream sequences produced are phase shifted versions of each other, for very small phase shifts. These features increase the effectiveness of generic time-memory tradeoff attacks on the cipher, making such attacks feasible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Virtual Machine (VM) management is an obvious need in today's data centers for various management activities and is accomplished in two phases— finding an optimal VM placement plan and implementing that placement through live VM migrations. These phases result in two research problems— VM placement problem (VMPP) and VM migration scheduling problem (VMMSP). This research proposes and develops several evolutionary algorithms and heuristic algorithms to address the VMPP and VMMSP. Experimental results show the effectiveness and scalability of the proposed algorithms. Finally, a VM management framework has been proposed and developed to automate the VM management activity in cost-efficient way.