233 resultados para Soil conservation projects
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.
Resumo:
Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.
Resumo:
Expert knowledge is used widely in the science and practice of conservation because of the complexity of problems, relative lack of data, and the imminent nature of many conservation decisions. Expert knowledge is substantive information on a particular topic that is not widely known by others. An expert is someone who holds this knowledge and who is often deferred to in its interpretation. We refer to predictions by experts of what may happen in a particular context as expert judgments. In general, an expert-elicitation approach consists of five steps: deciding how information will be used, determining what to elicit, designing the elicitation process, performing the elicitation, and translating the elicited information into quantitative statements that can be used in a model or directly to make decisions. This last step is known as encoding. Some of the considerations in eliciting expert knowledge include determining how to work with multiple experts and how to combine multiple judgments, minimizing bias in the elicited information, and verifying the accuracy of expert information. We highlight structured elicitation techniques that, if adopted, will improve the accuracy and information content of expert judgment and ensure uncertainty is captured accurately. We suggest four aspects of an expert elicitation exercise be examined to determine its comprehensiveness and effectiveness: study design and context, elicitation design, elicitation method, and elicitation output. Just as the reliability of empirical data depends on the rigor with which it was acquired so too does that of expert knowledge.
Resumo:
Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.
Resumo:
The 2010 LAGI competition was held on three underutilized sites in the United Arab Emirates. By choosing Staten Island, New York in 2012 the competition organises have again brought into question new roles for public open space in the contemporary city. In the case of the UEA sites, the competition produced many entries which aimed to create a sculpture and by doing so, they attracted people to the selected empty spaces in an arid climate. In a way these proposals were the incubators and the new characters of these empty spaces. The competition was thus successful at advancing understandings of the expanded role of public open spaces in EAU and elsewhere. LAGI 2012 differs significantly to the UAE program because Fresh Kills Park has already been planned as a public open space for New Yorkers - with or without these clean energy sculptures. Furthermore, Fresh Kills Park is already an (gas) energy generating site in its own right. We believe Fresh Kills Park, as a site, presents a problem which somewhat transcends the aims of the competition brief. Advancing a sustainable urban design proposition for the site therefore requires a fundamental reconsideration of the established paradigms public open space. Hence our strategy is to not only create an energy generating, site specific art work, but to create synergy between the public and the site engagement while at the same time complement the idiosyncrasies of the pre-existing engineered landscape. Current PhD research about energy generation in public open spaces informs this work.
Resumo:
Genetic variation at allozyme and mitochondrial DNA loci was investigated in the Australian lungfish, Neoceratodus forsteri Krefft 1870. Tissue samples for genetic analysis were taken non-lethally from 278 individuals representing two spatially distinct endemic populations (Mary and Burnett rivers), as well as one population thought to be derived from an anthropogenic translocation in the 1890's (Brisbane river). Two of 24 allozyme loci resolved from muscle tissue were polymorphic. Mitochondrial DNA nucleotide sequence diversity estimated across 2,235 base pairs in each of 40 individuals ranged between 0.000423 and 0.001470 per river. Low genetic variation at allozyme and mitochondrial loci could be attributed to population bottlenecks, possibly induced by Pleistocene aridity. Limited genetic differentiation was detected among rivers using nuclear and mitochondrial markers suggesting that admixture may have occurred between the endemic Mary and Burnett populations during periods of low sea level when the drainages may have converged before reaching the ocean. Genetic data was consistent with the explanation that lungfish were introduced to the Brisbane river from the Mary river. Further research using more variable genetic loci is needed before the conservation status of populations can be determined, particularly as anthropogenic demands on lungfish habitat are increasing. In the interim we recommend a management strategy aimed at conserving existing genetic variation within and between rivers.
Resumo:
Background The onsite treatment of sewage and effluent disposal is widely prevalent in rural and urban fringe areas due to the general unavailability of reticulated wastewater collection systems. Despite the low technology of the systems, failure is common and in many cases leading to adverse public health and environmental consequences. It is important therefore that careful consideration is given to the design and location of onsite sewage treatment systems. This requires an understanding of the factors that influence treatment performance. The use of subsurface absorption systems is the most common form of effluent disposal for onsite sewage treatment, particularly for septic tanks. Also, in the case of septic tanks, a subsurface disposal system is generally an integral component of the sewage treatment process. Site specific factors play a key role in the onsite treatment of sewage. The project The primary aims of the research project were: • to relate treatment performance of onsite sewage treatment systems to soil conditions at site; • to evaluate current research relating to onsite sewage treatment; and, • to identify key issues where currently there is a lack of relevant research. These tasks were undertaken with the objective of facilitating the development of performance based planning and management strategies for onsite sewage treatment. The primary focus of this research project has been on septic tanks. By implication, the investigation has been confined to subsurface soil absorption systems. The design and treatment processes taking place within the septic tank chamber itself did not form a part of the investigation. Five broad categories of soil types prevalent in the Brisbane region have been considered in this project. The number of systems investigated was based on the proportionate area of urban development within the Brisbane region located on each of the different soil types. In the initial phase of the investigation, the majority of the systems evaluated were septic tanks. However, a small number of aerobic wastewater treatment systems (AWTS) were also included. The primary aim was to compare the effluent quality of systems employing different generic treatment processes. It is important to note that the number of each different type of system investigated was relatively small. Consequently, this does not permit a statistical analysis to be undertaken of the results obtained for comparing different systems. This is an important issue considering the large number of soil physico-chemical parameters and landscape factors that can influence treatment performance and their wide variability. The report This report is the last in a series of three reports focussing on the performance evaluation of onsite treatment of sewage. The research project was initiated at the request of the Brisbane City Council. The project component discussed in the current report outlines the detailed soil investigations undertaken at a selected number of sites. In the initial field sampling, a number of soil chemical properties were assessed as indicators to investigate the extent of effluent flow and to help understand what soil factors renovate the applied effluent. The soil profile attributes, especially texture, structure and moisture regime were examined more in an engineering sense to determine the effect of movement of water into and through the soil. It is important to note that it is not only the physical characteristics, but also the chemical characteristics of the soil as well as landscape factors play a key role in the effluent renovation process. In order to understand the complex processes taking place in a subsurface effluent disposal area, influential parameters were identified using soil chemical concepts. Accordingly, the primary focus of this final phase of the research project was to identify linkages between various soil chemical parameters and landscape patterns and their contribution to the effluent renovation process. The research outcomes will contribute to the development of robust criteria for evaluating the performance of subsurface effluent disposal systems. The outcomes The key findings from the soil investigations undertaken are: • Effluent renovation is primarily undertaken by a combination of various soil physico-chemical parameters and landscape factors, thereby making the effluent renovation processes strongly site dependent. • Decisions regarding site suitability for effluent disposal should not be based purely in terms of the soil type. A number of other factors such as the site location in the catena, the drainage characteristics and other physical and chemical characteristics, also exert a strong influence on site suitability. • Sites, which are difficult to characterise in terms of suitability for effluent disposal, will require a detailed soil physical and chemical analysis to be undertaken to a minimum depth of at least 1.2 m. • The Ca:Mg ratio and Exchangeable Sodium Percentage are important parameters in soil suitability assessment. A Ca:Mg ratio of less than 0.5 would generally indicate a high ESP. This in turn would mean that Na and possibly Mg are the dominant exchangeable cations, leading to probable clay dispersion. • A Ca:Mg ratio greater than 0.5 would generally indicate a low ESP in the profile, which in turn indicates increased soil stability. • In higher clay percentage soils, low ESP can have a significant effect. • The presence of high exchangeable Na can be counteracted by the presence of swelling clays, and an exchange complex co-dominated by exchangeable Ca and exchangeable Mg. This aids absorption of cations at depth, thereby reducing the likelihood of dispersion. • Salt is continually added to the soil by the effluent and problems may arise if the added salts accumulate to a concentration that is harmful to the soil structure. Under such conditions, good drainage is essential in order to allow continuous movement of water and salt through the profile. Therefore, for a site to be sustainable, it would have a maximum application rate of effluent. This would be dependent on subsurface characteristics and the surface area available for effluent disposal. • The dosing regime for effluent disposal can play a significant role in the prevention of salt accumulation in the case of poorly draining sites. Though intermittent dosing was not considered satisfactory for the removal of the clogging mat layer, it has positive attributes in the context of removal of accumulated salts in the soil.
Resumo:
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
The work by graduate teachers in this volume represent intentional design of learning experiences using technology for Early Childhood settings. They were given a two-part design task: a sequence of lessons organised around a themed project; and the collection of resources to support such activities. The project had to be constructive in nature where the children built objects and representations that were meaningful to them. The excellent works presented here offer a range of approaches that would be suitable in a variety of contexts. Because they are reasoned, these projects offer flexibility in implementation along with confidence that they would be effective.
Resumo:
Acid sulfate soils (ASS) are one of the stressor factors that cause many mangrove restoration projects to fail. Achieving successful rehabilitation in an ASS affected area requires an understanding of the geochemical conditions that influence the establishment and growth of mangrove seedlings. This study evaluated the effect of tidal inundation on geochemical conditions on sub layer to better understand their impacts on the density, establishment, and growth of mangrove seedlings. This study also examined the geochemical conditions under which mangrove seedlings can establish naturally, and/or be replanted in abandoned aquaculture ponds. The study area was in an area of abandoned aquaculture ponds situated in the Mare District, adjacent to Bone Bay, South Sulawesi, Indonesia.The pH, pHfox, redox potential, organic content, water soluble sulfate, SKCl, SPOS, and grain size of the soil from the sediment core at + 10 - 15 cm depth near roots were measured using. Pyrite analysis were conducted for the top and sub sediments. The density, establishment, and the relative root growth of Rhizophoraceae were also determined. Free tidal inundation at abandoned pond sites improved the sediment quality. The high density, establishment, and growth of mangrove seedlings were characterized by freely drained areas with a higher pH (field and oxidisable), lower organic content, and high proportion of silt/clay. Higher density and growth also correlated to reduced environments. Sulfur species did not influence the density, establishment, and growth of the seedlings directly. The supply of propagules from the mangrove stands, or access from good waterways were also important for seedlings to establish naturally.
Resumo:
Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.