266 resultados para Projects in dispute


Relevância:

80.00% 80.00%

Publicador:

Resumo:

President’s Message AITPM President’s Message, July 2009 Hello fellow AITPM members, It’s now very early July so many Australians are going to experience a range of new, or increases in, fees, charges, and perhaps taxes by State and local governments. For example, Queenslanders are to be hit at the petrol pump, no longer living with the luxury of the State’s previous 8c per litre fuel subsidy, bringing general motorists’ fuel costs into line with the other States. A consolation is that they now don’t have to live with the real or perceived “price gouging” that has appeared in the past to make Queensland prices much closer than 8c to those in other States. Environmental lobbyists argue that this Government’s decision brings public transport costs closer to parity with private transport. However, my sense from sloppy petrol price elasticities is that the State’s motorists will get used to the reversal of what was a reverse tax pretty quickly, an amount which can be less than day-of-the week fluctuation. On the other hand, withholding this State revenue may help in some way the funding of the several major public transport infrastructure projects in progress; not to mention some of the cost of running the Transit Authority’s expanding service commitments. Other policy actions, such as a Federal Government review of taxation on employees’ package vehicles, which might discourage rather than encourage excess kilometres travelled, may have a greater environmental benefit. Of course, a downside is that many vehicles used so are Australian built, and discouraging fleet turnover may damage an industry which faces ever increasing uncertainty, and particularly at the present, is in need of some care and attention. I for one hope to this end that the new 4 cylinder (1.8L petrol or 2L diesel) so called “true Holden” Cruze and Toyota’s pending Camry Hybrid are both roaring successes, and will be taken up in droves as fleet and employee use vehicles. I’m not sure what drive-trains Ford and Holden plan to drop into their next full sized models but even if they’re not Australian sourced, let’s hope they coordinate the requisite performance expected by the “Aussie Battler” with suitable green credentials. I am also encouraged to see that already many Government fleet vehicles are smaller in size, but still fit for purpose. For instance, my local police station uses the Camry based Aurion as a district car. I close again in reminding everyone that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

80.00% 80.00%

Publicador:

Resumo:

PPPs are held to be a powerful way of mobilising private finance and resources to deliver public infrastructure. Theoretically, research into procurement has begun to acknowledge difficulties with the classification and assessment of different types of procurement, particularly those which do not sufficiently acknowledge variety within specific types of procurement methods. This paper advances a theoretical framework based on an evolutionary economic conceptualisation of a routine, which can accommodate the variety evident in procurement projects, in particular PPPs. The paper tests how the various elements of a PPP, as advanced in the theoretical framework, affect performance across 10 case studies. It concludes, that a limited number of elements of a PPP affect their performance, and provides strong evidence for the theoretical model advanced in this paper.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The selection criteria for contractor pre-qualification are characterized by the co-existence of both quantitative and qualitative data. The qualitative data is non-linear, uncertain and imprecise. An ideal decision support system for contractor pre-qualification should have the ability of handling both quantitative and qualitative data, and of mapping the complicated nonlinear relationship of the selection criteria, such that rational and consistent decisions can be made. In this research paper, an artificial neural network model was developed to assist public clients identifying suitable contractors for tendering. The pre-qualification criteria (variables) were identified for the model. One hundred and twelve real pre-qualification cases were collected from civil engineering projects in Hong Kong, and eighty-eight hypothetical pre-qualification cases were also generated according to the “If-then” rules used by professionals in the pre-qualification process. The results of the analysis totally comply with current practice (public developers in Hong Kong). Each pre-qualification case consisted of input ratings for candidate contractors’ attributes and their corresponding pre-qualification decisions. The training of the neural network model was accomplished by using the developed program, in which a conjugate gradient descent algorithm was incorporated for improving the learning performance of the network. Cross-validation was applied to estimate the generalization errors based on the “re-sampling” of training pairs. The case studies show that the artificial neural network model is suitable for mapping the complicated nonlinear relationship between contractors’ attributes and their corresponding pre-qualification (disqualification) decisions. The artificial neural network model can be concluded as an ideal alternative for performing the contractor pre-qualification task.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Many studies in the area of project management and social networks have identified the significance of project knowledge transfer within and between projects. However, only few studies have examined the intra- and inter-projects knowledge transfer activities. Knowledge in projects can be transferred via face-to-face interactions on the one hand, and via IT-based tools on the other. Although companies have allocated many resources to the IT tools, it has been found that they are not always effectively utilised, and people prefer to look for knowledge using social face-to-face interactions. This paper explores how to effectively leverage two alternative knowledge transfer techniques, face-to-face and IT-based tools to facilitate knowledge transfer and enhance knowledge creation for intra- and inter-project knowledge transfer. The paper extends the previous research on the relationships between and within teams by examining the project’s external and internal knowledge networks concurrently. Social network qualitative analysis, using a case study within a small-medium enterprise, was used to examine the knowledge transfer activities within and between projects, and to investigate knowledge transfer techniques. This paper demonstrates the significance of overlapping employees working simultaneously on two or more projects and their impact on facilitating knowledge transfer between projects within a small/medium organisation. This research is also crucial to gaining better understanding of different knowledge transfer techniques used for intra- and inter-project knowledge exchange. The research provides recommendations on how to achieve better knowledge transfer within and between projects in order to fully utilise a project’s knowledge and achieve better project performance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This project is the result of a collaborative design process involving QUT School of Design, and AREN Consulting and ZIAD (Zheijiang Provincial Institute of Architectural Design and Research). This project is the submission prepared by the above partnership for an invited international design competition, promoted by Hangzhou City, China. ---------- This major urban design and architecture project is for a large transport oriented development on the new Hangzhou Subway system. The development, covering several city blocks, includes the provision of residential, retail, education, commercial, and transport infrastructure; integrated with rail, bus and ferry systems. ---------- The design strategies are based on the development or artificial land forms; the cutting of new canals, raising of the ground plane, and metaphoric reference to the Yellow Mountains (explored in the detail of the central ‘ridge’ of built form). Further to this, the project explores the integration of sustainable technologies and philosophies with large scale building projects in a subtropical context.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

While raised floors as a building component has been around since the 70's, its application in terms of a holistic system in the fit-out of commercial office buildings has not been fully embraced due to some inherent problems and negative perceptions of the stakeholders involved. Today, the new generation of raised floor systems(RFS) offers a suite of innovative and integrated products and solutions, and as such are not only suitable for the changing office space requirements, but also capable of meeting tbe smart and sustainable challenges, which are becoming the prerequisite in the refurbishment of existing buildings. As there has been a prediction for continued growth in refurbishment projects in major cities around the globe, RFS as an alternative methodology warrants new examination and highlight. This paper introduces research recently completed in Australia that provided a holistic approach to the application of RFS enabled by intelligent building technologies, and examined key issues of project development when refurbishing commercial office buildings. It focuses on the constructability of RFS, and how it will respond to smart feature requirements in buildings while extending service life, meeting new organisational change and workplace health needs for applications in today's office environment. It also introduces key project procurement issues and the integrated decision support when dealing with the refurbishment of office buildings. The paper recommends procurement strategies as well as the justification of adopting the RFS technology in the Australian office building sector. Given the current economic downturn, refitting as opposed to new build .projects will come onto the spotlight. This paper will provide valuable information for building owners and developers alike when contemplating the retrofit of office buildings.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We review all journal articles based on “PSED-type” research, i.e., longitudinal, empirical studies of large probability samples of on-going, business start-up efforts. We conclude that the research stream has yielded interesting findings; sometimes by confirming prior research with a less bias-prone methodology and at other times by challenging whether prior conclusions are valid for the early stages of venture development. Most importantly, the research has addressed new, process-related research questions that prior research has shunned or been unable to study in a rigorous manner. The research has revealed an enormous and fascinating variability in new venture creation that also makes it challenging to arrive at broadly valid generalizations. An analysis of the findings across studies as well as an examination of those studies that have been relatively more successful at explaining outcomes give good guidance regarding what is required in order to achieve strong and credible results. We compile and present such advice to users of existing data sets and designers of new projects in the following areas: Statistically representative and/or theoretically relevant sampling; Level of analysis issues; Dealing with process heterogeneity; Dealing with other heterogeneity issues, and Choice and interpretation of dependent variables.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The chapters of this book form a persuasive chorus of social practices that advocate the use of music to build a capacity for resilience in individuals and groups. As a whole they exemplify music projects that share common features aligned with an ecological view of reform in health, education and social work systems. Internationally renowned and early career academics have collaborated with practitioners to sing ‘Songs of Resilience’; some of which are narratives that report on the effects of music practices for a general population, and some are based on a specific approach, genre or service. Others are quite literally ‘songs’ that demonstrate aspects of resilience in action. The book makes the connection between music and resilience explicit by posing the following questions—Do music projects in education, health and social services build a measurable capacity for resilience amongst individuals? Can we replicate these projects’ outcomes to develop a capacity for resilience in diverse cultural groups? Does shared use of the term ‘resilience’ help to secure funding for innovative musical activities that provide tangible health, education and social outcomes?

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Longitudinal panel studies of large, random samples of business start-ups captured at the pre-operational stage allow researchers to address core issues for entrepreneurship research, namely, the processes of creation of new business ventures as well as their antecedents and outcomes. Here, we perform a methods-orientated review of all 83 journal articles that have used this type of data set, our purpose being to assist users of current data sets as well as designers of new projects in making the best use of this innovative research approach. Our review reveals a number of methods issues that are largely particular to this type of research. We conclude that amidst exemplary contributions, much of the reviewed research has not adequately managed these methods challenges, nor has it made use of the full potential of this new research approach. Specifically, we identify and suggest remedies for context-specific and interrelated methods challenges relating to sample definition, choice of level of analysis, operationalization and conceptualization, use of longitudinal data and dealing with various types of problematic heterogeneity. In addition, we note that future research can make further strides towards full utilization of the advantages of the research approach through better matching (from either direction) between theories and the phenomena captured in the data, and by addressing some under-explored research questions for which the approach may be particularly fruitful.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In the networked information driven world that we now inhabit the ability to access and reuse information, data and culture is a key ingredient to social, economic and cultural innovation. As government holds enormous amounts of publicly funded material that can be released to the public without breaching the law it should move to implement policies that will allow better access to and reuse of that information, knowledge and culture. The Queensland Government Information Licensing Framework (GILF) Project4 is one of the first projects in the world to systemically approach this issue and should be consulted as a best practice model.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.