261 resultados para Petroleum contracts
Resumo:
Located in the Gulf of Mexico in nearly 8,000 feet of water, the Perdido development is the world’s deepest spar and Shell’s first Smart Field in the Western hemisphere. Jointly developed by Shell, BP, and Chevron, the spar and the subsea equipment connected to it will eventually capture approximately an order of magnitude more data than is collected from any other Shell-designed and managed development currently operating in the Gulf of Mexico. This paper will describe Shell’s Smart Fields design philosophy, briefly explain the five design elements that underpin “smartness” in Shell’s North and South American operations—specifically, remote assisted operations, exception-based surveillance, collaborative work environments, hydrocarbon development tools and workflows, and Smart Fields Foundation IT infrastructure—and shed light on the process by which a highly customized Smart Fields development and management plan was put together for Perdido.
Resumo:
The Smart Fields programme has been active in Shell over the last decade and has given large benefits. In order to understand the value and to underpin strategies for the future implementation programme, a study was carried out to quantify the benefits to date. This focused on actually achieved value, through increased production or lower costs. This provided an estimate of the total value achieved to date. Future benefits such as increased reserves or continued production gain were recorded separately. The paper describes the process followed in the benefits quantification. It identifies the key solutions and technologies and describes the mechanism used to understand the relation between solutions and value. Examples have been given of value from various assets around the world, in both existing fields and in green fields. Finally, the study provided the methodology for tracking of value. This helps Shell to estimate and track the benefits of the Smart Fields programme at company scale.
Resumo:
Construction contracts often provide that decisions under the contract will be made by a certifier. This paper reviews the liability issues when a certifier makes a mistake. We do that in light of recent pronouncements by the High Court of Australia and the New South Wales Court of Appeal on negligence. We look at this question in the context of traditional construction contract arrangements and also consider the implications for Public Private Partnerships and the typical contract arrangements entered into to facilitate these transactions.
Resumo:
In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
"Fully updated to reflect the rapid pace of change in the health law areas. Explains the legal process as it relates to the health care professional."--Libraries Australia. Table of Contents Part I. Introductory concepts -- 1. What is law -- 2. The legal structure -- 3. The legal process -- Part II. Patient relationships -- 4. Consent to health care by a competent adult -- 5. Consent to health care by a legally incompetent person -- 6. Negligence -- 7. Patient information and privacy -- 8. Patients' property -- 9. Contract -- Part III. Employment -- 10. Contracts to provide health care services -- 011. Accidents and injuries related to health care --12. Registration and practice --13. Drugs --14. Criminal law and health care --15. State involvement in birth and death: registration and coronial inquiries --16. State involvement in threats to health or welfare --17. Human tissue transplants and reproductive technology --18. Expanding recognition of human rights --19. Decision making, law and ethics: a discussion.
Resumo:
Experience gained from numerous projects conducted by the U.S. Environmental Protection Agency's (EPA) Environmental Monitoring Systems Laboratory in Las Vegas, Nevada has provided insight to functional issues of mapping, monitoring, and modeling of wetland habitats. Three case studies in poster form describe these issues pertinent to managing wetland resources as mandated under Federal laws. A multiphase project was initiated by the EPA Alaska operations office to provide detailed wetland mapping of arctic plant communities in an area under petroleum development pressure. Existing classification systems did not meet EPA needs. Therefore a Habitat Classification System (HCS) derived from aerial photography was compiled. In conjunction with this photointerpretive keys were developed. These products enable EPA personnel to map large inaccessible areas of the arctic coastal plain and evaluate the sensitivity of various wetland habitats relative to petroleum development needs.
Resumo:
Due to rapidly diminishing international supplies of fossil fuels, such as petroleum and diesel, the cost of fuel is constantly increasing, leading to higher costs of living, as a result of the significant reliance of many industries on motor vehicles. Many technologies have been developed to replace part or all of a fossil fuel with bio-fuels. One of the dual fuel technologies is fumigation of ethanol in diesel engines, which injects ethanol into the intake air stream of the engine. The advantage of this is that it avoids any costly modification of the engine high pressure diesel injection system, while reducing the volume of diesel required and potentially increasing the power output and efficiency. This paper investigates the performance of a diesel engine, converted to implement ethanol fumigation. The project will use both existing experimental data, along with generating computer modeled results using the program AVL Boost. The data from both experiments and the numerical simulation indicate desirable results for the peak pressure and the indicated mean effective pressure (IMEP). Increase in ethanol substitution resulted in elevated combustion pressure and an increase in the IMEP, while the variation of ethanol injection location resulted in negligible change. These increases in cylinder pressure led to a higher work output and total efficiency in the engine as the ethanol substitution was increased. In comparing the numerical and experimental results, the simulation showed a slight elevation, due to the inaccuracies in the heat release models. Future work is required to improve the combustion model and investigate the effect of the variation of the location of ethanol injection.
Resumo:
Biodiesel derived from microalgae is one of a suite of potential solutions to meet the increasing demand for a renewable, carbon-neutral energy source. However, there are numerous challenges that must be addressed before algae biodiesel can become commercially viable. These challenges include the economic feasibility of harvesting and dewatering the biomass and the extraction of lipids and their conversion into biodiesel. Therefore, it is essential to find a suitable extraction process given these processes presently contribute significantly to the total production costs which, at this stage, inhibit the ability of biodiesel to compete financially with petroleum diesel. This study focuses on pilot-scale (100 kg dried microalgae) solvent extraction of lipids from microalgae and subsequent transesterification to biodiesel. Three different solvents (hexane, isopropanol (IPA) and hexane + IPA (1:1)) were used with two different extraction methods (static and Soxhlet) at bench-scale to find the most suitable solvent extraction process for the pilot-scale. The Soxhlet method extracted only 4.2% more lipid compared to the static method. However, the fatty acid profiles of different extraction methods with different solvents are similar, suggesting that none of the solvents or extraction processes were biased for extraction of particular fatty acids. Considering the cost and availability of the solvents, hexane was chosen for pilot-scale extraction using static extraction. At pilot-scale the lipid yield was found to be 20.3% of total biomass which is 2.5% less than from bench scale. Extracted fatty acids were dominated by polyunsaturated fatty acids (PUFAs) (68.94±0.17%) including 47.7±0.43 and 17.86±0.42% being docosahexaenoic acid (DHA) (C22:6) and docosapentaenoic acid (DPA) (C22:5, ω-3), respectively. These high amounts of long chain poly unsaturated fatty acids are unique to some marine microalgae and protists and vary with environmental conditions, culture age and nutrient status, as well as with cultivation process. Calculated physical and chemical properties of density, viscosity of transesterified fatty acid methyl esters (FAMEs) were within the limits of the biodiesel standard specifications as per ASTM D6751-2012 and EN 14214. The calculated cetane number was, however, significantly lower (17.8~18.6) compared to ASTM D6751-2012 or EN 14214-specified minimal requirements. We conclude that the obtained microalgal biodiesel would likely only be suitable for blending with petroleum diesel to a maximum of 5 to 20%.
Resumo:
There is an increasing need for biodegradable, environmentally friendly plastics to replace the petroleum-based non-degradable plastics which litter and pollute the environment. Starch-based plastic film composites are becoming a popular alternative because of their low cost, biodegradability, the abundance of starch, and ease with which starch-based films can be chemically modified. This paper reports on the results of using sugar cane bagasse nanofibres to improve the physicochemical properties of starch-based polymers. The addition of bagasse nanofibre (2.5, 5, 10 or 20 wt%) to (modified) potato starch (‘Soluble starch’) reduced the moisture uptake by up to 17 % at 58 % relative humidity (RH). The film’s tensile strength and Young’s Modulus increased by up to 100 % and 200 % with 10 wt% and 20 wt% nanofibre respectively at 58% RH. The tensile strain reduced by up to 70 % at 20 wt% fibre loading. These results indicate that addition of sugar cane bagasse nanofibres significantly improved the properties of starch-based plastic films
Resumo:
This project was a step forward in developing a 'descriptive theory' of contracting in the oil and gas industry that reflects the operating environment in which the project manager operates. This study investigates the existing processes and methods used in establishing contracts which are very often prescriptive, and not always appropriate or optimal for a given situation. This study contributes to contracting effectiveness or optimal contracting in the oil and gas industry.
Resumo:
Fungi are eukaryotic organisms and considered to be less adaptable to extreme environments when compared to bacteria. While there are no thermophilic microfungi in a strict sense, some fungi have adapted to life in the cold. Cold-active microfungi have been isolated from the Antarctic and their enzyme activities explored with a view to finding new candidates for industrial use. On another front, environmental pollution by petroleum products in the Antarctic has led to a search for, and the subsequent discovery of, fungal isolates capable of degrading hydrocarbons. The work has paved the way to developing a bioremedial approach to containing this type of contamination in cold climates. Here we discuss our efforts to map the capability of Antarctic microfungi to degrade oil and also introduce a novel cold-active fungal lipase enzyme.
Resumo:
A multiscale approach that bridges the biophysics of the actin molecules at nanoscale and the biomechanics of actin filament at microscale level is developed and used to evaluate the mechanical performances of actin filament bundles. In order to investigate the contractile properties of skeletal muscle which is induced by the protein motor of myosin, a molecular model is proposed in the prediction of the dynamic behaviors of skeletal muscle based on classic sliding filament model. Randomly distributed myosin motors are applied on a 2.2 μm long sarcomere, whose principal components include actin and myosin filaments. It can be found that, the more myosin motors on the sarcomere, the faster the sarcomere contracts. The result demonstrates that the sarcomere shortening speed cannot increase infinitely by the modulation of myosin, thus providing insight into the self-protective properties of skeletal muscles. This molecular filament sliding model provides a theoretical way to evaluate the properties of skeletal muscles, and contributes to the understandings of the molecular mechanisms in the physiological phenomenon of muscular contraction.
Resumo:
The accuracy of early cost estimates is critical to the success of construction projects. The selected tender price (clients' building cost) is usually seen in previous research as a holistic dependent variable when examining early stage estimates. Unlike other components of construction cost, the amount of contingencies is decided by clients/consultants with consideration of early project information. Cost drivers of contingencies estimates are associated with uncertainty and complexity, and include project size, schedule, ground condition, construction site access, market condition and so on. A path analysis of 133 UK school building contracts was conducted to identify impacts of nine major cost drivers on the determination of contingencies by different clients/cost estimators. This research finds that gross floor area (GFA), schedule and requirement of air conditioning have statistically significant impacts on the contingency determination. The mediating role of schedule between gross floor area and contingencies (GFA→Schedule→Contingencies) was confirmed with the Soble test. The total effects of the three variables on contingencies estimates were obtained with the consideration of this indirect effect. The squared multiple correlation (SMC) of contingencies (=0.624) indicates the identified three variables can explain 62.4% variance of contingencies, and it is comparatively satisfactory considering the heterogeneity among different estimators, unknown estimating techniques and different projects