341 resultados para International symposium
Resumo:
Mutually unbiased bases (MUBs) have been used in several cryptographic and communications applications. There has been much speculation regarding connections between MUBs and finite geometries. Most of which has focused on a connection with projective and affine planes. We propose a connection with higher dimensional projective geometries and projective Hjelmslev geometries. We show that this proposed geometric structure is present in several constructions of MUBs.
Resumo:
Modelling how a word is activated in human memory is an important requirement for determining the probability of recall of a word in an extra-list cueing experiment. Previous research assumed a quantum-like model in which the semantic network was modelled as entangled qubits, however the level of activation was clearly being over-estimated. This paper explores three variations of this model, each of which are distinguished by a scaling factor designed to compensate the overestimation.
Resumo:
This paper describes an analysis of construction project bids to determine (a) the global distribution and (b) factors influencing the distribution of bids. The global distribution of bids was found, by using a battery of ll test statistics, to be approximated by a three-parameter log normal distribution. No global spread parameter was found. A multivariate analysis revealed the year of tender to be the major influencing factor. Consideration of the construction order, tender price and output indices lead to the conclusion that distributional spread reflected the degree of difference in pricing policies between bidders and the skewness of the distributions reflected the degree of competition. The paper concludes with a tentative model of the causal relationships between the factors and distributional characteristics involved.
Resumo:
A theoretical framework for a construction management decision evaluation system for project selection by means of a literature review. The theory is developed by the examination of the major factors concerning the project selection decision from a deterministic viewpoint, where the decision-maker is assumed to possess 'perfect knowledge' of all the aspects involved. Four fundamental project characteristics are identified together with three meaningful outcome variables. The relationship within and between these variables are considered together with some possible solution techniques. The theory is next extended to time-related dynamic aspects of the problem leading to the implications of imperfect knowledge and a nondeterministic model. A solution technique is proposed in which Gottinger's sequential machines are utilised to model the decision process,
Resumo:
Bus Rapid Transit (BRT) station is the interface between passenger and service. The station is crucial to line operation as it is typically the only location where buses can pass each other. Congestion may occur here when buses maneuvering into and out of the platform lane interfere with bus flow, or when a queue of buses forms upstream of the platform lane blocking the passing lane. However, some systems include operation where express buses pass the critical station, resulting in a proportion of non stopping buses. It is important to understand the operation of the critical busway station under this type of operation, as it affects busway line capacity. This study uses micro simulation to treat the BRT station operation and to analyze the relationship between station Limit state bus capacity (B_ls), Total Bus Capacity (B_ttl). First, the simulation model is developed for Limit state scenario and then a mathematical model is defined, calibrated for a specified range of controlled scenarios of mean and coefficient of variation of dwell time. Thereafter, the proposed B_ls model is extended to consider non stopping buses and B_ttlmodel is defined. The proposed models provides better understanding to the BRT line capacity and is useful for transit authorities for designing better BRT operation.
Resumo:
In the last two decades, there are developments that lead to greater understanding on how and why lightweight concretes (LWC) may achieve similar or higher performance than their normal weight counterparts. The present paper reviews some of these aspects beginning with basic properties such as unit weight, compressive strength and specific strength (strength/ unit weight). Stability and workability of LWC is discussed from rheological perspective. The volumetric stability of LWC in terms of shrinkage and creep are presented with some recent published data. Transport properties of the LWC in terms of sorptivity, water permeability and resistance to chloride-ion penetration are reviewed in comparison with normal weight concrete. Fire resistance of LWC and some current measures used to improve the resistance are discussed. With continual research and development, the performance of LWC is being enhanced to provide new opportunities for practical applications.
Resumo:
This poster summarises the current findings from STRC’s Integrated Traveller Information research domain that aims for accurate and reliable travel time prediction, and optimisation of multimodal trips. Following are the three selected discussions: a) Fundamental understanding on the use of Bluetooth MAC Scanner (BMS) for travel time estimation b) Integration of multi-sources (Loops and Bluetooth) for travel time and density estimation c) Architecture for online and predictive multimodal trip planner
Resumo:
Vehicle speed is an important attribute for the utility of a transport mode. The speed relationship between multiple modes of transport is of interest to the traffic planners and operators. This paper quantifies the relationship between bus speed and average car speed by integrating Bluetooth data and Transit Signal Priority data from the urban network in Brisbane, Australia. The method proposed in this paper is the first of its kind to relate bus speed and average car speed by integrating multi-source traffic data in a corridor-based method. Three transferable regression models relating not-in-service bus; in-service bus during peak; and in-service bus during off peak periods with average car are proposed. The models are cross-validated and the interrelationships are significant
Resumo:
The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.
Resumo:
Construction activities have significant impacts on the environment, economy and society. As a result, sustainability has become an agenda in construction related business. This is evidenced by an increasingly number of construction related companies adopting sustainability reporting practice. Construction contractors are no exception. This study aims to investigate the sustainability reporting practices adopted by top Chinese contractors active in the international arena. The focus is placed on those Chinese contractors ranked top 50 by the Engineering News Record (ENR) top 225 international contractors. The results showed that the sustainability reporting practices of these top Chinese contractors, in terms of both approaches and the depth, varied significantly however there is a clear trend of growing level of disclosure of sustainability related information. Similarly, environmental sustainability seems the predominate focus of sustainability reporting exercises of top international contractors from China. These findings help to assist senior management of construction contractors to form business strategies to facilitate disclosure and other sustainability related practices.
Resumo:
The methodology undertaken, the channel model and the system model created for developing a novel adaptive equalization method and a novel channel tracking method for uplink of MU-MIMO-OFDM systems is presented in this paper. The results show that the channel tracking method works with 97% accuracy, while the training-based initial channel estimation method shows poor performance in estimating the actual channel comparatively.
Resumo:
Flood flows in inundated urban environment constitute a natural hazard. During the 12- 13 January 2011 flood of the Brisbane River, detailed water elevation, velocity and suspended sediment data were recorded in an inundated street at the peak of the flood. The field observations highlighted a number of unusual flow interactions with the urban surroundings. These included some slow fluctuations in water elevations and velocity with distinctive periods between 50 and 100 s caused by some local topographic effect (choking), superposed with some fast turbulent fluctuations. The suspended sediment data highlighted some significant suspended sediment loads in the inundated zone.
Resumo:
Time plays an important role in norms. In this paper we start from our previously proposed classification of obligations, and point out some shortcomings of Event Calculus (EC) to represent obligations. We proposed an extension of EC that avoids such shortcomings and we show how to use it to model the various types of obligations.
Resumo:
Crashes on motorway contribute to a significant proportion (40-50%) of non-recurrent motorway congestions. Hence reduce crashes will help address congestion issues (Meyer, 2008). Crash likelihood estimation studies commonly focus on traffic conditions in a Short time window around the time of crash while longer-term pre-crash traffic flow trends are neglected. In this paper we will show, through data mining techniques, that a relationship between pre-crash traffic flow patterns and crash occurrence on motorways exists, and that this knowledge has the potential to improve the accuracy of existing models and opens the path for new development approaches. The data for the analysis was extracted from records collected between 2007 and 2009 on the Shibuya and Shinjuku lines of the Tokyo Metropolitan Expressway in Japan. The dataset includes a total of 824 rear-end and sideswipe crashes that have been matched with traffic flow data of one hour prior to the crash using an incident detection algorithm. Traffic flow trends (traffic speed/occupancy time series) revealed that crashes could be clustered with regards of the dominant traffic flow pattern prior to the crash. Using the k-means clustering method allowed the crashes to be clustered based on their flow trends rather than their distance. Four major trends have been found in the clustering results. Based on these findings, crash likelihood estimation algorithms can be fine-tuned based on the monitored traffic flow conditions with a sliding window of 60 minutes to increase accuracy of the results and minimize false alarms.