230 resultados para Forestry projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bushfire Responsive Architecture proposals (2) detailed in a 144 page document containing orginal architectural designs and site surveys by Dr Ian Weir. Presented in support of Dr Weir's sucessful planning application for the perminant artwork/land art project "Lightsite Perminant" situated on Point Henry, Western Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to provide a contextualised and embedded exploration of how the notions of "practice" and "participation", key concepts in the study of culture and media, are manifest in an example of a complex creative project. This project aimed to engage with refugees and asylum seekers through the co-creation of cultural material and is an outcome of an? ethnographic action research (Tacchi et al. 2003) partnership involving a community development worker in a settlement support agency and a storytelling/community media researcher (the author), along with other project collaborators. The discussion of this project focuses on the role of the facilitator and illustrates the processes of orchestrating a complex project involving a series of linked stages with cumulative effect. As practitioners at this site we are working in the space where personal narratives, participatory arts and media, and the staging of intercultural, civic dialogue events, intersect. Co-creative media facilitation in these contexts involves both managing hybrid communicative spaces and (re)combining the "integrative practices" (Schatzki 1996) of a range of professional approaches and creative roles. This is liminal work, located on the boundaries of several disciplines and practices. Drawing on reflections gathered from collaborative ethnographic descriptions (Bhattacharya 2008), this paper traces moments of practitioner uncertainty that can be linked to the way "practice" and “participation” is problematised within the community cultural development field in a way that is at times an uneasy fit with conventional ways of operating in social service roles. These moments of tension also indicate where this project pushed practitioners into spaces of improvisation and new learning. Keywords: Youth, refugees, community cultural development, co-creative media facilitation, ethnographic action research, intercultural dialogue.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Organizational and technological systems analysis and design practices such as process modeling have received much attention in recent years. However, while knowledge about related artifacts such as models, tools, or grammars has substantially matured, little is known about the actual tasks and interaction activities that are conducted as part of analysis and design acts. In particular, key role of the facilitator has not been researched extensively to date. In this paper, we propose a new conceptual framework that can be used to examine facilitation behaviors in process modeling projects. The framework distinguishes four behavioral styles in facilitation (the driving engineer, the driving artist, the catalyzing engineer, and the catalyzing artist) that a facilitator can adopt. To distinguish between the four styles, we provide a set of ten behavioral anchors that underpin facilitation behaviors. We also report on a preliminary empirical exploration of our framework through interviews with experienced analysts in six modeling cases. Our research provides a conceptual foundation for an emerging theory for describing and explaining different behaviors associated with process modeling facilitation, provides first preliminary empirical results about facilitation in modeling projects, and provides a fertile basis for examining facilitation in other conceptual modeling activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this paper is to develop insights into firms’ strategic capability development processes within product innovation projects. In particular, the research aims at investigating the interactions among product innovation, knowledge processes, and capability development within firms. Building on qualitative data from the auto-industry, our analysis reveals that across four product innovation projects, the case company developed architectural knowledge and capability. Findings reveal that, along with changes at each level of product architecture, “design knowledge” and “design capability” have been developed at the same level of product architecture, leading to capability development at that level. Furthermore, findings suggest that such capability transformation resulting from knowledge and capability creation over the course of case projects leads to modularization of product architecture. Overall, the research contributes to identifying and emphasizing the role of micro processes in capability development and renewal, which in turn enhances our understanding of strategic capability development processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To deliver tangible sustainability outcomes, the infrastructure sector of the construction industry needs to build capacities for the creation, application and management of ever increasing knowledge. This paper intends to establish the importance and key issues of promoting sustainability through knowledge management (KM). It presents a new conceptual framework for managing sustainability knowledge to raise the awareness and direct future research in the field of transport infrastructure, one of the fast growing sectors in Australia. A holistic KM approach is adopted in this research to consider the potential to “deliver the right information to the right person at the right time” in the context of sustainable development of infrastructure. A questionnaire survey among practitioners across the nation confirmed the necessity and identified priority issues of managing knowledge for sustainability. During infrastructure development, KM can help build much needed industry consensus, develop capacity, communicate decisions, and promote specific measures for the pursuit of sustainability. Six essential elements of the KM approach and their priority issues informed the establishment of a conceptual KM framework. The transport infrastructure sector has come to realise that development must not come at the expense of environmental and social objectives. In practice however, it is facing extensive challenges to deliver what has been promised in the sustainability agenda. This research demonstrates the importance of managing sustainability knowledge, integration of various stakeholders, facilitation of plans and actions and delivery of tangible benefits in real projects, as a positive step towards meeting these challenges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background There has been growing interest in mixed species plantation systems because of their potential to provide a range of socio-economic and bio-physical benefits which can be matched to the diverse needs of smallholders and communities. Potential benefits include the production of a range of forest products for home and commercial use; improved soil fertility especially when nitrogen fixing species are included; improved survival rates and greater productivity of species; a reduction in the amount of damage from pests or disease; and improved biodiversity and wildlife habitats. Despite these documented services and growing interest in mixed species plantation systems, the actual planting areas in the tropics are low, and monocultures are still preferred for industrial plantings and many reforestation programs because of perceived higher economic returns and readily available information about the species and their silviculture. In contrast, there are few guidelines for the design and management of mixed-species systems, including the social and ecological factors of successful mixed species plantings. Methods This protocol explains the methodology used to investigate the following question: What is the available evidence for the relative performance of different designs of mixed-species plantings for smallholder and community forestry in the tropics? This study will systematically search, identify and describe studies related to mixed species plantings across tropical and temperate zones to identify the social and ecological factors that affect polyculture systems. The objectives of this study are first to identify the evidence of biophysical or socio-economic factors that have been considered when designing mixed species systems for community and smallholder forestry in the tropics; and second, to identify gaps in research of mixed species plantations. Results of the study will help create guidelines that can assist practitioners, scientists and farmers to better design mixed species plantation systems for smallholders in the tropics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As the social environment begins to create more awareness in the area of conserving the natural environment, a new generation of building has emerged. A trend of constructing buildings that minimise impacts on the environment has been established in the construction industry. Therefore, suitable project management practices have been adopted to efficiently manage the construction of these green buildings. This study aims at investigating practices of project management in traditional and accredited green construction projects, with the purpose of discovering if Green Project Management (GPM) practices can be applied to traditional projects to achieve more successful outcomes. The process of GPM contains what applied to traditional projects, could possibly result in benefits in terms of budget control and constructability. Currently the construction industry has been known to suffer difficulties within these areas; therefore GPM practices could possibly hold a solution to these common problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis developed a thematic structure for evaluating social externalities of major resource projects using a mixed methods approach and structural equation modelling. The implications offer important insights into the extent quality of life is being influenced by coal seam gas projects in regional communities in Southeast Queensland, Australia. Findings show that unresolved concerns of community residents about environmental and social impacts contribute to lower life-satisfaction, inhibit the community to plan for the future, and lead to a weaker local economy.