352 resultados para Infrastructure and Construction Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Multi-outcomes Construction Policies research project, funded by the Cooperative Research Centre for Construction Innovation (Project 2006-036-A), sought to explore the costs and benefits of leveraging social outcomes on public construction contracts. The context of the research project was the trend towards the contracting out of public construction works and the attempts that have been made to use new contractual arrangements with construction companies to construction achieve a wide range of social outcomes. In federal and state jurisdictions it is now common for governments to impose a range of additional requirements on public works contractors that relate to broad social/community objectives. These requirements include commitments to train apprentices and trainees; to provide local and/or indigenous employment opportunities; to buy local materials; and to include art works. The cost and benefits of using public construction contracts to achieve social/community goals have, to our knowledge, not been thoroughly researched in an Australian context. This is likely to reflect in large part the relatively short history of contracting out public works. As Jensen and Stonecash (2004) explain, most previous empirical studies of contracting out have attempted to measure the cost savings achieved through privatization, as this was the focus of policy debate in the 1980s and 1990s. Relatively few studies have addressed the ability of contracting arrangements to ensure the delivery of desired ‘quality’ outcomes1, or the costs of achieving these outcomes via contracting arrangements. One of the potential costs of attempting to leverage social/community outcomes on public construction projects is a reduction in the amount of competition for these projects, with obvious consequences for average bid prices and choice. In jurisdictions, such as Western Australia and Queensland, where currently construction market conditions are already

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Efficient and effective urban management systems for Ubiquitous Eco Cities require having intelligent and integrated management mechanisms. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated, transparent and open decision making mechanism and necessary infrastructure and technologies. In Ubiquitous Eco Cities telecommunication technologies play an important role in monitoring and managing activities over wired, wireless or fibre-optic networks. Particularly technology convergence creates new ways in which the information and telecommunication technologies are used and formed the back bone or urban management systems. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices such as mobile phones and provides opportunities in the management of Ubiquitous Eco Cities. This research paper discusses the recent developments in telecommunication networks and trends in convergence technologies and their implications on the management of Ubiquitous Eco Cities and how this technological shift is likely to be beneficial in improving the quality of life and place of residents, workers and visitors. The research paper reports and introduces recent approaches on urban management systems, such as intelligent urban management systems, that are suitable for Ubiquitous Eco Cities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A successful urban management system for a Ubiquitous Eco City requires an integrated approach. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated, transparent and open decision making mechanism and necessary infrastructure and technologies. Rapidly developing information and telecommunication technologies and their platforms in the late 20th Century improves urban management and enhances the quality of life and place. Telecommunication technologies provide an important base for monitoring and managing activities over wired, wireless or fibre-optic networks. Particularly technology convergence creates new ways in which the information and telecommunication technologies are used. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices such as mobile phones and provides opportunities in the management of Ubiquitous Eco Cities. This paper discusses the recent developments in telecommunication networks and trends in convergence technologies and their implications on the management of Ubiquitous Eco Cities and how this technological shift is likely to be beneficial in improving the quality of life and place. The paper also introduces recent approaches on urban management systems, such as intelligent urban management systems, that are suitable for Ubiquitous Eco Cities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Providing precise positioning services in regional areas to support agriculture, mining, and construction sectors depends on the availability of ground continuously operating GNSS reference stations and communications linking these stations to central computers and users. With the support of CRC for Spatial Information, a more comprehensive review has been completed recently to examine various wired and wireless communication links available for precise positioning services, in particular in the Queensland regional areas. The study covers a wide range of communication technologies that are currently available, including fixed, mobile wireless, and Geo-stationary and or low earth orbiting satellites. These technologies are compared in terms of bandwidth, typical latency, reliability, coverage, and costs. Additionally, some tests were also conducted to determine the performances of different systems in the real environment. Finally, based on user application requirements, the paper discusses the suitability of different communication links.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

High density development has been seen as a contribution to sustainable development. However, a number of engineering issues play a crucial role in the sustainable construction of high rise buildings. Non linear deformation of concrete has an adverse impact on high-rise buildings with complex geometries, due to differential axial shortening. These adverse effects are caused by time dependent behaviour resulting in volume change known as ‘shrinkage’, ‘creep’ and ‘elastic’ deformation. These three phenomena govern the behaviour and performance of all concrete elements, during and after construction. Reinforcement content, variable concrete modulus, volume to surface area ratio of the elements, environmental conditions, and construction quality and sequence influence on the performance of concrete elements and differential axial shortening will occur in all structural systems. Its detrimental effects escalate with increasing height and non vertical load paths resulting from geometric complexity. The magnitude of these effects has a significant impact on building envelopes, building services, secondary systems, and lifetime serviceability and performance. Analytical and test procedures available to quantify the magnitude of these effects are limited to a very few parameters and are not adequately rigorous to capture the complexity of true time dependent material response. With this in mind, a research project has been undertaken to develop an accurate numerical procedure to quantify the differential axial shortening of structural elements. The procedure has been successfully applied to quantify the differential axial shortening of a high rise building, and the important capabilities available in the procedure have been discussed. A new practical concept, based on the variation of vibration characteristic of structure during and after construction and used to quantify the axial shortening and assess the performance of structure, is presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to increase understanding of and delivery to qualitative (or intangible) outcomes and impacts of major economic infrastructure projects (i.e. bridges, roads, water infrastructure and the like), and the role of stakeholder engagement in this process.-------- Recent doctoral research completed at the Queensland University of Technology by the author investigated how the principles of corporate responsibility are applied in the construction sector. This related specifically to major economic infrastructure projects (hereafter referred to as major projects), with particular regard to urban transportation projects. One outcome of this past research was a value-mapping framework which enables organisations to track project outcomes to pre-existing corporate objectives, and report on these throughout the project life-cycle. Two recommendations for future research from that work formed the basis for this current research: • How can qualitative measurables be better integrated into decision-making on major economic infrastructure projects? • How can non-contractual stakeholders be more effectively engaged with on these projects? The link between these two areas may relate to the stakeholders’ role in qualitative indicator identification and measurement. This is a key point for future investigation.---------- The aim of this research is thus to further investigate these two areas, with the intent of (i) better defining the research direction; (ii) identifying potential research partners; and (iii) identify possible sources of future funding.